Pin the parse-only mesh-sdk in the build modules, so they build design 47's manifests (issue 774) #559

Merged
mesh-tools merged 2 commits from fix/774-new-words-first into main 2026-10-30 00:10:08 +00:00
Member

Delivery 1 of design 47's release (group fix/774-new-words-first). Pin-only: mesh-build-go, mesh-build-image and mesh-build-node pin mesh-sdk 78c9ec8 (main + parse-only commit); they parse each manifest they build. No code change. Unit and integration suites and all 22 checks pass at main's tree.

Reviewed-by: rev-47@shanks at 22ff0d1000

Delivery 1 of design 47's release (group fix/774-new-words-first). Pin-only: mesh-build-go, mesh-build-image and mesh-build-node pin mesh-sdk 78c9ec8 (main + parse-only commit); they parse each manifest they build. No code change. Unit and integration suites and all 22 checks pass at main's tree. Reviewed-by: rev-47@shanks at 22ff0d1000f3e4a0d2794255414fd1ad6c84275e
mesh-tools added 2 commits 2026-10-29 23:43:48 +00:00
Pin the parse-only mesh-sdk 78c9ec8 in the build modules, which read each manifest they build, so the new words are read first (issue 774)
mesh/delivery merged: source.main moved to novox/mesh-catalog@f61265f7a0f3
mesh/delivery-group group fix/774-new-words-first merged: every member is merged
mesh/check pass 22ff0d1000f3 on 96b129e54441 | judged by the candidate's mesh-build-go at d351f9c41ff8
22ff0d1000
Author
Member

Delivery novox/mesh-catalog@22ff0d1000f3 — merged since 2026-10-30T00:10:09Z

Source — source.main moved to novox/mesh-catalog@f61265f7a0. Whether it reached the machines is mesh-delivery-view's, derived from source.main, the wants and the haves.

Group fix/774-new-words-first: novox/mesh-catalog@22ff0d1000, novox/mesh-controller@d96542cd25, novox/mesh-delivery@a2dd7a5c37, novox/mesh-host@2fd165f5af, novox/mesh-sdk@78c9ec8817

  • composed together: pass — the checker's verdict at the members' heads (68cb648a8c30)

Transitions

  • 2026-10-29 23:43 (new) → proposed (announced): novox/mesh-catalog#559's head announced
  • 2026-10-29 23:43 proposed → ready (accepted): a verdict names this commit and the trunk's head as its trunk commit, the gate passed or warned, and the repository's own check did not fail; or the check gates no merge (check-gates-merge false)
  • 2026-10-30 00:10 ready → merged (merged): on the trunk its modules follow: merged there

The commit's note under refs/notes/mesh-plan keeps every transition of this change up to its merge: git log --notes=mesh-plan.

<!-- mesh-delivery:view --> **Delivery** `novox/mesh-catalog@22ff0d1000f3` — **merged** since 2026-10-30T00:10:09Z **Source** — source.main moved to novox/mesh-catalog@f61265f7a0f3. Whether it reached the machines is `mesh-delivery-view`'s, derived from `source.main`, the wants and the haves. **Group** `fix/774-new-words-first`: novox/mesh-catalog@22ff0d1000f3, novox/mesh-controller@d96542cd2503, novox/mesh-delivery@a2dd7a5c37ef, novox/mesh-host@2fd165f5af8e, novox/mesh-sdk@78c9ec881771 - composed together: pass — the checker's verdict at the members' heads (68cb648a8c30) **Transitions** - 2026-10-29 23:43 (new) → proposed (announced): novox/mesh-catalog#559's head announced - 2026-10-29 23:43 proposed → ready (accepted): a verdict names this commit and the trunk's head as its trunk commit, the gate passed or warned, and the repository's own check did not fail; or the check gates no merge (check-gates-merge false) - 2026-10-30 00:10 ready → merged (merged): on the trunk its modules follow: merged there The commit's note under `refs/notes/mesh-plan` keeps every transition of this change up to its merge: `git log --notes=mesh-plan`.
mesh-tools merged commit f61265f7a0 into main 2026-10-30 00:10:08 +00:00
mesh-tools deleted branch fix/774-new-words-first 2026-10-30 00:10:08 +00:00
Sign in to join this conversation.
No Reviewers
1 Participants
Notifications
Due Date
No due date set.
Dependencies

No dependencies set.

Reference: novox/mesh-catalog#559