Design 47 H1, proof 1 (second run): one line in feh #725

Merged
mesh-tools merged 1 commits from proof/47-H1-feh-2 into main 2026-11-21 10:08:05 +00:00
1 Commits
Author SHA1 Message Date
jschoubben e1974b770e Design 47 H1, proof 1 (second run): one line in feh
Design lines: H §5 step 7. The first run's pipeline failed on the validate ask before the assigner fix.
2026-11-21 11:07:41 +01:00