Carry the findings bridge to the indexer (#12's merged message was lost) #13

Open
mesh-tools wants to merge 1 commits from fix/47-G-bridge-findings-2 into main
Member

This only changes a comment in the empty findings package that #12 added. #12 was merged by hand in the forge at 15:48 CET while G's forge bridge was crash-looping on novox, so its merged message never reached the indexer (indexer_read_heard: nothing since 14:49 CET), and the forge module now counts it as reported. Merging this through the gate carries mesh-contracts' main, findings included, to the indexer. Design 47 G, issue 1966.

Reviewed-by: lead-47@shanks (one comment)

https://claude.ai/code/session_01NcbgfGKaxw984XyAPfLm4h

This only changes a comment in the empty findings package that #12 added. #12 was merged by hand in the forge at 15:48 CET while G's forge bridge was crash-looping on novox, so its merged message never reached the indexer (indexer_read_heard: nothing since 14:49 CET), and the forge module now counts it as reported. Merging this through the gate carries mesh-contracts' main, findings included, to the indexer. Design 47 G, issue 1966. Reviewed-by: lead-47@shanks (one comment) https://claude.ai/code/session_01NcbgfGKaxw984XyAPfLm4h
mesh-tools added 1 commit 2026-11-13 15:43:20 +00:00
Author
Member

Delivery novox/mesh-contracts@006a6d7eb7b9 — ready since 2026-11-13T15:44:28Z

Transitions

  • 2026-11-13 15:44 (new) → proposed (announced): novox/mesh-contracts#13's head announced
  • 2026-11-13 15:44 proposed → ready (accepted): a verdict names this commit and the trunk's head as its trunk commit, the gate passed or warned, and the repository's own check did not fail; or the check gates no merge (check-gates-merge false)

The commit's note under refs/notes/mesh-plan keeps every transition of this change up to its merge: git log --notes=mesh-plan.

<!-- mesh-delivery:view --> **Delivery** `novox/mesh-contracts@006a6d7eb7b9` — **ready** since 2026-11-13T15:44:28Z **Transitions** - 2026-11-13 15:44 (new) → proposed (announced): novox/mesh-contracts#13's head announced - 2026-11-13 15:44 proposed → ready (accepted): a verdict names this commit and the trunk's head as its trunk commit, the gate passed or warned, and the repository's own check did not fail; or the check gates no merge (check-gates-merge false) The commit's note under `refs/notes/mesh-plan` keeps every transition of this change up to its merge: `git log --notes=mesh-plan`. <!-- mesh-act:switched.owed.21849.novox/mesh-contracts.13.006a6d7eb7b96b50062ffc419e29a516897c626c.view -->
All checks were successful
mesh/delivery ready: it is merged on the Approve
You are not authorized to merge this pull request.
This pull request can be merged automatically.
This branch is out-of-date with the base branch
View command line instructions

Checkout

From your project repository, check out a new branch and test the changes.
git fetch -u origin fix/47-G-bridge-findings-2:fix/47-G-bridge-findings-2
git checkout fix/47-G-bridge-findings-2
Sign in to join this conversation.
No Reviewers
No labels
1 Participants
Notifications
Due Date
No due date set.
Dependencies

No dependencies set.

Reference: novox/mesh-contracts#13