The vault's seat gains licence-put, so the licence manager keeps its grants in the vault (issue 1409) #6

Merged
mesh-tools merged 1 commits from feat/39-licence-switch into main 2026-11-12 00:13:01 +00:00
Member

Issue 1409; design 39 bus-and-switch §15, B1, B23, B24 (hq main). One member of the delivery group feat/39-licence-switch with mesh-catalog (merge together: without this verb the judge refuses the vault and the licence manager).

  • identity-and-access/seats/mesh-vault/seat.json gains licence-put; Go and TypeScript regenerated by seatgen (-check clean).

Reviewed-by: mesh-code-reviewer@shanks at 3eba6b8299
Pushed-by: fix-1965@shanks

https://claude.ai/code/session_01NcbgfHb9d4T9nq5Q6WqdiJ

Issue 1409; design 39 bus-and-switch §15, B1, B23, B24 (hq main). One member of the delivery group feat/39-licence-switch with mesh-catalog (merge together: without this verb the judge refuses the vault and the licence manager). - `identity-and-access/seats/mesh-vault/seat.json` gains `licence-put`; Go and TypeScript regenerated by seatgen (`-check` clean). Reviewed-by: mesh-code-reviewer@shanks at 3eba6b8299e040f524518a3d383e14ba5e499c0f Pushed-by: fix-1965@shanks https://claude.ai/code/session_01NcbgfHb9d4T9nq5Q6WqdiJ
mesh-tools added 1 commit 2026-11-12 00:11:55 +00:00
V-1/B1: the vault's seat definition gains licence-put
mesh/delivery merged: source.main moved to novox/mesh-contracts@29ec1c3df312
mesh/delivery-group group feat/39-licence-switch merged: every member is merged
mesh/check checking 3eba6b8299e0 on 29ec1c3df312 | novox/mesh-contracts#6 in group feat/39-licence-switch
3eba6b8299
The licence manager hands the vault a licence's grant and access token through a verb of
the seat mesh-vault; the manifest validator refuses a seat verb the definition does not
serve, so the definition carries it, and the generated Go and TypeScript follow.

Builds: design 39 bus-and-switch §15, B1, B4, B5

Claude-Session: https://claude.ai/code/session_01NcbgfHb9d4T9nq5Q6WqdiJ
Author
Member

Delivery novox/mesh-contracts@3eba6b8299e0 — merged since 2026-11-12T00:13:04Z

Source — source.main moved to novox/mesh-contracts@29ec1c3df3. Whether it reached the machines is mesh-delivery-view's, derived from source.main, the wants and the haves.

Group feat/39-licence-switch: novox/mesh-catalog@dbcba161d5, novox/mesh-contracts@3eba6b8299

Transitions

  • 2026-11-12 00:11 (new) → proposed (announced): novox/mesh-contracts#6's head announced
  • 2026-11-12 00:11 proposed → ready (accepted): a verdict names this commit and the trunk's head as its trunk commit, the gate passed or warned, and the repository's own check did not fail; or the check gates no merge (check-gates-merge false)
  • 2026-11-12 00:13 ready → merged (merged): on the trunk its modules follow: merged there

The commit's note under refs/notes/mesh-plan keeps every transition of this change up to its merge: git log --notes=mesh-plan.

<!-- mesh-delivery:view --> **Delivery** `novox/mesh-contracts@3eba6b8299e0` — **merged** since 2026-11-12T00:13:04Z **Source** — source.main moved to novox/mesh-contracts@29ec1c3df312. Whether it reached the machines is `mesh-delivery-view`'s, derived from `source.main`, the wants and the haves. **Group** `feat/39-licence-switch`: novox/mesh-catalog@dbcba161d57c, novox/mesh-contracts@3eba6b8299e0 **Transitions** - 2026-11-12 00:11 (new) → proposed (announced): novox/mesh-contracts#6's head announced - 2026-11-12 00:11 proposed → ready (accepted): a verdict names this commit and the trunk's head as its trunk commit, the gate passed or warned, and the repository's own check did not fail; or the check gates no merge (check-gates-merge false) - 2026-11-12 00:13 ready → merged (merged): on the trunk its modules follow: merged there The commit's note under `refs/notes/mesh-plan` keeps every transition of this change up to its merge: `git log --notes=mesh-plan`.
Author
Member

mesh-delivery: the operator's Approve of this pull request's merge into main is ended: a head it covers moved on: the heads it covers are no longer the group's heads. Nothing is merged on it. The operator is asked again once the checks pass at the new head.

mesh-delivery: the operator's Approve of this pull request's merge into main is ended: a head it covers moved on: the heads it covers are no longer the group's heads. Nothing is merged on it. The operator is asked again once the checks pass at the new head.
mesh-tools merged commit 29ec1c3df3 into main 2026-11-12 00:13:01 +00:00
mesh-tools deleted branch feat/39-licence-switch 2026-11-12 00:13:02 +00:00
Sign in to join this conversation.
No Reviewers
No labels
1 Participants
Notifications
Due Date
No due date set.
Dependencies

No dependencies set.

Reference: novox/mesh-contracts#6