Take out the controller binary a local build left in the change (issue 233)
mesh/merge-gate pass: builds mesh-controller → novox; no bus step; every machine composes with the change as it did without (4 of 4 compose)
mesh/repo-check pass: its merge-check.sh passed
mesh/delivery-group group fix/233-a-failed-probe-fails-only-what-needs-the-tool ready: every member ready, and composed together they pass
mesh/delivery stopped: the pull request closed unmerged

This commit is contained in:
jochen
2026-10-12 14:32:48 +02:00
parent e94a30fc50
commit 2043b0273e
Binary file not shown.