A new controller's grants reached the bus only after its gate, so the
buckets it newly writes were refused until then. At start it now sends
the bus's machine the user list alone, every build there kept.
ADR 0483: the controller keeps a key per plan in its build phase; holders read it and
take no new check while one is there, but for the oldest check past 30 minutes, one
at a time by a let-through key. The queue says why checks wait.
A literal * in a published subject matches the grant's *, so in one shared bucket a node could read every node's files. Each node now
has declaration-files-<node>, which its account reads by name and the controller writes; the sweep judges each bucket against that
node's latest declaration, under the node's lock with the send, and an object the sweep marked is put again by the next send. Putting
that fails send after send raises a condition.
A node that reports file-references gets the digest and size of each file over 64 KiB that may travel so, and the content is put in
the bucket declaration-files before the declaration is sent; others get every content inline. The controller alone writes the
bucket and node-engines read an object by name (the four grants the node-engine's own fetch makes, no list, no write). An object
goes a day after no node's latest declaration names it. The near-limit condition warns at 75 percent, and a test holds the control
node's declaration, in the reference form, under half the bus's largest message.
Every caller composes through mesh-sdk's go/compose since issues 1386 to 1388; the controller's second copy of the composition is dead code. The parent of this commit is fb556d6b, whose try (build-1792493691274712799, 17m28s, 2026-10-20 11:12 UTC) ran the equality test green on the live facts: every machine was sent and compared both ways (ADR 0453, issue 1384).
Deleted, 40 functions: in plan.go planFor, declarationWith, renderingFor, grantsFor, theRestOfTheMesh and their helpers (boundOfGrant, busCredentialIssued, carriedBuilds, carriedOn, composeBusUsers, engineJudgesRoot, engineReadsHealth, engineTakesHanded, takesHanded, givenUnderAnOldKey, issuedToHolder, keyFor, licencesFor, managerPublicKeyFor, movedProvider, providerMoved, providerModuleOf, sayLeftOut, seatsOn, wireBuilds, zonesInTheMesh); in network.go generators, whoResolves, namesInTheMesh, onThePrivateNetwork; composedAndValidated, adoptionFor, adoptionOf, engineOpensVaultBox, namedModules, localNetworksOf, keepRecorded, passSeatsOn, theMeshPassesSeatsOn, assignmentsOf. Choosing (Reading, Allocating, Foreseeing) is gone: coreBoxesFor and coreBoxesOf take a plain allocating flag. composeForPush no longer takes the private network it ignored. The seat pass of a send is performSeatPasses, over the passes the composition names.
Measured: cmd/mesh-controller non-test code 67,643 -> 65,821 lines (-1,822), its tests 57,691 -> 57,286, with the integration part of the equality test removed here because it calls the deleted functions. Not the issue's 3,000: that counts all of plan.go (2,192 lines), of which the callers, the verbs, the perform step and the sends remain (sendable, recorded builds, the held-back and ready-node logic, the plan verb, the gate's trial); and the 37 functions a name walk lists as unreachable are called through interfaces and method sets and are kept.
Tests dropped, each with the mesh-sdk go/compose test that holds its cases:
- seat_pass_test.go TestACompositionWithTwoClaimantsRecordsNoneAndSaysSo, TestACompositionChangesNothingWhileTheHolderIsAssignedOrNobodyClaims, TestAHolderAssignedButNotOnTheShelfIsNotTakenForGone: rest_test.go TestNoSeatIsPassedForTwoClaimantsAnAssignedHolderOrNoClaimant, TestAHolderAssignedButNotOnTheShelfIsNotTakenForGone, TestASeatWhoseHolderIsAssignedNowhereGoesToItsOnlyClaimant. TestACompositionPassesTheSeatAndWritesOneHandActByTheController and TestALostPassWritesNoActAndAFailedOneLeavesTheRecord stay as tests of the send's step (performSeatPasses); TestAThrowawayMeshPassesTheSeatInMemoryAndWritesNothing stays as TestAThrowawayMeshWritesNoHandActForAPass.
- seat_pass_test.go TestNoSeatIsPassedWhenAMachinesAssignmentsCouldNotBeRead: no counterpart, and none is needed: the adapter reads every machine's assignments for the Input and a machine whose read fails fails the Input, so no seat is passed on a partial read.
- network_test.go TestOnlyAMachineOnThePrivateNetworkIsNamed: network_test.go TestANodeNotOnThePrivateNetworkGetsNoAddressAndNoNetwork.
- held_back_test.go TestASendCarriesTheCurrentBuildsAndALeftOutModuleKeepsItsOwn: node_test.go TestAModuleLeftOutKeepsTheBuildItWasLastSent (and compose_sdk_test.go's table, now literal).
- modules_wire_test.go TestTheBuildOfACarriedCommitIsTheAssignmentsOrTheOneBuiltFromIt: node_test.go TestTheBodyCarriesTheOrderTheInputGivesAndTheBuildsOnlyToAnEngineThatReadsThem.
- compose_equal_integration_test.go: the old path it compares against is deleted; its last run is the parent's try.
Rewritten against mesh-sdk, same cases: issued_test.go (needs now come from compose.Resolve: Needed.IssuedToHolder and ProviderMoved), module_health_test.go and merge_gate_handing tests (the contract in the Input), provisioner_account_integration_test.go (the composition's refusal), one_resolution_integration_test.go (sayFound). Every test of the send, perform, the adapter and the verbs is kept; the tests that used planFor, declarationWith, generators, renderingFor or grantsFor as setup use resolveNode, composeSend, composeQuestion, renderingOf and grantsOf. compose_callers_test.go now fails when any deleted name is declared or called again.
Committed by copying the files of a staging branch (stage/r4b-1389 at 198be8217c, built from fb556d6b by patch commits and compared with the author's worktree), so that this commit's parent is fb556d6b.
Every send composes through composeSend (compose over the Input, perform what it named foreseen, read the stores again, compose again, refuse a declaration that still stands in for a value): push.go's two composing sites, composeForPush, declarationFor (the plan verb, which allocates on purpose for one named machine) and the merge gate's two passes and its trial assignment (composeSendValidated, which answers the node-engine's validator beside it). Each machine of a send reads the mesh afresh (freshInput), because the send before it made and recorded things. None calls declarationWith with Allocating any more. The private network is still computed up front, so a send refuses on it before anything is composed. Also here, as they share the helpers: whoResolvesOn, restOfTheMesh and restOfTheMeshOf in compose_sdk.go, and the planFor callers in held_back.go, plan.go and push.go.
Once chain_moved records the kind, RecordBuild and every build read go through the chain (reuse key and published added); before that the tables are read as before. The serving controller copies the rows at its start, holding the lease: idempotent per key, rows counted against keys, the largest value measured, a refusal (urgent condition, nothing switched) on a count that differs or a value over the bus's largest, and a re-read when the table took a row meanwhile. ForTest attaches the chain in memory with builds moved; ForTestBefore leaves it unmoved. Build requests, gates and the other kinds are still in their tables.
A push composed during a failed judgement issued the router a membership without the verified sender and nothing composed it again, so every approval was refused. The self-check now issues it again within one run; a composition says which kind lost it and why.
mesh/merge-gate head 9e11790bd74a merged into trunk 3ed08c3464e3 — pass: builds mesh-controller → novox; no bus step; every machine composes with the chang…
A page polling plans every few seconds wrote about 14,000 journal lines a day. A line is judged a
read by the generic command verb's reading forms (ADR 0266), on its every word, so plans go,
conditions silence and settings set are still said; a refused or failed read is said too.
mesh/merge-gate head e4acab32d6a2 merged into trunk 60cc9ec363df — pass: builds mesh-controller → novox; no bus step; every machine composes with the chang…
mesh/delivery covered after its failure: a later walk that contains it was delivered: plan-1792009731456564734 (novox/mesh-controller at 60cc9ec3 into ma…
A check judges one head; once the pull request has another, its verdict
answers nobody and its run holds a build machine the new head waits
behind. Asking a check of R#N at H now drops every waiting check of R#N
at another head and kills every one in flight, saying each in the log.
Announcements are unordered and a recheck asks a recorded head, so this
happens only when the forge confirms H is the pull request's current
head; otherwise nothing ends and that is said. A one-shot recheck ends
them within the call. Tries, walk builds, group checks, other pull
requests' checks and rechecks of the same head are left alone.
novox/hq issue 726
mesh-mail's events must live on a stream of their own and reach only the modules the operator granted
an account (ADR 0359 §2, §4). The controller now creates a module's declared stream, publishes its events
on mesh.stream.<module>.event.<event>, and composes a consumer's durable consumer, filters and bus grants
on a restricted stream only where its consumes asks and the provider's trusted value names it; a consumer
that loses its grant has its consumer removed on the next assertion. Nothing changes while no manifest
declares a stream.
mesh/delivery-group group feat/350-one-build-per-change checking: composed check out of date: novox/mesh-controller@cd49b50c4075 was judged against trunk bff5b…
A merge built every moved module a second time although its check had judged
the same tree (issue 649). The check now builds into the scratch namespace
under a reuse key (source fingerprint plus the builder's own digest), and the
walk of the trunk commit copies a build of the same key by digest instead of
building, saying per module why when it cannot (novox/hq ADR 0350).
mesh/merge-gate head 6d2e4c299a34 merged into trunk 584aa2d7d7a5 — pass: builds mesh-controller → novox; no bus step; every machine composes with the chang…
The seat ran `push <node> --wait 0`, so a push's call ended at "sent" and nobody learned whether the machine applied it. The caller is answered before a push starts (answersFirst, issue 265), so waiting holds nobody: the call now waits up to two minutes for the machine's own report and keeps it, applied, refused with the machine's reason, or each failed resource with its error.
Refusing the whole send wedged a machine whose gate put back the
controller and whose put-back send was refused: every later automatic
send there was refused, retried each tick, and held up every other walk.
A send now composes the controller and the node-engine at the build the
machine was last sent when the mesh's record is older, and carries the
rest; nothing is refused or retried, and a plan whose own build is the
older one ends with its gate superseded. A sent build that failed its
gate is never kept, so the next send completes a put-back. The condition
names the two ways out and clears on any send that carries the record,
a person's push included.
After mesh-catalog #166 merges and before the bus upgrade, the bus's
machine cannot be pushed, so any change to the composed list made the
list check read behind for good: every ask was withheld and the condition
named a push that is refused. An older module's allowed now counts as
held, the unconfirmed reload said once; the worst case is one ask refused
in the seconds before a reload, which is asked again (issue 369).
The list check stays for a module that says not allowed or cannot answer,
and its remedy is the plan's own reason when the list cannot be composed,
the bus upgrade while sends there wait on it, and a push otherwise. An
in_force false is a wait only when the module gives both times; otherwise
what is not known is named.
change held asking back, a list sent was taken for a list the bus enforces, a plan that could not be
worked out read as not behind, and no test held the real judgement. Now the asker asks only when the
composition grants the controller itself to publish its ask, and the bus's own module says that grant
is in force on the running server (nats_user_can's in_force, mesh-catalog); each fact not known is not
held, said with why. brokerBehind takes a list nobody could compose as behind.
mesh/merge-gate pass: builds build-agent, mesh-controller → ace, g14, novox, shanks; no bus step; every machine composes with the change as it did without …
cancel, clear and rebuild kept a walk's end or restart without saying it, as plans stop, retry and
release-backlog did before them. The controller's run now says every save a verb makes on the bus, so the
next verb cannot lose a mark the same way. A stop is cleared when a walk is resumed, so one that fails again
ends failed and the search for its merge runs (review 21, ADR 0308, issue 532).
The router holds what an open walk touches and tells its result once; it can do so
only if plan-moved names the walk's start and end, the modules and machines it moves,
what a moved tool runner or node-engine carries there, and how long to hold.
mesh/merge-gate pass: builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step; every machine composes with the change as it…
mesh/merge-gate pass: builds build-agent, mesh-controller → ace, g14, novox, shanks; no bus step; every machine composes with the change as it did without …
mesh/merge-gate pass: builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step; every machine composes with the change as it…
The issue tracker's history lasts seven days on the events stream and its
bucket fills toward a cap with no warning (issues 501, 502). A module may
now declare `logs`; the controller creates each as a stream on the bus
(create-or-update, never deleted or recreated, reported when undeclared),
issues it to the owner's assignments in their membership, grants the
runtime exactly the append and direct-read subjects, and raises a
condition when any module's bucket or log reaches 75% of its cap, cleared
below 70%.
mesh/merge-gate pass: builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step; every machine composes with the change as it…
mesh/merge-gate pass: builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step; every machine composes with the change as it…
A refusal of a send the mesh never recorded went only to stderr; it is now kept
with its sender said to be unknown, and raised. A counter behind the machine (a
store put back) is raised and the condition names push, since the receive loop
must not push. The node's digest and generation are one transaction, and a send
record that fails is said loudly without failing the send. The trigger ignores
an update that changes nothing, and the put-back mark is dropped: a put-back is
composed afresh with the current generation.
mesh/merge-gate pass: builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step; every machine composes with the change as it…
A declaration newer in sequence than every other named four fewer modules
than the assignments held, a machine applied it, and nothing the mesh kept
said who sent it or from what view. The store now raises an assignment
generation in the same transaction as every assignment change (a trigger,
so a cascade counts too); a send reads it before composing, carries it to
engines that said they read it, marks a gate's put-back, and is recorded
with its sequence, sender, generation and modules. The would-send is
stamped with what was last sent, so nothing reads behind for it; a refusal
is kept on the send it refused and raised as S20 naming the sender; plan
says what the machine was last told.
mesh/merge-gate pass: builds build-agent, mesh-controller → ace, g14, novox, shanks; no bus step; every machine composes with the change as it did without …
Every merge opened a walk and the next merge of the branch superseded it: two
catalogue merges 18 s apart left a walk no delivery held, and the operator
started it by hand 58 minutes later. A merge now joins the open batch, kept in
the store (migration 0089), which is cut into one walk when no merge came for
merge-window (90 s) or at merge-window-at-most (10 min): one commit per
repository, the latest of its branch, with every file the batch's merges
changed. One walk at a time; a started walk is never superseded, a waiting one
is folded into the next. The walk names every merge it answers on the wire
(delivery.merges, taken_over_by, batch). A failed walk walks its earlier merges
alone, newest first, until one is delivered. A delivery group's order becomes
tier edges inside the walk. plans shows the batch assembling; S18 and S19
bound its waits; S16 names the merges a waiting walk answers.
mesh/merge-gate pass: builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step; every machine composes with the change as it…
On 2026-10-09 a release's gate on the control node read the machine's
report against a newer send another plan had just made there, failed
three builds the machine had reported healthy, and put them back on
every machine to a controller older than the store's schema; that
controller then passed the newer plan's gate from its own health.
- A gate keeps what its send carried (digest, sequence) and reads the
report against it; a report on the last send is on it too.
- A gate judges only the build the machine was last sent: another build
there supersedes the judging — no verdict, nothing put back.
- A controller is told its build (MESH_CONTROLLER_VERSION, ${version}
in a process's env) and records how far it reads the store's schema;
a put-back to a build that reaches less, or never said, is refused
and the current build kept, said as urgent.
- A release's open gate holds other sends of its modules there, and a
plan's own first send waits on it.
The agent-root probe read the sudo module's answer, given in the machine's runtime as the very account
an agent could become, and took a missing account, a missing answer or no accounts as a pass. One
judgement now decides: the machine names an agent account its node-engine judged unable to become
root within 15 minutes (agentConfined, mesh-controller #164), and the login shell's execute is not
served there; anything not read is not free. The probe raises agent-root on it, the new root-free
verb answers it live for the router, and a push composes verified-sender for a kind only while its
machine and the router's pass it.
mesh/merge-gate pass: builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step; every machine composes with the change as it…
mesh/delivery covered: a later merge that contains it was delivered: novox/mesh-controller@14ab2ddd9b49 (merged as 63e85b25 into main, walk plan-17915459…
- The generic command verb only reads now (commandReads) and terminal-only
commands are refused through any verb (terminalOnly). mesh-cli's
ordinary line made neither check: `node account`, `token issue` and
`secret export` from another node would have run. It now meets both, in
the one function the command verb shares.
- The serving controller marks itself and its children never the terminal
(ADR 0266); a line mesh-cli runs as the terminal drops that mark and
carries MESH_CLI_TERMINAL, so it reads as the terminal it is.
- Two withholding tests searched the answer's text while JSON writes bytes
as base64, so they held nothing. They search both now, each proved by
disabling what it guards (Shown, the bus withholding, `calls` via Get).
- The control-node refusal is tested through the assign and unassign acts.
mesh/merge-gate pass: builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step; every machine composes with the change as it…
mesh/delivery covered: a later merge that contains it was delivered: novox/mesh-controller@eca6390d6fe4 (merged as 33dc85d8 into main, walk plan-17915444…
A source repository's name is not its identity, and a trunk anyone may push
to makes the trunk rule mean nothing (the review of 2026-10-09). Through any
verb a module now registers only from a repository on the mesh's forge whose
trunk refuses direct pushes, requires a status and lets no administrator
merge past one, asked of the forge's own tools; and only from the repository
by the forge's id, recorded at registration (migration 0084), so one deleted
and made again under the name is refused. The serving controller marks its
environment, so nothing it runs or starts reads as the terminal, and a
terminal request covers only the repository and path it asked.
mesh/merge-gate pass: builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step; every machine composes with the change as it…
The records send the operator to "the controller's terminal", and nothing
reached it (hq issue 343). The serving controller now answers each node's
mesh.control.<node>.cli, where only that node's engine may publish, with the
account the engine read from the kernel. A line from the control-node's
operator account runs as the terminal: a fresh process of this binary with
no MESH_VERB, whatever the serving process carries. The same account on any
other node, where agents may run as it, is an ordinary call: the generic
command verb's refusals (one function now, so the two routes cannot drift)
and MESH_VERB=mesh-cli, so a terminal-only change is refused with its
reason. Any other account, root included, runs nothing. Servers are never
run, and an answer over one bus message is cut and says so.
The terminal-only refusals and the usage now name mesh-cli on the
control-node as the way to the terminal.
mesh/merge-gate pass: builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step; every machine composes with the change as it…
Each verb ran as a process that dialled the bus, so hundreds of short
connections an hour, all named mesh-controller, hid any client reconnecting
in a loop (hq issue 327). D15 now says a user whose connections keep dropping.
Review of #150: a withdrawal could land between the look and the act, a
failed ask read as a build in flight, a request kept the wrong asker, a
build being registered read as not built, build "true" could ask a build
nothing waited on, and a status read changed state. Claim a row under the
machine's hold before making it, keep a request only once asked, settle on
the controller's own tick, raise an assignment not made as a condition
until it is answered, and tie each row to its machine.
mesh/merge-gate pass: builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step; every machine composes with the change as it…
Two incidents had one shape: a change took effect that nobody saw first (hq issues 241, 304).
Three guards, each silent when nothing is at stake:
- settings show [--history], and a set that answers each key it adds, changes and removes, and
refuses a removal unless --replace; the replaced or cleared layer is kept in settings_history,
in the same transaction as the write (migration 0078).
- every send keeps a summary of what it sent (no file content), plan <node> --diff compares with
it, and push with no machine is refused unless --all.
- a push that would give a running container's mount another host directory holds that machine,
naming the module, mount and both directories, until push <node> --move <module>; a named push's
cascade is held the same way.
Rebased onto main and fitted to it: the hold runs before the push says what it recreates, a whole
push still says so first and leaves machines waiting for a gate, the verb's push with no machine is
still --behind and a push still needs why. The verbs take plan diff, settings replace and history,
and push move beside a machine, each refused where it cannot take effect.