A sweep read what it keeps before what was ever recorded, so a take-in's
build recorded between the two reads, by a concurrent take-in off the
plans' hold, was eligible and let go of seconds after the take-in read
it; a new module's build is unkept until it is registered. Now the sweep
reads the records first and keeps what a build recorded within the hour
or an open plan names, and names every reference it lets go of; a take-in
holds every artifact in the store before recording, failing on one the
store lacks; and RecordBuild clears artifact_collected as RecordMirrored
does.
mesh/check failed: g14: novox/mesh-catalog#464: checks/health/go.mod names mesh-sdk a9560890ee26, which is neither on mesh-sdk's trunk nor the group's…
The catalogue's manifests moved their content into template files and fall back to predefined keys, so a copy of
module.json alone no longer passes the catalogue's own check; the bus's Dockerfile is gone from the catalogue.
The controller's readable states, its bucket lists and the composed golden file keep lane C's removal of the
checks-running and plans-building buckets and the build agent's check subjects, and add lane B's grants bucket.
The controller asks no build of anybody (ADR 0501 §5, ADR 0525 clause 6, ADR 0503 §3). Every module of a walk is taken from the
builder's done key; a key not done yet waits, named in the plan, and never fails it.
- C2b/C2c: internal/builder and cmd/mesh-controller's asks go (askABuild, onlyTheBuildersOwn, buildOneAsked, takeIn from an
outcome, buildAgentsOwn, the builder's say and its fallback, the daemon hearing an outcome). The server follows the retired
seats' built subjects only to let go of them, because the installer's carried user list names them.
- C2d: replay, queue, cancel, clear, kill, pause, resume, delivery-check, check-here and merge-gate are refused by name.
- C3: the check queues (CHECKS_READY, CHECKS_OTHER) and their workers, the checks-running and plans-building buckets and
their grants, the build queue and its hold (plans_building.go, queue.go, link/holds.go, builds_nats.go, checks_nats.go).
- C4: merge_gate*.go, the pull request's repo-check path, the Checked event and its layers; a pull request asks the
controller nothing but to tell mesh-config what its head declares.
- C5: the builds bucket is written only by key_takein.
- C10 (help and refusals): the terminal's help lists only what is served.
Integration tests of the plan's tiers, sends, stops and retries now run on a stand-in builder with a done key for every
module (walk_keys_scaffold_integration_test.go); the tests of the asks, the queue, the merge gate and the replays are deleted.
mesh/delivery covered after its failure: a later walk that contains it was delivered: plan-1792753090890815254 (novox/mesh-controller at c834e4f8 into ma…
mesh/check pass 149f89e8f9bf on 0173d9c70e59 | unit 1759 run, 0 kept, 4 skipped | integration 3037 run, 0 kept, 16 skipped | over bound: integration (…
A build heard and recorded and not registered kept its refusal only when a
plan was open or the plans were held. A tier's first failure fails its plan,
so later refusals were lost; a Retry then settled those builds built from
their records, sent the modules' old versions and reported the plan done.
A build without a readable manifest never reached its plan at all.
Keep the refusal in the store and the process whatever the plans' state, and
fail the asking plan by the build's id when the module is not known.
Issue 1713.
The gitea module keeps the operator's login beside mesh-tools on every main so
the operator can merge by hand; an agent's account there is still refused.
The forge requires no status to merge any more (ADR 0534 §1); a trunk is
trusted when it takes no push, its merge whitelist names mesh-tools alone and
no administrator merges past its rule, so only mesh-delivery lands a commit
there, on a passing mesh/check and the operator's Approve. The old rule failed
the 11:51 delivery plan once mesh-catalog's status was unticked.