Commit Graph
83 Commits
Author SHA1 Message Date
jschoubben 9ca2c2bfb3 issue 974: review 1: a verb's end, a provisioner client's word and a failed key read each ask or retry a look; the silent bucket ages; the acceptance test starts the rollout through the serving wiring 2026-10-17 13:45:41 +02:00
jschoubben 20c8d9454a issue 974: the step's acceptance test: a rollout advances on events with no ticker, a silent machine is named when its key expires, a replaced controller resumes 2026-10-17 13:33:49 +02:00
jschoubben 8af77c2c75 issue 974: a rollout advances on events (a look asked by each plan saved, report and expired silent key), the 30 s ticker goes, and each tier send is said as sent 2026-10-17 13:28:34 +02:00
jschoubben df39a499ef Close a batch's merge window by the expiry of a key on the bus, heard by a watcher, and drop the five-second cutter (issue 973) 2026-10-17 12:10:30 +02:00
jschoubben baf1501d81 A walk, a retry and a let-go wait only for a started walk they are related to (issue 973) 2026-10-17 00:46:27 +02:00
mesh-tools d984816844 Feature 57 (config and provisioning): release mesh-controller, the reviewed release branch merged with main, on top of main 2026-10-16 08:28:38 +00:00
jochen 0d1bb035cb Let a recorded module's move that restarts nothing roll out with its walk (issue 785)
Under a module's own record (its manifest's, or its irreplaceable data's), every
move waited for a person's push, even one that only changed a tools bundle: the
database server stayed behind on ace on 2026-10-15 although its walk said it
recreated none of its containers. ADR 0377 lets such a move roll out.

A move is judged per machine against the build that machine was last sent: it
goes when no container, mounted file, data path, data declaration, provider or
(for a module with data) long-running process changes. A person's record, the
bus and any move that cannot be judged still wait. The walk keeps per machine
which way each recorded module went and why, says it in its note and log, and
status names a machine behind with `push <node>` only for a move that waits.
2026-10-15 14:27:37 +02:00
jschoubben 9f072c110c Take no rebuild into a waiting walk, and ask what a tier left unasked (hq issue 754)
mesh/merge-gate head 9f072c110c14 merged into trunk 60cc9ec363df — pass: builds build-agent, mesh-controller → ace, g14, novox, shanks; no bus step; every …
mesh/repo-check head 9f072c110c14 merged into trunk 60cc9ec363df — pass: its merge-check.sh passed
mesh/delivery delivered
A rebuild that landed while a walk waited for mesh-delivery's word was taken as
the walk's build of that module; once let go, the walk asked a tier only when
every module of it was unasked, so it never asked the rest and stood still.

A walk now takes only the outcomes of builds it asked, and none while it waits;
a rebuild does not join a waiting walk and says it runs beside it; and a tier
asked in part is asked the rest, including a module held built that the walk
never asked for, which is somebody else's build and not sent as the walk's.
2026-10-15 00:02:28 +02:00
jschoubben 704b21b3c5 Carry the new controller's user list to the bus when its walk ends, as the gate's pass did (hq ADR 0236 §34, ADR 0360)
mesh/merge-gate head 704b21b3c547 merged into trunk 76304d9db817 — pass: builds mesh-controller → novox; no bus step; every machine composes with the chang…
mesh/repo-check head 704b21b3c547 merged into trunk 76304d9db817 — pass: its merge-check.sh passed
mesh/delivery delivered
2026-10-14 19:36:28 +02:00
jschoubben 5b455b8a24 Keep the first-machine gate behind a switch for walks begun before hq ADR 0360, and test both paths
mesh/delivery superseded: a newer head of the same pull request
mesh/merge-gate head 5b455b8a2438 merged into trunk 76304d9db817 — pass: builds mesh-controller → novox; no bus step; every machine composes with the chang…
mesh/repo-check head 5b455b8a2438 merged into trunk 76304d9db817 — fail: its merge-check.sh failed: --- FAIL: TestARenewalWrittenThoughItsAnswerWasLostIsSt…
2026-10-14 19:35:07 +02:00
jschoubben da8a5e9bc0 Send a merge's builds to every machine at once, with no first-machine gate (hq ADR 0360)
mesh/delivery superseded: a newer head of the same pull request
mesh/merge-gate head da8a5e9bc0f7 merged into trunk 76304d9db817 — pass: builds mesh-controller → novox; no bus step; every machine composes with the chang…
mesh/repo-check head da8a5e9bc0f7 merged into trunk 76304d9db817 — fail: its merge-check.sh failed: --- FAIL: TestAReusedCheckBuildIsRegisteredByItsDigestA…
The operator chose the leanest rollout: no gate, no one machine first, failures loud and fixed forward.
A walk sends every rolled-out module to every machine running it in one step, built-by orders no tier,
and a walk ends on its machines' reports. The backlog walk sends every machine at once and passes each
on its applied report.
2026-10-14 19:19:49 +02:00
jschoubben 060f2a9ca5 Build for the merge from a copy its tests never touch, and keep or take only the same head's build
mesh/merge-gate head 060f2a9ca5fd merged into trunk 04730b54a8f2 — pass: builds build-agent, mesh-controller → ace, g14, novox, shanks; no bus step; every …
mesh/repo-check head 060f2a9ca5fd merged into trunk 04730b54a8f2 — pass: its merge-check.sh passed
mesh/delivery superseded: a newer head of the same pull request
The gate and the repository's check mount the workspace read-write, so a
build from that tree could hold what the tests wrote under a key that
describes the merge. A check now clones the merge outside the workspace
before anything of the change runs, and builds from that. A check keeps,
and a walk takes, only a build an earlier check of the same pull request
at the same head made: another pull request's build, or an earlier
head's, is never registered. The walk reads the verdicts once
(novox/hq issue 703, review of #328).
2026-10-14 09:56:23 +02:00
jschoubben 1666747a22 Keep a check build whose key is unchanged instead of building it again
mesh/merge-gate head 1666747a2246 merged into trunk 04730b54a8f2 — pass: builds build-agent, mesh-controller → ace, g14, novox, shanks; no bus step; every …
mesh/repo-check head 1666747a2246 merged into trunk 04730b54a8f2 — pass: its merge-check.sh passed
mesh/delivery superseded: a newer head of the same pull request
A fresh check asked when only the trunk moved rebuilt every image, though
the reuse key said nothing it is built from changed: a controller check
took about 12 minutes instead of 5.5. The check now keeps a build kept
under its key when a verdict of the build seat names that key and every
digest, names it as the build's own check so a walk takes it, and the
cleanup keeps it while any check names it (novox/hq issue 703).
2026-10-14 09:41:39 +02:00
jochen 70885ab3c4 Share one prefix between the no-move Why's writer and its reader (review of #309, issue 648)
mesh/delivery delivered
mesh/merge-gate head 70885ab3c4a3 merged into trunk ca3f43c400ba — pass: builds mesh-controller → novox; no bus step; every machine composes with the chang…
mesh/repo-check head 70885ab3c4a3 merged into trunk ca3f43c400ba — pass: its merge-check.sh passed
2026-10-14 02:22:25 +02:00
jochen d9b86376d3 A no-move tier waits for no new report, so its walk asks the next tier (issue 648)
A build made from the source every machine running it runs is marked sent
and sent nothing, yet the tier's wait asked each machine for a report after
that marking. None follows, and the walk waited for ever. Each machine is
now judged by whether it answered its last send, the one whose builds made
the build no move.
2026-10-14 02:18:53 +02:00
jschoubben 2f5cc146fe Keep a walk's sends to what was kept, and say a silent rest (hq ADR 0353 review)
mesh/merge-gate head 2f5cc146fe46 merged into trunk 1601cb17432e — pass: builds build-agent, mesh-controller → ace, g14, novox, shanks; no bus step; every …
mesh/repo-check head 2f5cc146fe46 merged into trunk 1601cb17432e — fail: its merge-check.sh failed: --- FAIL: TestAFirstMachineThatFailsStillStopsTheWalk (…
mesh/delivery superseded: a newer head of the same pull request
A release's own gates held its other sends back for ever; an adopted send
lost what the machine ran before; a kept send could grow a build no gate
passed; a take-over matched by commit alone; a rest that went silent ended
done. The node-engine and the resolver still go one machine at a time, since
a fault that cuts a machine off shows only as silence.
2026-10-14 01:18:51 +02:00
jschoubben c2ea9b4c51 Send the rest at once after the first passes, and resume a stored gate (hq ADR 0353)
mesh/repo-check head c2ea9b4c5187 merged into trunk 1601cb17432e — fail: its merge-check.sh failed: --- FAIL: TestAReleaseSendsTheRestAtOnceAfterTheFirstPa…
mesh/delivery superseded: a newer head of the same pull request
mesh/merge-gate head c2ea9b4c5187 merged into trunk 1601cb17432e — pass: builds build-agent, mesh-controller → ace, g14, novox, shanks; no bus step; every …
A release now sends every other machine in one step once its first machine
passed, each judged by its own gate; a failing one is put back without
stopping the others, a silent one is left. A send is kept before it is made,
and a machine already sent what a gate is for is not sent again: the gate
counts from that send and takes over another walk's readings of the same
build there.
2026-10-14 01:06:49 +02:00
jschoubben 5c606fd1d4 Take only a check build its verdict names, and keep a build another check still names
mesh/merge-gate head 5c606fd1d48b merged into trunk 372faebf2824 — pass: builds build-agent, mesh-controller → ace, g14, novox, shanks; no bus step; every …
mesh/repo-check head 5c606fd1d48b merged into trunk 372faebf2824 — pass: its merge-check.sh passed (run 2)
mesh/delivery delivered
mesh/delivery-group group feat/350-one-build-per-change delivered: every member is delivered
The artifact store takes writes from anything on its network, so a record
planted under another merge's key could have been registered: the walk now
takes a scratch build only when the build seat's own verdict for one of its
pull requests names its key and digests. Deleting by digest also took builds
another check shared (review of #311; novox/hq ADR 0350).
2026-10-13 23:16:55 +02:00
jschoubben cd49b50c40 Build a change once: the check builds what its merge moves, the walk takes it by key
mesh/merge-gate out of date: judged against trunk bff5b7f0e4f8, the trunk is now 372faebf2824; judged again on a recheck or when it is merged
mesh/repo-check out of date: judged against trunk bff5b7f0e4f8, the trunk is now 372faebf2824; judged again on a recheck or when it is merged
mesh/delivery-group group feat/350-one-build-per-change checking: composed check out of date: novox/mesh-controller@cd49b50c4075 was judged against trunk bff5b…
mesh/delivery superseded: a newer head of the same pull request
A merge built every moved module a second time although its check had judged
the same tree (issue 649). The check now builds into the scratch namespace
under a reuse key (source fingerprint plus the builder's own digest), and the
walk of the trunk commit copies a build of the same key by digest instead of
building, saying per module why when it cannot (novox/hq ADR 0350).
2026-10-13 23:04:40 +02:00
jochen d20b52cb19 Let plans wait for a plan to move and answer it as data (issue 229)
mesh/merge-gate pass: builds build-agent, mesh-controller → ace, g14, novox, shanks; no bus step; every machine composes with the change as it did without …
mesh/repo-check pass: its merge-check.sh passed
mesh/delivery superseded: a newer head of the same pull request
An agent following a rollout had plans answer once, in prose, and polled the
console with a curl loop of its own to be told a plan moved. plans now takes
wait (a plan's id), until (moved, tier or done) and bound, and answers when the
plan moves or the bound passes, saying which, with the plan as data and its
line as the output.

A call's one answer has to reach the console inside its thirty seconds, so
link.AnswersWithin lets a handler that waits on purpose hold its answer up to
LongestAnswer (25s) instead of AnswerWithin; the bound is at most 20s, and a
caller following a plan further asks again.
2026-10-12 16:18:54 +02:00
jochen cd6610cdf7 Say a walk's start or end when a person stops, closes, retries or releases it, and a hand stop as stopped
plans stop|close, plans retry and upgrade release-backlog kept a walk's start or end mark without saying it,
so the router would hold what the walk touched until its bound; each now runs on the bus as plans go does.
A hand stop keeps who stopped it, so its outcome is stopped, not failed (review 15, ADR 0308, issue 532).
2026-10-12 12:54:20 +02:00
jochen facc551ff2 Say what a walk touches, its bound and its outcome when it starts and ends (ADR 0308, issue 532)
The router holds what an open walk touches and tells its result once; it can do so
only if plan-moved names the walk's start and end, the modules and machines it moves,
what a moved tool runner or node-engine carries there, and how long to hold.
2026-10-12 12:54:20 +02:00
jschoubben ed037784e2 Name the hold a waiting walk waits on in plans (issue 529)
mesh/merge-gate pass: builds mesh-controller → novox; no bus step; every machine composes with the change as it did without (4 of 4 compose)
mesh/repo-check pass: its merge-check.sh passed
mesh/delivery superseded: a newer head of the same pull request
mesh/delivery-group group fix/529-a-waiting-walk-is-answered-or-named checking: 0 of 2 member(s) ready
A walk whose delivery was held for a person said only that it waits for
mesh-delivery's word and that plans go starts it by hand, pointing the
reader at a hand start instead of the person's decision. Ask mesh-delivery
what holds each waiting walk and say the held delivery, its reason and
mesh-delivery.release, or the delivery not at its turn.
2026-10-12 11:27:05 +02:00
jschoubben e1367d185a Send the bus's user list alone before a walk's gate, so a new grant is on the bus when the first machine is judged (issue 490)
mesh/merge-gate pass: builds build-agent, mesh-controller → ace, g14, novox, shanks; no bus step; every machine composes with the change as it did without …
mesh/repo-check pass: its merge-check.sh passed
mesh/delivery superseded: a newer head of the same pull request
A walk left the machine holding the bus out of a gated send whenever a
build waited there for that same gate, so a module's new health tool was
refused by the bus on its first machine and the gate could not pass. The
grants step sends that machine its declaration with every build kept,
before the first machine's send; plans and the change plan say it.
2026-10-11 19:01:41 +02:00
jschoubben 7758301444 Ask every failed build of the tier on a retry, not only the first (issue 457)
mesh/delivery superseded: a newer head of the same pull request
mesh/merge-gate pass: builds build-agent, mesh-controller → ace, g14, novox, shanks; no bus step; every machine composes with the change as it did without …
mesh/repo-check pass: its merge-check.sh passed
An outcome arriving after its plan failed is kept only in the build records,
so a retry read from the plan alone asked one failed build and the records
then failed the plan again on the next. Settle the tier from the records first.
2026-10-11 10:51:41 +02:00
jochen 6805e2bcb3 Walk phases: a report past the silent bound never moves a walk's end; keep phases outside the hold on the plans; first-node gate in words (review of #206)
mesh/delivery superseded: a newer head of the same pull request
mesh/merge-gate pass: builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step; every machine composes with the change as it…
mesh/repo-check fail: its merge-check.sh failed: --- FAIL: TestTheInstallersFirstUserListIsWhatTheControllerWouldCompose (0.71s)
2026-10-10 20:20:07 +02:00
jochen c640341c50 Keep each walk's phases and say a delivery over its budget (hq ADR 0282 slice 1, issue 382)
mesh/delivery superseded: a newer head of the same pull request
mesh/merge-gate pass: builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step; every machine composes with the change as it…
mesh/repo-check fail: its merge-check.sh failed: --- FAIL: TestTheInstallersFirstUserListIsWhatTheControllerWouldCompose (0.62s)
The operator's budget (a leaf module running everywhere within five minutes
of its merge, a core module within ten) cannot be held to without knowing
where a walk's time goes. A walk now keeps when its batch's window closed,
when it was cut and its class (migration 0093), each gate reading, and what
each machine of the rest was sent; 'delivery walks' and plan-moved say its
phases from the merge to every machine of the rest reporting the build
applied, and ended walks keep them as walk-phase durations per class. Probe
D16 reads mesh-delivery's 'times' and raises delivery.<class>.over-budget.
A phase that cannot be measured is said unknown, never zero. Measurement
only: no walk is held, sent or judged differently.
2026-10-10 20:15:01 +02:00
jochen 16362e1bbd A deferred walk is one whose note says so: a failed first ask is watched as before (review of #200)
mesh/merge-gate pass: builds build-agent, mesh-controller → ace, g14, novox, shanks; no bus step; every machine composes with the change as it did without …
mesh/repo-check pass: its merge-check.sh passed
mesh/delivery delivered
2026-10-10 14:51:27 +02:00
jochen 3496b58f66 A walk let go behind another reads as a wait: its note on the line, never late, and no tier of it watched (hq ADR 0276 review of #200)
mesh/delivery superseded: a newer head of the same pull request
mesh/merge-gate pass: builds build-agent, mesh-controller → ace, g14, novox, shanks; no bus step; every machine composes with the change as it did without …
mesh/repo-check pass: its merge-check.sh passed
2026-10-10 14:47:11 +02:00
jochen 04fcce2fcc An own-path batch is cut first and folds no waiting walk; a walk let go beside a started one starts once it ended; a late catalogue merge is not answered by a walk that waited for nobody (hq ADR 0276 review, tracker issue 377)
mesh/merge-gate pass: builds build-agent, mesh-controller → ace, g14, novox, shanks; no bus step; every machine composes with the change as it did without …
mesh/repo-check pass: its merge-check.sh passed
mesh/delivery superseded: a newer head of the same pull request
2026-10-10 14:33:10 +02:00
jochen 0e0e143055 Keep a merge a cut made history, and build a batch's walk at the branch (hq ADR 0276 review)
mesh/delivery superseded: a newer head of the same pull request
mesh/merge-gate pass: builds build-agent, mesh-controller → ace, g14, novox, shanks; no bus step; every machine composes with the change as it did without …
mesh/repo-check pass: its merge-check.sh passed
2026-10-10 13:48:31 +02:00
jochen e1499d4196 A late merge is named however its modules read since the cut; a walk builds the commits it carries (hq ADR 0276 review) 2026-10-10 13:39:21 +02:00
jochen 96fc4209d3 Assemble merges in a rolling window and walk each batch once (hq ADR 0276, issue 362)
mesh/merge-gate pass: builds build-agent, mesh-controller → ace, g14, novox, shanks; no bus step; every machine composes with the change as it did without …
mesh/repo-check pass: its merge-check.sh passed
mesh/delivery superseded: a newer head of the same pull request
Every merge opened a walk and the next merge of the branch superseded it: two
catalogue merges 18 s apart left a walk no delivery held, and the operator
started it by hand 58 minutes later. A merge now joins the open batch, kept in
the store (migration 0089), which is cut into one walk when no merge came for
merge-window (90 s) or at merge-window-at-most (10 min): one commit per
repository, the latest of its branch, with every file the batch's merges
changed. One walk at a time; a started walk is never superseded, a waiting one
is folded into the next. The walk names every merge it answers on the wire
(delivery.merges, taken_over_by, batch). A failed walk walks its earlier merges
alone, newest first, until one is delivered. A delivery group's order becomes
tier edges inside the walk. plans shows the batch assembling; S18 and S19
bound its waits; S16 names the merges a waiting walk answers.
2026-10-10 13:20:04 +02:00
jochen d0161fac52 Say a deleted module's reason, read a context's reason at the merged branch, and keep the snapshot's bytes (hq ADR 0267, review)
mesh/delivery delivered
mesh/merge-gate pass: builds build-agent, mesh-controller → ace, g14, novox, shanks; no bus step; every machine composes with the change as it did without …
mesh/repo-check pass: its merge-check.sh passed
2026-10-10 12:56:22 +02:00
jochen 887de9b5f2 Say why each module is in a plan: its build source's changed files, or why it is read whole (hq ADR 0267, issue 363)
mesh/delivery superseded: a newer head of the same pull request
mesh/merge-gate pass: builds build-agent, mesh-controller → ace, g14, novox, shanks; no bus step; every machine composes with the change as it did without …
mesh/repo-check pass: its merge-check.sh passed
A what-if named the build seat's holder as packaging the controller's
source, "rebuilt without their own source moving", while it was in the
plan because an open plan had not built it yet. The what-if and the merge
log now say, per module, which changed files of its build source moved it,
or that it is read whole and why: no build source recorded, a newer build
failed, or a plan has not built it yet.
2026-10-10 12:49:44 +02:00
jochen 150f038ff8 Read a module whole while a plan has overtaken its build source, and plan every view alike (hq ADR 0267, review)
A failed build, or a plan closed before reaching a module, left the
closure its last good build said, and a fix-forward to a newly imported
package would have moved nothing. A missed merge moving only a module
that packages the repository was never caught up, and an older merge
read as history for it through a look that was not its own. The gate,
a pull request's check, the what-if and a delivery's order now read the
same view the merge handler does.
2026-10-10 03:20:36 +02:00
jochen 6c616838a5 Move a module on a merge only when its build source holds a changed file (hq ADR 0267, issue 363)
Every merge to the controller's repository planned the controller, the
build seat's holder and the route proxy in three gated tiers, whatever it
changed (issue 338). The planner now maps a merge's files onto the build
source each module's newest trunk build said: a README moves nothing, the
controller's command the controller alone, the proxy's program the proxy
alone. A module with none said, or one an open plan has yet to build, is
read whole as before. Sharing a repository draws no packages edge any more,
and one recorded before neither widens nor orders a plan.
2026-10-10 03:20:36 +02:00
jschoubben e6e1e3bc89 A gate judges its own send and the build it sent, and never puts the controller back behind its store (hq issue 352)
mesh/merge-gate pass: builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step; every machine composes with the change as it…
mesh/repo-check pass: its merge-check.sh passed
mesh/delivery delivered
On 2026-10-09 a release's gate on the control node read the machine's
report against a newer send another plan had just made there, failed
three builds the machine had reported healthy, and put them back on
every machine to a controller older than the store's schema; that
controller then passed the newer plan's gate from its own health.

- A gate keeps what its send carried (digest, sequence) and reads the
  report against it; a report on the last send is on it too.
- A gate judges only the build the machine was last sent: another build
  there supersedes the judging — no verdict, nothing put back.
- A controller is told its build (MESH_CONTROLLER_VERSION, ${version}
  in a process's env) and records how far it reads the store's schema;
  a put-back to a build that reaches less, or never said, is refused
  and the current build kept, said as urgent.
- A release's open gate holds other sends of its modules there, and a
  plan's own first send waits on it.
2026-10-09 17:15:40 +02:00
jschoubben 58cb586c37 Answer the review of hq issues 348 and 349: gaps, parts, the newest merge in any state
mesh/merge-gate pass: builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step; every machine composes with the change as it…
mesh/repo-check pass: its merge-check.sh passed
mesh/delivery delivered
- A reopened fault keeps its gaps: it was there at a send unless the send
  fell in one, so a send that breaks a machine recovered before it still
  fails its gate (A2).
- An undecided part holds only the conditions that name it (A4).
- D2 holds a silent resolver for the next run again, refused or not: a
  burst of refusals is also a restart (A3).
- A late merge is planned at the newest planned merge of its branch in any
  state, not only an open one (A1); merge times to the nanosecond (A5).
2026-10-09 15:00:56 +02:00
jschoubben 997a4925b0 Order a branch's plans by its merges, and build the newest commit (hq issue 349)
A merge acted on late by the catch-up made its plan after the plan of the
merge that followed it, superseded it by creation time, and folded its
unbuilt modules into a plan at the older commit: on 2026-10-09 the
forge's security fix (a082615b) was superseded by 8ff8197a. A plan now
keeps its merge time (migration 0086), supersession follows it, and a
merge older than an open plan of its branch is planned at that plan's
commit, which contains it.
2026-10-09 15:00:56 +02:00
jochen 1fdc68a8aa Tell the operator at once when sends wait for the bus's planned step, and say it before the merge (hq issue 336)
mesh/merge-gate pass: builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step; every machine composes with the change as it…
mesh/repo-check pass: its merge-check.sh passed
mesh/delivery superseded: a newer head of the same pull request
For 28 minutes on 2026-10-08 every send to the control-node was refused for a new bus build that only a
person's bus upgrade moves, and no condition said so: the refusal lived only in each walk's note, and S3
would have called it lateness after half an hour, in words that named neither the bus nor the verb.

- Row S17, bus.<module>.step-waiting: raised on the first watchdog tick after a walk's send is refused for
  the bus, for the operator, naming the machines, what waits, the bus build from and to, since when and
  mesh-controller.bus upgrade. It clears once the bus's machine runs the build the mesh holds.
- S3 leaves out a walk held only by the bus's step.
- A change that builds the bus says in its delivery plan and summary (which mesh/merge-gate carries) that
  merging it needs a person's bus upgrade, and that nothing else reaches its machine until then.
- TestReplay336 fails on the commit before and passes on this one.
2026-10-09 02:33:57 +02:00
jochen add807f034 Say no cycle for a packages edge in a plan's last tier
A packages edge orders nothing, so a module and what packages its source
share a tier by rule; hasCycle counted the edge and the merge handler said
"the last tier depends on itself" of plans with no cycle. Skip the kind as
tiersOf does. The planner tests' cycle rows and property now pass.
2026-10-08 22:22:02 +02:00
jochen 81e5458cbf Test that a carried module takes its lead's pass before its step is read (hq issue 335 review)
mesh/merge-gate pass: builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step; every machine composes with the change as it…
mesh/repo-check pass: its merge-check.sh passed
mesh/delivery delivered
Without the reorder the passed build's walk stopped on the first machine's
later silence; the guard that caught it is now said to be one.
2026-10-08 21:08:12 +02:00
jochen fb74e24c9e Keep a passed gate's verdict when the first machine's later reports go quiet (hq issue 335)
A build that passed on its first machine was judged again from that
machine's next reports while its send to the rest waited; another walk's
unreported send there then failed the passed build at the wait's bound
and put it back.
2026-10-08 21:08:12 +02:00
jochen 249d97d1c8 Make pending assignments safe to race, settle them on a tick, and say only what was checked
Review of #150: a withdrawal could land between the look and the act, a
failed ask read as a build in flight, a request kept the wrong asker, a
build being registered read as not built, build "true" could ask a build
nothing waited on, and a status read changed state. Claim a row under the
machine's hold before making it, keep a request only once asked, settle on
the controller's own tick, raise an assignment not made as a condition
until it is answered, and tie each row to its machine.
2026-10-08 16:38:11 +02:00
jochen 7d63d2e68c Say why assign finds no module, and keep an assignment pending on its build
A merge asks for a new module's build, and assign answered "no module of that
name" until the build registered it, which read as a module nobody registered
(hq issue 325). Keep every build request, tell a build in flight, a module
known and not built, and an unknown name apart, and make an assignment made
while the build runs when the build registers the module.
2026-10-08 16:38:11 +02:00
jochen a63939160e Put a broken module back at once, and excuse a wait only for a move that added an account group (hq issue 318 review)
mesh/merge-gate pass: builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step; every machine composes with the change as it…
mesh/repo-check pass: its merge-check.sh passed
mesh/delivery superseded: a newer delivery to the same trunk took over its walk
2026-10-08 15:25:58 +02:00
jochen 363898ec8a Give every module of a failed send a verdict, and excuse only the wait a build's own send brought (hq issue 318 review) 2026-10-08 15:25:58 +02:00
mesh-admin 3808634a9f Merge pull request 'Count a plan's time from its tier, and save it only when a step changed it (hq issue 296)' (#119) from fix/plans-timer-counts-from-tier into main 2026-10-07 19:04:57 +00:00
jochen ea92af2a7d Say a plan's refused step once, not on every tick, and call a walk a walk (hq issue 296, ADR 0244)
mesh/merge-gate pass: builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step; every machine composes with the change as it…
mesh/repo-check pass: its merge-check.sh passed
mesh/delivery covered: a later merge that contains it was delivered: novox/mesh-controller@bf11a8baacda (merged as 96c34c52 into main, walk plan-17914006…
A refused step was logged on every 30-second tick with the same words; it is said, and kept,
when it is new. The refusal named the retired "release plan".
2026-10-07 20:47:01 +02:00