The controller plans config, templates and moved providers' provisions,
hands bus accounts to the vault and judges the new manifest words, on the
feature's SDK and node-engine validator (feature 57, config and provisioning).
mesh/merge-gate pass: builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step; every machine composes with the change as it…
On 2026-10-09 a release's gate on the control node read the machine's
report against a newer send another plan had just made there, failed
three builds the machine had reported healthy, and put them back on
every machine to a controller older than the store's schema; that
controller then passed the newer plan's gate from its own health.
- A gate keeps what its send carried (digest, sequence) and reads the
report against it; a report on the last send is on it too.
- A gate judges only the build the machine was last sent: another build
there supersedes the judging — no verdict, nothing put back.
- A controller is told its build (MESH_CONTROLLER_VERSION, ${version}
in a process's env) and records how far it reads the store's schema;
a put-back to a build that reaches less, or never said, is refused
and the current build kept, said as urgent.
- A release's open gate holds other sends of its modules there, and a
plan's own first send waits on it.
mesh/merge-gate pass: builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step; every machine composes with the change as it…
The review of PR 179 found four paths no test held: which of two earlier
plans NewestMergeOf takes, a tie between them, gaps kept across a second
reopening in one keeper, and a merge time's fraction of a second.
Two controllers could both act (issue 204), a reconcile's report could
overtake the apply after it and the digest decided (issue 267), and a grant
could make a second writer of a machine's report.
- The lease (internal/lease, ADR 0229): mesh-controller_lease key `holder`,
15 s age, renewed every 5 s by compare-and-set; the epoch is the revision
it was taken at. The gate is the clock (stops 3 s before expiry); a refused
renewal is a loss and the process exits; a holder that stops gives it back.
serve takes it before asserting the bus. Epochs kept in the store
(migration 0068 controller_epoch) as a floor: a bucket raised from nothing
is compacted past it. Unleased (no epoch, S12 urgent) only when nobody
holds it and the bus will not let it be written. A shell command acts
under the holder's epoch, or its own lease when none.
- Declarations carry `epoch` inside the signed envelope, only to a machine
whose latest account carried a report_sequence (mesh-host #35); would-send
is composed with the epoch last sent. Allot and the send both pass the gate.
- Reports: contract in internal/link/order.go (epoch, sequence,
report_sequence, older_than, refused_older). Accounts kept by epoch, then
sequence, then report sequence; older refused, counted; unordered reports
keep the digest rule. Plans by compare-and-set on a revision, with epoch.
Conditions and calls carry the epoch and are not written off the lease.
- S12 and S13 (naming the writer by epoch) watched, D5 run; reset of the
bucket said. Writers table compiled in and enforced in PermissionsFor; the
controller no longer publishes mesh.control.>. A contract per consumed
kind, and the empty-on-error lint over the repository.
- mesh-host pinned to its main with the epoch in the validator (D1 validates
the envelope as sent).
Needs mesh-host's genesis lock with the lease grant (mesh-host PR) for
TestTheInstallersFirstUserListIsWhatTheControllerWouldCompose.
A merge planned without looking at open plans, so two plans worked the
same modules and a stuck plan stayed open for ever. The newer plan folds
in what older plans of the same repository and branch had not built or
sent, and closes them as superseded. A person can close a stuck plan by
id with `plans close <id>`.