Commit Graph
6 Commits
Author SHA1 Message Date
jschoubben b0753e2aac Let a drain lapse, bound the gate's wait on the controller's clock, keep a busy wait out of apply time
mesh/delivery superseded: a newer head of the same pull request
mesh/delivery-group group feat/335-a-busy-container-is-replaced-when-idle checking: 1 of 2 member(s) ready
mesh/merge-gate head b0753e2aac95 merged into trunk 72214ae989b3 — pass: builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus…
mesh/repo-check head b0753e2aac95 merged into trunk 72214ae989b3 — pass: its merge-check.sh passed
Review of #283: a drain whose replacement was withdrawn held the agent for
ever with its health green; the gate trusted the engine's until; a machine
of the rest waiting at the bound read as silent and its apply time held the
wait; an unknown mesh-builder word exited 0; plan said nothing of a busy an
older engine is not sent; and a node with a report and no send broke the
reading of every last report (the store test's NULL).
2026-10-14 00:07:31 +02:00
jschoubben b1546ed28a Hold a walk's first-machine gate while its busy container finishes its build
mesh/delivery superseded: a newer head of the same pull request
mesh/delivery-group group feat/335-a-busy-container-is-replaced-when-idle rejected: its order contradicts itself: novox/mesh-catalog@190608193764, novox/mesh-c…
mesh/merge-gate out of date: judged against trunk 56d6313262e8, the trunk is now cbac703e817d; judged again on a recheck or when it is merged
mesh/repo-check out of date: judged against trunk 56d6313262e8, the trunk is now cbac703e817d; judged again on a recheck or when it is merged
A merge into mesh-controller replaced every build agent and threw away the
checks in flight (issue 594). The manifest's container busy is checked and
sent only to an engine that reads it; a report's busy waits are kept, the
gate starts at the report that says the container replaced, and the wait is
a phase of the delivery time. mesh-builder busy drains the agent and answers
while a build is in hand (novox/hq ADR 0335).
2026-10-13 00:53:10 +02:00
jschoubben e727589e48 End a walk's apply phase at each machine's own report of its send (hq issue 582)
mesh/merge-gate head e727589e483b merged into trunk 961f2e82ea1c — pass: builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus…
mesh/repo-check head e727589e483b merged into trunk 961f2e82ea1c — pass: its merge-check.sh passed
mesh/delivery delivered
The walk records its send to the rest only after every machine was sent,
which takes 20-28 s, so the machine sent first fell outside the 2 s slack,
its report was missed and the phase ended at the next walk's send to it.
Keep each machine's own send time with what it was sent, match its apply
duration by that send and digest, and show each machine's report in the
walk's phases (ADR 0282 decision 6).
2026-10-12 23:18:28 +02:00
jochen 12d4025d30 Say a walk's phases out of order unknown, never a negative time (hq issue 382)
mesh/merge-gate pass: builds build-agent, mesh-controller → ace, g14, novox, shanks; no bus step; every machine composes with the change as it did without …
mesh/repo-check pass: its merge-check.sh passed
mesh/delivery delivered
#206's own walk kept its first send 783 ms before its build, and delivery
walks said send-first measured at -783 ms. A moment recorded before the
one before it now makes both phases unknown: the earlier one's time joins
the unknown time, the later one has none, and the walk goes on from the
later moment. Measured phases and unknown time still add up to the total.
2026-10-10 21:15:48 +02:00
jochen 6805e2bcb3 Walk phases: a report past the silent bound never moves a walk's end; keep phases outside the hold on the plans; first-node gate in words (review of #206)
mesh/delivery superseded: a newer head of the same pull request
mesh/merge-gate pass: builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step; every machine composes with the change as it…
mesh/repo-check fail: its merge-check.sh failed: --- FAIL: TestTheInstallersFirstUserListIsWhatTheControllerWouldCompose (0.71s)
2026-10-10 20:20:07 +02:00
jochen c640341c50 Keep each walk's phases and say a delivery over its budget (hq ADR 0282 slice 1, issue 382)
mesh/delivery superseded: a newer head of the same pull request
mesh/merge-gate pass: builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step; every machine composes with the change as it…
mesh/repo-check fail: its merge-check.sh failed: --- FAIL: TestTheInstallersFirstUserListIsWhatTheControllerWouldCompose (0.62s)
The operator's budget (a leaf module running everywhere within five minutes
of its merge, a core module within ten) cannot be held to without knowing
where a walk's time goes. A walk now keeps when its batch's window closed,
when it was cut and its class (migration 0093), each gate reading, and what
each machine of the rest was sent; 'delivery walks' and plan-moved say its
phases from the merge to every machine of the rest reporting the build
applied, and ended walks keep them as walk-phase durations per class. Probe
D16 reads mesh-delivery's 'times' and raises delivery.<class>.over-budget.
A phase that cannot be measured is said unknown, never zero. Measurement
only: no walk is held, sent or judged differently.
2026-10-10 20:15:01 +02:00