mesh/merge-gate head 060f2a9ca5fd merged into trunk 04730b54a8f2 — pass: builds build-agent, mesh-controller → ace, g14, novox, shanks; no bus step; every …
The gate and the repository's check mount the workspace read-write, so a
build from that tree could hold what the tests wrote under a key that
describes the merge. A check now clones the merge outside the workspace
before anything of the change runs, and builds from that. A check keeps,
and a walk takes, only a build an earlier check of the same pull request
at the same head made: another pull request's build, or an earlier
head's, is never registered. The walk reads the verdicts once
(novox/hq issue 703, review of #328).
mesh/merge-gate head 1666747a2246 merged into trunk 04730b54a8f2 — pass: builds build-agent, mesh-controller → ace, g14, novox, shanks; no bus step; every …
A fresh check asked when only the trunk moved rebuilt every image, though
the reuse key said nothing it is built from changed: a controller check
took about 12 minutes instead of 5.5. The check now keeps a build kept
under its key when a verdict of the build seat names that key and every
digest, names it as the build's own check so a walk takes it, and the
cleanup keeps it while any check names it (novox/hq issue 703).
mesh/merge-gate head 70885ab3c4a3 merged into trunk ca3f43c400ba — pass: builds mesh-controller → novox; no bus step; every machine composes with the chang…
A build made from the source every machine running it runs is marked sent
and sent nothing, yet the tier's wait asked each machine for a report after
that marking. None follows, and the walk waited for ever. Each machine is
now judged by whether it answered its last send, the one whose builds made
the build no move.
mesh/merge-gate head 2f5cc146fe46 merged into trunk 1601cb17432e — pass: builds build-agent, mesh-controller → ace, g14, novox, shanks; no bus step; every …
A release's own gates held its other sends back for ever; an adopted send
lost what the machine ran before; a kept send could grow a build no gate
passed; a take-over matched by commit alone; a rest that went silent ended
done. The node-engine and the resolver still go one machine at a time, since
a fault that cuts a machine off shows only as silence.
mesh/repo-check head c2ea9b4c5187 merged into trunk 1601cb17432e — fail: its merge-check.sh failed: --- FAIL: TestAReleaseSendsTheRestAtOnceAfterTheFirstPa…
mesh/merge-gate head c2ea9b4c5187 merged into trunk 1601cb17432e — pass: builds build-agent, mesh-controller → ace, g14, novox, shanks; no bus step; every …
A release now sends every other machine in one step once its first machine
passed, each judged by its own gate; a failing one is put back without
stopping the others, a silent one is left. A send is kept before it is made,
and a machine already sent what a gate is for is not sent again: the gate
counts from that send and takes over another walk's readings of the same
build there.
mesh/merge-gate head 5c606fd1d48b merged into trunk 372faebf2824 — pass: builds build-agent, mesh-controller → ace, g14, novox, shanks; no bus step; every …
The artifact store takes writes from anything on its network, so a record
planted under another merge's key could have been registered: the walk now
takes a scratch build only when the build seat's own verdict for one of its
pull requests names its key and digests. Deleting by digest also took builds
another check shared (review of #311; novox/hq ADR 0350).
mesh/delivery-group group feat/350-one-build-per-change checking: composed check out of date: novox/mesh-controller@cd49b50c4075 was judged against trunk bff5b…
A merge built every moved module a second time although its check had judged
the same tree (issue 649). The check now builds into the scratch namespace
under a reuse key (source fingerprint plus the builder's own digest), and the
walk of the trunk commit copies a build of the same key by digest instead of
building, saying per module why when it cannot (novox/hq ADR 0350).
mesh/merge-gate pass: builds build-agent, mesh-controller → ace, g14, novox, shanks; no bus step; every machine composes with the change as it did without …
An agent following a rollout had plans answer once, in prose, and polled the
console with a curl loop of its own to be told a plan moved. plans now takes
wait (a plan's id), until (moved, tier or done) and bound, and answers when the
plan moves or the bound passes, saying which, with the plan as data and its
line as the output.
A call's one answer has to reach the console inside its thirty seconds, so
link.AnswersWithin lets a handler that waits on purpose hold its answer up to
LongestAnswer (25s) instead of AnswerWithin; the bound is at most 20s, and a
caller following a plan further asks again.
plans stop|close, plans retry and upgrade release-backlog kept a walk's start or end mark without saying it,
so the router would hold what the walk touched until its bound; each now runs on the bus as plans go does.
A hand stop keeps who stopped it, so its outcome is stopped, not failed (review 15, ADR 0308, issue 532).
The router holds what an open walk touches and tells its result once; it can do so
only if plan-moved names the walk's start and end, the modules and machines it moves,
what a moved tool runner or node-engine carries there, and how long to hold.
A walk whose delivery was held for a person said only that it waits for
mesh-delivery's word and that plans go starts it by hand, pointing the
reader at a hand start instead of the person's decision. Ask mesh-delivery
what holds each waiting walk and say the held delivery, its reason and
mesh-delivery.release, or the delivery not at its turn.
mesh/merge-gate pass: builds build-agent, mesh-controller → ace, g14, novox, shanks; no bus step; every machine composes with the change as it did without …
A walk left the machine holding the bus out of a gated send whenever a
build waited there for that same gate, so a module's new health tool was
refused by the bus on its first machine and the gate could not pass. The
grants step sends that machine its declaration with every build kept,
before the first machine's send; plans and the change plan say it.
mesh/merge-gate pass: builds build-agent, mesh-controller → ace, g14, novox, shanks; no bus step; every machine composes with the change as it did without …
An outcome arriving after its plan failed is kept only in the build records,
so a retry read from the plan alone asked one failed build and the records
then failed the plan again on the next. Settle the tier from the records first.
mesh/merge-gate pass: builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step; every machine composes with the change as it…
mesh/merge-gate pass: builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step; every machine composes with the change as it…
The operator's budget (a leaf module running everywhere within five minutes
of its merge, a core module within ten) cannot be held to without knowing
where a walk's time goes. A walk now keeps when its batch's window closed,
when it was cut and its class (migration 0093), each gate reading, and what
each machine of the rest was sent; 'delivery walks' and plan-moved say its
phases from the merge to every machine of the rest reporting the build
applied, and ended walks keep them as walk-phase durations per class. Probe
D16 reads mesh-delivery's 'times' and raises delivery.<class>.over-budget.
A phase that cannot be measured is said unknown, never zero. Measurement
only: no walk is held, sent or judged differently.
mesh/merge-gate pass: builds build-agent, mesh-controller → ace, g14, novox, shanks; no bus step; every machine composes with the change as it did without …
mesh/merge-gate pass: builds build-agent, mesh-controller → ace, g14, novox, shanks; no bus step; every machine composes with the change as it did without …
mesh/merge-gate pass: builds build-agent, mesh-controller → ace, g14, novox, shanks; no bus step; every machine composes with the change as it did without …
mesh/merge-gate pass: builds build-agent, mesh-controller → ace, g14, novox, shanks; no bus step; every machine composes with the change as it did without …
mesh/merge-gate pass: builds build-agent, mesh-controller → ace, g14, novox, shanks; no bus step; every machine composes with the change as it did without …
Every merge opened a walk and the next merge of the branch superseded it: two
catalogue merges 18 s apart left a walk no delivery held, and the operator
started it by hand 58 minutes later. A merge now joins the open batch, kept in
the store (migration 0089), which is cut into one walk when no merge came for
merge-window (90 s) or at merge-window-at-most (10 min): one commit per
repository, the latest of its branch, with every file the batch's merges
changed. One walk at a time; a started walk is never superseded, a waiting one
is folded into the next. The walk names every merge it answers on the wire
(delivery.merges, taken_over_by, batch). A failed walk walks its earlier merges
alone, newest first, until one is delivered. A delivery group's order becomes
tier edges inside the walk. plans shows the batch assembling; S18 and S19
bound its waits; S16 names the merges a waiting walk answers.
mesh/merge-gate pass: builds build-agent, mesh-controller → ace, g14, novox, shanks; no bus step; every machine composes with the change as it did without …
mesh/merge-gate pass: builds build-agent, mesh-controller → ace, g14, novox, shanks; no bus step; every machine composes with the change as it did without …
A what-if named the build seat's holder as packaging the controller's
source, "rebuilt without their own source moving", while it was in the
plan because an open plan had not built it yet. The what-if and the merge
log now say, per module, which changed files of its build source moved it,
or that it is read whole and why: no build source recorded, a newer build
failed, or a plan has not built it yet.
A failed build, or a plan closed before reaching a module, left the
closure its last good build said, and a fix-forward to a newly imported
package would have moved nothing. A missed merge moving only a module
that packages the repository was never caught up, and an older merge
read as history for it through a look that was not its own. The gate,
a pull request's check, the what-if and a delivery's order now read the
same view the merge handler does.
Every merge to the controller's repository planned the controller, the
build seat's holder and the route proxy in three gated tiers, whatever it
changed (issue 338). The planner now maps a merge's files onto the build
source each module's newest trunk build said: a README moves nothing, the
controller's command the controller alone, the proxy's program the proxy
alone. A module with none said, or one an open plan has yet to build, is
read whole as before. Sharing a repository draws no packages edge any more,
and one recorded before neither widens nor orders a plan.
mesh/merge-gate pass: builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step; every machine composes with the change as it…
On 2026-10-09 a release's gate on the control node read the machine's
report against a newer send another plan had just made there, failed
three builds the machine had reported healthy, and put them back on
every machine to a controller older than the store's schema; that
controller then passed the newer plan's gate from its own health.
- A gate keeps what its send carried (digest, sequence) and reads the
report against it; a report on the last send is on it too.
- A gate judges only the build the machine was last sent: another build
there supersedes the judging — no verdict, nothing put back.
- A controller is told its build (MESH_CONTROLLER_VERSION, ${version}
in a process's env) and records how far it reads the store's schema;
a put-back to a build that reaches less, or never said, is refused
and the current build kept, said as urgent.
- A release's open gate holds other sends of its modules there, and a
plan's own first send waits on it.
mesh/merge-gate pass: builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step; every machine composes with the change as it…
- A reopened fault keeps its gaps: it was there at a send unless the send
fell in one, so a send that breaks a machine recovered before it still
fails its gate (A2).
- An undecided part holds only the conditions that name it (A4).
- D2 holds a silent resolver for the next run again, refused or not: a
burst of refusals is also a restart (A3).
- A late merge is planned at the newest planned merge of its branch in any
state, not only an open one (A1); merge times to the nanosecond (A5).
A merge acted on late by the catch-up made its plan after the plan of the
merge that followed it, superseded it by creation time, and folded its
unbuilt modules into a plan at the older commit: on 2026-10-09 the
forge's security fix (a082615b) was superseded by 8ff8197a. A plan now
keeps its merge time (migration 0086), supersession follows it, and a
merge older than an open plan of its branch is planned at that plan's
commit, which contains it.
mesh/merge-gate pass: builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step; every machine composes with the change as it…
For 28 minutes on 2026-10-08 every send to the control-node was refused for a new bus build that only a
person's bus upgrade moves, and no condition said so: the refusal lived only in each walk's note, and S3
would have called it lateness after half an hour, in words that named neither the bus nor the verb.
- Row S17, bus.<module>.step-waiting: raised on the first watchdog tick after a walk's send is refused for
the bus, for the operator, naming the machines, what waits, the bus build from and to, since when and
mesh-controller.bus upgrade. It clears once the bus's machine runs the build the mesh holds.
- S3 leaves out a walk held only by the bus's step.
- A change that builds the bus says in its delivery plan and summary (which mesh/merge-gate carries) that
merging it needs a person's bus upgrade, and that nothing else reaches its machine until then.
- TestReplay336 fails on the commit before and passes on this one.
A packages edge orders nothing, so a module and what packages its source
share a tier by rule; hasCycle counted the edge and the merge handler said
"the last tier depends on itself" of plans with no cycle. Skip the kind as
tiersOf does. The planner tests' cycle rows and property now pass.
mesh/merge-gate pass: builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step; every machine composes with the change as it…
A build that passed on its first machine was judged again from that
machine's next reports while its send to the rest waited; another walk's
unreported send there then failed the passed build at the wait's bound
and put it back.
Review of #150: a withdrawal could land between the look and the act, a
failed ask read as a build in flight, a request kept the wrong asker, a
build being registered read as not built, build "true" could ask a build
nothing waited on, and a status read changed state. Claim a row under the
machine's hold before making it, keep a request only once asked, settle on
the controller's own tick, raise an assignment not made as a condition
until it is answered, and tie each row to its machine.
A merge asks for a new module's build, and assign answered "no module of that
name" until the build registered it, which read as a module nobody registered
(hq issue 325). Keep every build request, tell a build in flight, a module
known and not built, and an unknown name apart, and make an assignment made
while the build runs when the build registers the module.
mesh/merge-gate pass: builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step; every machine composes with the change as it…
mesh/merge-gate pass: builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step; every machine composes with the change as it…
mesh/delivery covered: a later merge that contains it was delivered: novox/mesh-controller@bf11a8baacda (merged as 96c34c52 into main, walk plan-17914006…
A refused step was logged on every 30-second tick with the same words; it is said, and kept,
when it is new. The refusal named the retired "release plan".
mesh/merge-gate pass: builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step; every machine composes with the change as it…
A seat's verb names the shell commands it is the mesh's way to do, and a module says it for its own
tools in its manifest; the tools verb and module list --json carry both, for the mesh MCP server's
search, the agent's instructions and the guard on its shell.
plans said a build queued for minutes had been building for a few seconds: the line counted from
the last save, and every advance saved the plan whether or not it moved, bumping its revision and
saying plan-moved on the bus. The line, status and LATE now count from when the plan entered its
tier with the stalled condition's bound, and an advance that changes nothing writes nothing.
mesh/merge-gate pass: builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step; every machine composes with the change as it…
A plan's gated send for mail carried postgres's and mongodb's new builds
(policy record) to the control node and the anchor on 2026-10-07: a send
composes the machine's whole declaration from the builds the mesh holds,
and the gate only ever looked at modules that roll out. Every send but a
person's push now composes a recorded module from the manifest of the build
the machine was last sent and records that it still carries it; the bus
step moves the bus alone. And each move a gated send carries says how many
of the module's containers it recreates, and whether with a new image or
only their declaration.
While the mesh-delivery seat has a holder on record, a merge that moves no
core module opens its walk and asks nothing until mesh-delivery or a person
says go; nothing of it is registered before its turn, so no other send
carries it. The controller keeps the planner, the gate, sending and the
walk, and gains the verbs the owner asks with: delivery-plan, -order,
-check (a group composed as one future state), deliver, delivery-stop,
delivery-walks; every walk kept is said as plan-moved.
touchedBy is now the only mapping of changed files onto modules — touched, added, and
read by no build — and reachOfMerge the planner's whole answer with the dependency walk.
The merge handler, the plan what-if, the merge gate's width and composition, and a pull
request's check all ask it, so planning and gating cannot disagree. The gate composes
the definitions of the modules a merge would rebuild or add, not every one in the tree,
and the check says the dependents a merge would build after them.
mesh/merge-gate error: the check could not run: a throwaway postgres:17-alpine could not be raised: docker run --label mesh.build=build-1791318263948250337…
mesh/merge-gate error: the check could not run: a throwaway postgres:17-alpine could not be raised: docker run --label mesh.build=build-1791317509716888018…
An image is not byte-reproducible, so ADR 0236's 'same artifacts is no move'
never held for one: a catalogue merge that did not touch the bus rebuilt it,
and every send to the control node waited for a planned bus upgrade.
The builder now records a source fingerprint per build (module tree, context
trees, bases and toolchains by digest). A rebuild with the fingerprint of the
build it repeats is registered with that build's artifacts, handed to modules
standing on it, holds no push, demands no bus step, and a plan sends and
gates nothing for it. Identical artifacts remain a second way to be no move.
The merge of mesh-catalog 7f99fb4a rebuilt 103 modules with the build agent in tier 0, and ADR
0236 recorded it as "a change to the build agent rebuilds most of the catalogue". The agent had
not changed: modules/showcase/index.ts had. showcase is the catalogue's reference module, held
by no machine, and its manifest was not in the merge, so whatTheMergeTouched read the file as
shared code and rebuilt everything built from the repository (88 came out byte-identical). The
agent stood first only because everything is built by it.
Whether a directory is a module is a fact of the repository at the merge commit, so the forge's
announcer now says it: module_dirs, the changed files' directories holding a module.json there,
with module_dirs_said. A changed file inside one is that module's business; only a file in no
such directory is shared. An announcer that does not say keeps the old rule. `plans` what-if
takes the same list as module-dirs.
And a regression for the open question: nothing depends on the build agent except by being
built by it, and built-by never widens a plan, so a change to the agent - manifest or program -
rebuilds the agent alone; what moved beside it is ordered after it.
A send carries the machine's whole declaration, so at the switch to roll the next send of
anything would have carried the old default's backlog, unjudged, to every machine. A gated
send now carries and judges everything waiting on its machine; every other send is refused
or leaves the machine; a release plan walks what waits one machine at a time, the control
node last, and one that fails holds the next until a person releases it.
A build that reported applied was sent everywhere; one that then did nothing, served
no tools or broke its machine's word reached every machine. Now the first machine is
judged by the component's health (the core's definitions, as doctor probes H-*, or a
module's own) three times over two minutes within ten; a failing gate puts the previous
build back there once, marks the build, and says it as a condition and an event.
Upgrades roll out by default; the bus is a planned step; a module deleted at its
source is not built (the public-acme plan failure).