Commit Graph
6 Commits
Author SHA1 Message Date
mesh-tools 97a2d841c7 Land feature 57's controller work on its release branch
The controller plans config, templates and moved providers' provisions,
hands bus accounts to the vault and judges the new manifest words, on the
feature's SDK and node-engine validator (feature 57, config and provisioning).
2026-10-15 21:27:33 +00:00
jschoubben e6e1e3bc89 A gate judges its own send and the build it sent, and never puts the controller back behind its store (hq issue 352)
mesh/merge-gate pass: builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step; every machine composes with the change as it…
mesh/repo-check pass: its merge-check.sh passed
mesh/delivery delivered
On 2026-10-09 a release's gate on the control node read the machine's
report against a newer send another plan had just made there, failed
three builds the machine had reported healthy, and put them back on
every machine to a controller older than the store's schema; that
controller then passed the newer plan's gate from its own health.

- A gate keeps what its send carried (digest, sequence) and reads the
  report against it; a report on the last send is on it too.
- A gate judges only the build the machine was last sent: another build
  there supersedes the judging — no verdict, nothing put back.
- A controller is told its build (MESH_CONTROLLER_VERSION, ${version}
  in a process's env) and records how far it reads the store's schema;
  a put-back to a build that reaches less, or never said, is refused
  and the current build kept, said as urgent.
- A release's open gate holds other sends of its modules there, and a
  plan's own first send waits on it.
2026-10-09 17:15:40 +02:00
jschoubben d9a730307c Test the newest merge's order, a second reopening's gaps and sub-second merge times (hq issues 348, 349)
mesh/merge-gate pass: builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step; every machine composes with the change as it…
mesh/repo-check pass: its merge-check.sh passed
mesh/delivery delivered
The review of PR 179 found four paths no test held: which of two earlier
plans NewestMergeOf takes, a tie between them, gaps kept across a second
reopening in one keeper, and a merge time's fraction of a second.
2026-10-09 15:29:31 +02:00
jochen 2eb9a22c24 Act under a lease, keep accounts by order, one writer at composition (hq to-be 45 Phase 2)
Two controllers could both act (issue 204), a reconcile's report could
overtake the apply after it and the digest decided (issue 267), and a grant
could make a second writer of a machine's report.

- The lease (internal/lease, ADR 0229): mesh-controller_lease key `holder`,
  15 s age, renewed every 5 s by compare-and-set; the epoch is the revision
  it was taken at. The gate is the clock (stops 3 s before expiry); a refused
  renewal is a loss and the process exits; a holder that stops gives it back.
  serve takes it before asserting the bus. Epochs kept in the store
  (migration 0068 controller_epoch) as a floor: a bucket raised from nothing
  is compacted past it. Unleased (no epoch, S12 urgent) only when nobody
  holds it and the bus will not let it be written. A shell command acts
  under the holder's epoch, or its own lease when none.
- Declarations carry `epoch` inside the signed envelope, only to a machine
  whose latest account carried a report_sequence (mesh-host #35); would-send
  is composed with the epoch last sent. Allot and the send both pass the gate.
- Reports: contract in internal/link/order.go (epoch, sequence,
  report_sequence, older_than, refused_older). Accounts kept by epoch, then
  sequence, then report sequence; older refused, counted; unordered reports
  keep the digest rule. Plans by compare-and-set on a revision, with epoch.
  Conditions and calls carry the epoch and are not written off the lease.
- S12 and S13 (naming the writer by epoch) watched, D5 run; reset of the
  bucket said. Writers table compiled in and enforced in PermissionsFor; the
  controller no longer publishes mesh.control.>. A contract per consumed
  kind, and the empty-on-error lint over the repository.
- mesh-host pinned to its main with the epoch in the validator (D1 validates
  the envelope as sent).

Needs mesh-host's genesis lock with the lease grant (mesh-host PR) for
TestTheInstallersFirstUserListIsWhatTheControllerWouldCompose.
2026-10-06 12:29:18 +02:00
jochen 208901c6cc Let a newer plan supersede the older open plans of its repository (hq issue 254, ADR 0218)
A merge planned without looking at open plans, so two plans worked the
same modules and a stuck plan stayed open for ever. The newer plan folds
in what older plans of the same repository and branch had not built or
sent, and closes them as superseded. A person can close a stuck plan by
id with `plans close <id>`.
2026-10-05 18:17:52 +02:00
jschoubben fdf338dbd1 A plan is kept, advanced and resumed from the store: the test 2026-10-01 17:56:06 +02:00