mesh/check failed: g14: novox/mesh-catalog#464: checks/health/go.mod names mesh-sdk a9560890ee26, which is neither on mesh-sdk's trunk nor the group's…
The catalogue's manifests moved their content into template files and fall back to predefined keys, so a copy of
module.json alone no longer passes the catalogue's own check; the bus's Dockerfile is gone from the catalogue.
The controller's readable states, its bucket lists and the composed golden file keep lane C's removal of the
checks-running and plans-building buckets and the build agent's check subjects, and add lane B's grants bucket.
The controller asks no build of anybody (ADR 0501 §5, ADR 0525 clause 6, ADR 0503 §3). Every module of a walk is taken from the
builder's done key; a key not done yet waits, named in the plan, and never fails it.
- C2b/C2c: internal/builder and cmd/mesh-controller's asks go (askABuild, onlyTheBuildersOwn, buildOneAsked, takeIn from an
outcome, buildAgentsOwn, the builder's say and its fallback, the daemon hearing an outcome). The server follows the retired
seats' built subjects only to let go of them, because the installer's carried user list names them.
- C2d: replay, queue, cancel, clear, kill, pause, resume, delivery-check, check-here and merge-gate are refused by name.
- C3: the check queues (CHECKS_READY, CHECKS_OTHER) and their workers, the checks-running and plans-building buckets and
their grants, the build queue and its hold (plans_building.go, queue.go, link/holds.go, builds_nats.go, checks_nats.go).
- C4: merge_gate*.go, the pull request's repo-check path, the Checked event and its layers; a pull request asks the
controller nothing but to tell mesh-config what its head declares.
- C5: the builds bucket is written only by key_takein.
- C10 (help and refusals): the terminal's help lists only what is served.
Integration tests of the plan's tiers, sends, stops and retries now run on a stand-in builder with a done key for every
module (walk_keys_scaffold_integration_test.go); the tests of the asks, the queue, the merge gate and the replays are deleted.
mesh/merge-gate head 185d0294ebd4 merged into trunk 89abce5df955 — pass: builds build-agent, mesh-controller → ace, g14, novox, shanks; no bus step; the ch…
mesh/delivery covered after its stop: a later merge that contains it was delivered: novox/mesh-controller@0b312218f90f (merged as 791786d5 into main, wal…
mesh/check pass 185d0294ebd4 on 89abce5df955 | unit 1756 run, 0 kept, 4 skipped | integration 3034 run, 0 kept, 16 skipped | over bound: integration (…
The checker's integration store answers on a unix socket named in the query of MESH_TEST_POSTGRES
(?host=<socket dir>&sslmode=disable). The identity, inventory and licences fixtures cut the address at
its last slash and appended ?sslmode=disable, dropping host=, so pgx dialled its default socket where no
server is: every store test waited out its 20 s readiness bound, each package ran into go test's
10-minute timeout, and the verdict named only the first failure,
identity.TestACertificateChainsToTheMeshsOwnAuthority.
store.DatabaseForTest now builds that address for every fixture, keeping the query as the template raise
already did; identity's fresh is ForTest rather than a second copy. The readiness bound and its error,
which wraps the driver's cause, are unchanged.
R4e, resumed at tier 1 after a stop of five hours, named ace and shanks silent within seconds of tier 1's send: the
walk judged each machine on every send it had made it, tier 0's of 00:23 too, held against tier 1's templates, and
measured the bound from it. A send carries the whole declaration, so the last one is what a machine is judged on.
The resume kept the tier's entry of before the stop, so the plan read waiting for 5h48m. And plans retry refused a
walk failed only by the gate's silence, though its machines had since applied.
R4e's own delivery plan waited for ever in tier 1: the controller took every
module but build-agent's own from a referenced builder key, and only R4e's
builder and build modules, delivered by that same plan, write references.
The builder now says so in its bucket of instances; until it does, a walk asks
build-agent as before R4e, and an open walk waiting on a key the running
builder cannot reference is judged again at the next look.
ADR 0520 narrowed after its review: mesh-tools-go builds from its own
directory on a pinned base and has its key from mesh-build-image, and
mesh-tools-python is no module, so the set is named, not derived from
the toolchain bases.
The builder writes no key of build-agent or of the toolchain bases its
builds stand on, so a walk moving one would hold its tier for ever.
Until R4g they are build-agent's own, as the builder's module is; the
bases are read from the toolchains, not copied.
A build or check failed now and then on 'Could not resolve host:
novox.internal' between clones that resolved the same name, and its
whole delivery failed with it. A clone whose lookup failed reached
nothing, so it is cloned again with a growing pause for up to 60 s,
each retry said in the build's log as the resolver not answering;
past the bound it fails saying so. Any other git failure fails at
once, as before. Covers a module's own clone, an artifact's context
and a check's repositories.
mesh/merge-gate head 01f615aa0ad6 merged into trunk aa9da942606d — pass: group feat/r4d composed: every machine composes with the change as it did without …
mesh/check failed: unit: ..test: node:internal/modules/esm/resolve:241 | 01f615aa0ad6 on aa9da942606d | unit 3345 run, 0 kept, 7 skipped | integration…
mesh-catalog #434 runs the nats server as the upstream image named in module.json (ADR 0497) and
deletes modules/nats/Dockerfile, so the check failed opening it. The manifest's upstream nats
artifact is read first; the Dockerfile only for a catalogue from before the move (the captured copy).
mesh/delivery covered: a later merge that contains it was delivered: novox/mesh-controller@01f615aa0ad6 (merged as 8f2d22db into main, walk plan-17926707…
mesh/merge-gate head f501eaca4305 merged into trunk 4463991e0609 — pass: builds build-agent, mesh-controller → ace, g14, novox, shanks; no bus step; every …
The registry push tags the image a second time, so removing only the build tag freed nothing.
The held image a comparison pulls goes after it is read, and a node under the floor leaves the ask
to another build node instead of taking it and failing.
A full / made every check on shanks end 'store never became ready' with the reason erased by --rm.
Builds now remove their local image tag, narrowed source and context clone; a build or check
refuses under 20 GiB free on / and the workspace, saying so; the throwaway store is no longer
started with --rm and a store that does not come up reports its exit code and last 20 log lines.
The controller tells mesh-config what a pull request declares, asks the approved held values with each check, and the build agent and merge gate lay them over the change's composition only: a key the trunk does not declare yet can then be approved before the merge (ADR 0502).