jschoubben bfb271a91b Take done keys in from a durable pull consumer, a batch at a time (issue 1945, ADR 0544)
The take-in watched the builder's and the indexer's buckets, started a follower
per module that retried on a 30 s timer, and at start took every catalogued
module in alphabetically: on 2026-10-25 a restart took in about 2 modules a
minute, about 190 followers queued behind 16 slots, and every take-in composed
two or three times even with nothing new, so a new build waited 30 minutes and
more for its credential.

Now two durable consumers named mesh-controller-take-in read the indexer's
modules bucket (every module's last trunk value when the consumer is made, then
each write) and the builder's builds bucket (each write), at most 16 keys
unacknowledged each. The bus keeps what is not taken in: the start's look is the
consumers' own catch-up, and a restart costs only what was left unacknowledged.
A batch reads the catalogue once, takes each module in once, and asks the
composer twice: once for its modules' nodes, once for the bus's node with the
grants. A module registered at its trunk whose compositions and grant exist, or
that this process took in at the same trunk, composes nothing; a key delivered
again is taken in whole. A wait for the builder's or indexer's next write is
acknowledged, a wait on a read or a failure refused with a 30 s delay. The
backlog is in status, and a backlog standing still for 5 minutes raises
take-in-stalled. The controller's account is granted the two consumers' acks.

The follower tests go with the followers: twelve tests become three.
Research 072: the take-ins on a bounded pull consumer (milestone 4, done keys
alone) and the start's look composing only what changed (milestone 2).
2026-10-25 17:59:20 +01:00
jschoubben 788fb681ec Drop the plan state from the store and the assignments: migration 0108 and placement-only assignments (release 6, issue 1945 B9, B4) 2026-10-24 16:42:02 +02:00
jschoubben dc456d5660 Delete the controller's plan machinery: plans, batches, merge window, tiers, gate, retry and healers H1 and H2 (release 6, issue 1945 B7) 2026-10-24 16:27:55 +02:00
jschoubben e419d0182f Delete the builder, the build asks, the build queue and the merge gate: the builder's keys are the only way a module is built (issues 1851, 1299, 1318; C2b-C5, C10)
The controller asks no build of anybody (ADR 0501 §5, ADR 0525 clause 6, ADR 0503 §3). Every module of a walk is taken from the
builder's done key; a key not done yet waits, named in the plan, and never fails it.

- C2b/C2c: internal/builder and cmd/mesh-controller's asks go (askABuild, onlyTheBuildersOwn, buildOneAsked, takeIn from an
  outcome, buildAgentsOwn, the builder's say and its fallback, the daemon hearing an outcome). The server follows the retired
  seats' built subjects only to let go of them, because the installer's carried user list names them.
- C2d: replay, queue, cancel, clear, kill, pause, resume, delivery-check, check-here and merge-gate are refused by name.
- C3: the check queues (CHECKS_READY, CHECKS_OTHER) and their workers, the checks-running and plans-building buckets and
  their grants, the build queue and its hold (plans_building.go, queue.go, link/holds.go, builds_nats.go, checks_nats.go).
- C4: merge_gate*.go, the pull request's repo-check path, the Checked event and its layers; a pull request asks the
  controller nothing but to tell mesh-config what its head declares.
- C5: the builds bucket is written only by key_takein.
- C10 (help and refusals): the terminal's help lists only what is served.

Integration tests of the plan's tiers, sends, stops and retries now run on a stand-in builder with a done key for every
module (walk_keys_scaffold_integration_test.go); the tests of the asks, the queue, the merge gate and the replays are deleted.
2026-10-23 15:55:15 +02:00
jschoubben d36e0ea278 Announce the controller's states, keep every module's word, and grant a read only where its owner announced the state readable; the copied list of the controller's mirrors goes (issue 1790, D1-D4, ADR 0495, ADR 0513 §3) 2026-10-22 19:05:04 +02:00
jschoubben c7039d81e1 Refuse build, rebuild and replay --register by name, naming what replaced them, and delete the hand builds (issue 1851, A11a, ADR 0501 §5) 2026-10-22 19:05:04 +02:00
jschoubben 7743bd0d4b Delete the walk's reuse of a check's build: a walk takes keys and asks build-agent only for the builder's own module (issue 1851, A8) 2026-10-22 19:05:04 +02:00
jschoubben f00b6aff8b Judge a recorded build, not build-agent's outcome, and read a registration's warrant from the merge a key names, so a done key registers under the same rules (issue 1851, A4a) 2026-10-22 19:05:04 +02:00
jschoubben 6bcfbeb5b2 Issue a bus process's account when its module is assigned or gains it (issue 1226) 2026-10-21 19:21:11 +02:00
mesh-tools 013dad4688 Take the catalogue, overlay and validator from mesh-sdk in cmd/mesh-builder and cmd/mesh-controller, a to g (issue 1381, 1 of 6 import swaps)
Swaps three import paths for mesh-sdk's go/catalogue, go/overlay and go/validate (the same packages, copied from this repository at 6c2a8d62) and lets gofmt order the groups. The six swap commits compile together once the pin commit (go.mod, modules.txt) is on the branch; each alone does not, because a file on the SDK's types cannot call one still on the old package.
2026-10-20 08:22:07 +00:00
jschoubben 68088ec782 Record the inputs of a build's source fingerprint in its build record (issue 1215) 2026-10-19 11:54:21 +02:00
jschoubben 6e487fa01f Say each build's source fingerprint in builds, the one tool that reads what the builder recorded (issue 1204)
mesh/merge-gate head 6e487fa01f63 merged into trunk 7a74cee83f88 — pass: builds mesh-controller → novox; no bus step; every machine composes with the chang…
mesh/repo-check head 6e487fa01f63 merged into trunk 7a74cee83f88 — pass: its merge-check.sh passed
mesh/delivery delivered
The builder records a build's source fingerprint, but no tool read it back, so design 47 R3a could not
reproduce a recorded one (ADR 0437 clause 5).
2026-10-19 10:28:45 +02:00
jschoubben ef0ca69cb0 The first build of a module a merge adds on the operator's Approve passes the guard of a build through a verb on the warrant it checked (issue 1146, AC9) 2026-10-19 00:48:56 +02:00
jschoubben 703badcf5a Name the commit, build and rollout on the assignment and the assignments on the rollout (issue 1095)
A send that records what a machine was sent writes, in the assignment of each module it carried a build of, the build, what it published, the commit, the rollout that sent it and since when: filled where the assignment names nothing, replaced when the commit moved, never blanked by a push by hand. A plan's sends are made as the plan, so they name it, and the plan lists the assignments each send changed with the build and commit before and after, the builds it carried and the steps taken. The builds, plans and node verbs say the links. node.sent_builds is written and read as before; SentBuilds from the assignments follows with the delivery that drops the column. Acceptance 10 is a test that enters by a merge heard and cut into a plan and writes no key by hand.
2026-10-18 03:22:57 +02:00
mesh-tools d984816844 Feature 57 (config and provisioning): release mesh-controller, the reviewed release branch merged with main, on top of main 2026-10-16 08:28:38 +00:00
jochen 0d1bb035cb Let a recorded module's move that restarts nothing roll out with its walk (issue 785)
Under a module's own record (its manifest's, or its irreplaceable data's), every
move waited for a person's push, even one that only changed a tools bundle: the
database server stayed behind on ace on 2026-10-15 although its walk said it
recreated none of its containers. ADR 0377 lets such a move roll out.

A move is judged per machine against the build that machine was last sent: it
goes when no container, mounted file, data path, data declaration, provider or
(for a module with data) long-running process changes. A person's record, the
bus and any move that cannot be judged still wait. The walk keeps per machine
which way each recorded module went and why, says it in its note and log, and
status names a machine behind with `push <node>` only for a move that waits.
2026-10-15 14:27:37 +02:00
jschoubben 38c87a7e47 Compare a build with the one the mesh registered, not the newest, which may be one put back (review of #336, hq issue 721)
mesh/merge-gate head 38c87a7e4714 merged into trunk c2ec0a601acb — pass: builds build-agent, mesh-controller → ace, g14, novox, shanks; no bus step; every …
mesh/repo-check head 38c87a7e4714 merged into trunk c2ec0a601acb — fail: its merge-check.sh failed: --- FAIL: TestAWalkWhoseEveryBuildCameOutTheSameIsDone …
mesh/delivery-group group fix/a-module-moves-only-when-its-program-changes rejected: a member's own check failed
mesh/delivery superseded: a newer head of the same pull request
2026-10-14 21:30:09 +02:00
jschoubben cd49b50c40 Build a change once: the check builds what its merge moves, the walk takes it by key
mesh/merge-gate out of date: judged against trunk bff5b7f0e4f8, the trunk is now 372faebf2824; judged again on a recheck or when it is merged
mesh/repo-check out of date: judged against trunk bff5b7f0e4f8, the trunk is now 372faebf2824; judged again on a recheck or when it is merged
mesh/delivery-group group feat/350-one-build-per-change checking: composed check out of date: novox/mesh-controller@cd49b50c4075 was judged against trunk bff5b…
mesh/delivery superseded: a newer head of the same pull request
A merge built every moved module a second time although its check had judged
the same tree (issue 649). The check now builds into the scratch namespace
under a reuse key (source fingerprint plus the builder's own digest), and the
walk of the trunk commit copies a build of the same key by digest instead of
building, saying per module why when it cannot (novox/hq ADR 0350).
2026-10-13 23:04:40 +02:00
jschoubben fae6bd0a87 Say each machine's last send in status and node show, and as fields in status --json (novox/hq issue 485)
mesh/delivery superseded: a newer head of the same pull request
mesh/merge-gate pass: builds build-agent, mesh-controller → ace, g14, novox, shanks; no bus step; every machine composes with the change as it did without …
mesh/repo-check pass: its merge-check.sh passed
The send record of issue 234 is now readable only through the controller's
verbs (issue 506), and only plan said it. status says per machine when it was
last sent a declaration, by whom, from which generation and what it answered;
node show says it in full with the refusal's words. A machine's answer is read
from its report only when that report is about the send and came after it.
2026-10-11 20:40:48 +02:00
jschoubben a330c564ba Say a module assigned and left out of its machine's composition as a condition (issue 380)
mesh/merge-gate pass: builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step; every machine composes with the change as it…
mesh/repo-check pass: its merge-check.sh passed
mesh/delivery superseded: a newer head of the same pull request
A push leaves out a module whose settings do not compose and sends the rest,
which is right, but only plan said so: nfs-server ran nowhere for days while
the operator believed it ran. The self-check now raises needs-operator for a
setting nobody gave, naming the setting and the command, and left-out for any
other cause; both warnings, cleared once the module composes or is unassigned.
status and node show list the same modules as assigned, not applied.
2026-10-11 04:43:58 +02:00
jochen 6c616838a5 Move a module on a merge only when its build source holds a changed file (hq ADR 0267, issue 363)
Every merge to the controller's repository planned the controller, the
build seat's holder and the route proxy in three gated tiers, whatever it
changed (issue 338). The planner now maps a merge's files onto the build
source each module's newest trunk build said: a README moves nothing, the
controller's command the controller alone, the proxy's program the proxy
alone. A module with none said, or one an open plan has yet to build, is
read whole as before. Sharing a repository draws no packages edge any more,
and one recorded before neither widens nor orders a plan.
2026-10-10 03:20:36 +02:00
jochen 95e7a7120a Register only from a protected trunk of the same repository, and mark the serving controller never the terminal
mesh/merge-gate pass: builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step; every machine composes with the change as it…
mesh/repo-check pass: its merge-check.sh passed
mesh/delivery covered: a later merge that contains it was delivered: novox/mesh-controller@eca6390d6fe4 (merged as 33dc85d8 into main, walk plan-17915444…
A source repository's name is not its identity, and a trunk anyone may push
to makes the trunk rule mean nothing (the review of 2026-10-09). Through any
verb a module now registers only from a repository on the mesh's forge whose
trunk refuses direct pushes, requires a status and lets no administrator
merge past one, asked of the forge's own tools; and only from the repository
by the forge's id, recorded at registration (migration 0084), so one deleted
and made again under the name is refused. The serving controller marks its
environment, so nothing it runs or starts reads as the terminal, and a
terminal request covers only the repository and path it asked.
2026-10-09 12:37:18 +02:00
jochen a5e8baf6da Register a module only from the repository the catalogue builds it from
An agent could make a repository of its own, or fork one the mesh builds
from, commit a module.json naming sudo or mesh-host, and ask the build verb
for it: the outcome was registered under that name, and the next push made
whoever wrote it root on every node (novox/hq ADR 0266 §7, the review of
2026-10-09). The trunk rule checked the trunk of the repository built, which
was the agent's.

The take-in, which every outcome reaches whichever verb asked it, now
registers a module only from its registered repository, and a new module only
from a repository the catalogue already builds from (a merge adding one);
anything else only when the build request was kept as asked at the
controller's terminal (migration 0084). Through a verb, a build of a
repository the catalogue builds nothing from is not asked at all.
2026-10-09 12:37:18 +02:00
jochen 1e04670052 Serve the read verbs on the serving controller's own connection, and name every connection
Each verb ran as a process that dialled the bus, so hundreds of short
connections an hour, all named mesh-controller, hid any client reconnecting
in a loop (hq issue 327). D15 now says a user whose connections keep dropping.
2026-10-08 21:08:34 +02:00
jochen 8adb7f1a05 Give each pending assignment its own condition, and keep a raised row until it clears
mesh/merge-gate pass: builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step; every machine composes with the change as it…
mesh/repo-check pass: its merge-check.sh passed
mesh/delivery superseded: a newer delivery to the same trunk took over its walk
mesh/delivery-group group fix/assign-says-why-a-module-is-not-there closed: a member was closed before the group merged
Second review of #150: one key per machine and module let a newer failure
be cleared in the tick that raised it, pruning could orphan an open
condition, and a build no longer waited for read as never asked although it
may still run.
2026-10-08 16:45:43 +02:00
jochen 249d97d1c8 Make pending assignments safe to race, settle them on a tick, and say only what was checked
Review of #150: a withdrawal could land between the look and the act, a
failed ask read as a build in flight, a request kept the wrong asker, a
build being registered read as not built, build "true" could ask a build
nothing waited on, and a status read changed state. Claim a row under the
machine's hold before making it, keep a request only once asked, settle on
the controller's own tick, raise an assignment not made as a condition
until it is answered, and tie each row to its machine.
2026-10-08 16:38:11 +02:00
jochen 7d63d2e68c Say why assign finds no module, and keep an assignment pending on its build
A merge asks for a new module's build, and assign answered "no module of that
name" until the build registered it, which read as a module nobody registered
(hq issue 325). Keep every build request, tell a build in flight, a module
known and not built, and an unknown name apart, and make an assignment made
while the build runs when the build registers the module.
2026-10-08 16:38:11 +02:00
jochen 9907df6530 Record the bases a build copies, keep them by the builds that stood on them, and copy each image once
A copied base was named only in what a build stood on, and nowhere when the build failed,
so the store's sweep could never let one go (hq issue 321). One repository per upstream
image stops each module asking the public registry for the same image again, and letting
an index go now takes its own platform manifests, which otherwise kept every byte. A
person can record the copies no record names through the new mirrors verb (hq ADR 0257).

The forge test fix is the same commit as on feat/plain-notifications: main fails without it.
2026-10-08 15:47:42 +02:00
jochen 875a4e5758 Count a plan's time from its tier, and save it only when a step changed it (hq issue 296)
plans said a build queued for minutes had been building for a few seconds: the line counted from
the last save, and every advance saved the plan whether or not it moved, bumping its revision and
saying plan-moved on the bus. The line, status and LATE now count from when the plan entered its
tier with the stalled condition's bound, and an advance that changes nothing writes nothing.
2026-10-07 20:42:13 +02:00
jochen 3d05d74400 Publish only a commit on its module's trunk; post a pull request's change plan (hq ADR 0238)
mesh/merge-gate pass: the change touches no module of the mesh's graph
mesh/delivery delivered
mesh/delivery-group group feat/the-graph-decides-what-is-checked merged: every member is merged
One commit, one plan: a commit off the trunk — a pull request's head, a branch built by
hand, a rebuild or replay of one — is for checking. The build seat reads from its clone
which branches hold the commit, and the controller records and never registers a build
whose commit is not on the branch the module follows (the repository's default for a
new one), so nothing off the trunk can be sent.

A pull request's check now carries its change plan, computed by the planner: what a
merge would build in which order, what each machine would receive, and what is not an
ordinary send — the bus step, a module waiting for a person, a provider's consumers.
2026-10-06 22:49:55 +02:00
jschoubben 792352dfad Read a rebuild of an unchanged source as no move, whatever image digest it made (hq issue 280)
mesh/merge-gate error: the check could not run: a throwaway postgres:17-alpine could not be raised: docker run --label mesh.build=build-1791317509716888018…
mesh/delivery delivered
An image is not byte-reproducible, so ADR 0236's 'same artifacts is no move'
never held for one: a catalogue merge that did not touch the bus rebuilt it,
and every send to the control node waited for a planned bus upgrade.

The builder now records a source fingerprint per build (module tree, context
trees, bases and toolchains by digest). A rebuild with the fingerprint of the
build it repeats is registered with that build's artifacts, handed to modules
standing on it, holds no push, demands no bus step, and a plan sends and
gates nothing for it. Identical artifacts remain a second way to be no move.
2026-10-06 22:09:11 +02:00
jochen d7bf1bae83 Name the decision this builds: hq ADR 0236 (0235 is the bus's snapshot) 2026-10-06 18:56:54 +02:00
jochen d9289ef6d4 Gate a release plan's first machine and roll a failed build back there (hq ADR 0236)
A build that reported applied was sent everywhere; one that then did nothing, served
no tools or broke its machine's word reached every machine. Now the first machine is
judged by the component's health (the core's definitions, as doctor probes H-*, or a
module's own) three times over two minutes within ten; a failing gate puts the previous
build back there once, marks the build, and says it as a condition and an event.
Upgrades roll out by default; the bus is a planned step; a module deleted at its
source is not built (the public-acme plan failure).
2026-10-06 18:56:54 +02:00
jochen 751e39186c Heal what is known, under a brake, and say every repair (hq to-be 45 Phase 3)
Research 031 counted the repairs people made by hand: a push to unstick a
plan waiting on a report, a controller restarted to make an object again, a
plan closed, a consumer re-made from now. Each was the ordinary path taken
again by someone who noticed. The healer registry makes each a registered
response to one condition kind, with a budget, a settle and its event:

- H1 sent-not-reported: ask the machine's node-engine to report again
  (mesh.node.<n>.ask.report); if it does not report what it was sent, send
  it again, never moving a build a policy or a plan holds back
- H2 stalled: close a plan whose wait is superseded or finished
- H3 holder-silent / consumer-lost: the send's own assertion of the bus's
  objects (issue 208's note)
- H4 consumer-behind: consumer-reset, only for a consumer the stream table
  marks resettable (the controller's own events consumer)
- H5 is the identity provider's own repair (ADR 0224 §5), registered only

Success is the observation clearing the condition, never the healer; a spent
budget hands the condition to the operator, urgent, with what was tried, and
no healer touches it again. Every act is begun in the store before it is made
(migration 0070), kept in the condition's tried as "healer Hn" and said as
the seat event healer-acted; a heal is never a hand act. More than twelve acts
in an hour stop every healer until an hour after the last, said urgently.
Only the lease holder heals.

S15 is live: a cause repaired by hand twice in a fortnight raises
healer-wanted, naming the healer that was not enough where one exists. D6's
far-behind finding has its own kind, consumer-behind. Nodes are granted the
question; the controller's grant gains healer-acted (genesis lock in
mesh-host). `healers` lists the registry, the acts and the brake; status
counts the week's heals.
2026-10-06 14:26:26 +02:00
jochen 2eb9a22c24 Act under a lease, keep accounts by order, one writer at composition (hq to-be 45 Phase 2)
Two controllers could both act (issue 204), a reconcile's report could
overtake the apply after it and the digest decided (issue 267), and a grant
could make a second writer of a machine's report.

- The lease (internal/lease, ADR 0229): mesh-controller_lease key `holder`,
  15 s age, renewed every 5 s by compare-and-set; the epoch is the revision
  it was taken at. The gate is the clock (stops 3 s before expiry); a refused
  renewal is a loss and the process exits; a holder that stops gives it back.
  serve takes it before asserting the bus. Epochs kept in the store
  (migration 0068 controller_epoch) as a floor: a bucket raised from nothing
  is compacted past it. Unleased (no epoch, S12 urgent) only when nobody
  holds it and the bus will not let it be written. A shell command acts
  under the holder's epoch, or its own lease when none.
- Declarations carry `epoch` inside the signed envelope, only to a machine
  whose latest account carried a report_sequence (mesh-host #35); would-send
  is composed with the epoch last sent. Allot and the send both pass the gate.
- Reports: contract in internal/link/order.go (epoch, sequence,
  report_sequence, older_than, refused_older). Accounts kept by epoch, then
  sequence, then report sequence; older refused, counted; unordered reports
  keep the digest rule. Plans by compare-and-set on a revision, with epoch.
  Conditions and calls carry the epoch and are not written off the lease.
- S12 and S13 (naming the writer by epoch) watched, D5 run; reset of the
  bucket said. Writers table compiled in and enforced in PermissionsFor; the
  controller no longer publishes mesh.control.>. A contract per consumed
  kind, and the empty-on-error lint over the repository.
- mesh-host pinned to its main with the epoch in the validator (D1 validates
  the envelope as sent).

Needs mesh-host's genesis lock with the lease grant (mesh-host PR) for
TestTheInstallersFirstUserListIsWhatTheControllerWouldCompose.
2026-10-06 12:29:18 +02:00
jochen bb1607e424 Say when the mesh is wrong: conditions, watchdogs, the bus's advisories, doctor (hq to-be 45 Phase 1)
Every one of the 48 core failures of research 031 was found by a person
looking; the mesh's answers carried the fact for whoever asked and told
nobody.

- The condition store (to-be 45 §2): mesh-controller_conditions, one key
  per open condition, written by compare-and-set so a person's silence
  and the watchdogs never lose each other's word; every transition kept
  ninety days in mesh-controller_condition-history and said as the
  seat's events condition-raised / condition-changed / condition-cleared
  (the condition at the top level, with event, at, change, why, show),
  offered again while the bus is away. Raised and cleared by observation
  only; a clearing reopened within ten minutes is the same condition with
  its count up, its silence kept. Verbs: conditions, conditions show,
  conditions silence (a hand act, at most a week), conditions history.
- ADR 0224's provider standing is the first kind, provider-failing, held
  by the provider's events; the provider_standing table is no longer read
  or written (left in place: dropping it is the operator's word).
- status leads with the open conditions, urgent first, and says all well
  only with none open; conditions it cannot read are said and not well.
- The signals table compiled in, one watchdog loop over it every 30s: S1
  heartbeat (3 intervals, asleep machines excepted, control node urgent
  after 30 min), S2 report after a send, S3 plan tier, S4 event loop deaf,
  S5 merge not acted, S6 ask lost, S7 call hung, S8 provider silent, S9
  advisories, S10 self-check silent, S11 node tools silent, S13 stale
  refusals; S12, S14, S15 deferred with their reasons. A row that cannot
  see raises probe-failed and clears nothing. A test generated from the
  table suppresses each signal inside and past its bound.
- The bus's advisories (maximum deliveries, a mesh consumer deleted) and
  the controller's own slow consumer and refused subjects, said in the
  mesh's words.
- doctor: the probe registry D1-D10 (D5 deferred) and DW, every five
  minutes, each in thirty seconds; a probe that cannot run is never a
  pass. D1 validates with mesh-host's own validator. Every run ends with
  the doctor-heartbeat event mesh-watcher listens for.
- The controller is granted its new buckets, events, the two advisories
  and $SRV.INFO; the node tools their tools-alive heartbeat. The streams
  and consumers the controller asserts and the ones D6/D7 expect are one
  derivation.
2026-10-06 10:21:11 +02:00
jochen e74c32ed50 Keep calls and hand acts on the bus, answer status at once, record durations (hq to-be 45 Phase 0)
A controller restart lost every call's outcome, `status` composed the mesh
while its caller waited (18.6s live on 2026-10-06, past the 10s window), a
repair by hand left no trace, and the core's bounds had nothing measured to
be set from.

- calls: kept in the controller's bucket mesh-controller_calls (last 1000 or
  14 days, answers bounded to 64 KiB), read by id across a restart; a
  controller starting marks a stopped one's running calls abandoned; each
  call names its caller from the inbox its answer goes to.
- status: the serving controller composes it at start, after news from a
  machine, a build or an acting verb, and every minute; the verb answers the
  last composition at once with when and how long it took. Composing resolves
  each machine once instead of twice.
- hand-act log in mesh-controller_hand-acts: push (required through the seat),
  plans stop/close, broker consumer-reset and the new hand-act record take
  --why/--cause/--condition; `hand-acts` lists them and repeated causes;
  status counts the week's.
- durations (migration 0066): apply (send to first report), heartbeat gap,
  plan tier and build, recorded as heard; `durations` summarises them.
- the controller's seat row takes this binary's definition of its own verbs,
  so the console no longer judges calls against an older build's schema.
- the controller is granted its two buckets' subjects.
2026-10-06 02:59:36 +02:00
jochen 6d620f77c3 Bound a consumer's identity by the provision it requires (hq issue 263)
The one global 20-character bound made every consumer pay an object
store's key length, even for provisions that keep no name, and a single
overflow refused the provider's whole declaration. An offer now states
its own bound (identity: {max, in} or false); unsaid, a provider told its
consumers keeps 20 and one told nothing keeps none. module check judges
every identity on the longest machine name before merge, and a provider
leaves an overflowing consumer out of its grants and composes, with the
consumer named by push, plan and status (ADR 0225).
2026-10-06 02:16:20 +02:00
jochen 8d9d33ae85 Report a provider that keeps failing a consumer in status (hq ADR 0224)
The identity provider failed every consumer for a day and status called the
mesh well (hq issue 179). The controller now follows every provider's
provisioner.failing/recovered, keeps the newest failing word per provider,
machine and consumer (migration 0065), and status, its JSON and node show
name it until it recovers. Every module that receives contributions is
granted the two events, so no manifest can forget them.
2026-10-06 00:13:23 +02:00
jochen 106507b1d3 Show and change the build queue through the controller, and have plans follow it (hq ADR 0219)
Nothing showed what waited for a build machine, and an ask could not be
dropped without leaving the plan that made it waiting for ever. New verbs:
queue, cancel, clear, rebuild, replay, kill, pause, resume, and plans retry.
Every ask a person drops is recorded failed through the same take-in as a
failed build; a plan keeps the id it asked each module under and matches
its outcome by it. replay is a dry run unless registered, and registering
an older commit than one registered since needs --older (hq issue 207).
A plan waiting on a seat paused on every holder says so and is not late;
a failed plan can be retried, and a rebuild joins the plan holding the
module instead of running beside it.
2026-10-05 19:17:56 +02:00
jschoubben 134d039ff8 Take no dry run in: mark it on the request, echo it on the outcome, set it aside
A dry run of an unreviewed branch was heard by the daemon like any build, registered, and its
definition reached a machine (novox/hq issue 240). The mark now travels with the build and the
daemon records, registers and plans nothing for it.
2026-10-05 09:50:20 +02:00
jochen 10f948e970 A module depends on the node seats that apply its resources (hq ADR 0207)
Seed node-package-manager and node-container-runtime. Derive each module's
dependencies from its declared service, package and container resources;
judge them over the node's whole set, exempting the foundation. Refuse at
assign (several modules may go on as one act) and at unassign of the last
holder; report at composition in status, behind one switch.
2026-10-04 12:34:11 +02:00
jschoubben c7884f5a72 The store keeps what the records name (hq ADR 0189)
The mesh names what may go from its own build records — a digest it did not
record making is never named, which is what keeps the sweep away from the
images genesis pushed. An artifact stays because a definition the mesh holds
names it, or because it belongs to one of the five most recent successful
builds of its module.

internal/artifacts asks the store to let go of one; internal/inventory
decides and remembers (migration 0055); the sweep runs after a build the mesh
recorded, which is when both the bytes and the keep set moved. Never fatal to
a build.

And the manifest side of while-stopped, refused from the definition alone:
no schedule, run-once, a container the module does not declare, itself.
2026-10-04 02:32:19 +02:00
jochen 9745c1ab31 An older build request never replaces a newer one's artifact
Builds of one module in flight together finish in any order, and the mesh
took whatever it heard last as what the module is: RegisterModule overwrote
the module's manifest unconditionally, and Held/BuiltAgainst/ReadRepositories
ordered builds by when they were recorded. A postgres build asked before the
mesh-tools runtime fix finished after the one asked after it, and the next
push deployed the stale image (novox/hq issue 219).

A build is now ordered by when it was asked, read from the build-<nanos> id
the controller writes: build.asked and module.built_asked (migration 0055).
A registration from an earlier request than the module's current one is
recorded and refused as superseded. A plan takes as its outcome only a build
asked at or after its own ask, so an earlier plan's leftover build cannot
settle a later plan. Ids of any other shape keep the old order.
2026-10-04 00:22:11 +02:00
jochen 6784efae75 A commit is never a branch to follow (hq issue 215)
A build asked at a commit recorded that commit as the module's ref. Every merge after it failed to
match the module and its plan left it out without a word, and every plan that rebuilt it asked for
the same old commit again. Registration now keeps the branch the module followed (the default
branch for a new one); matching and re-asking read a recorded commit as the default branch, which
heals records already pinned this way; and a merge says which modules of its repository it leaves
out because they follow another branch.
2026-10-03 22:22:08 +02:00
jochen ff5ef0ab60 The controller asks the build role that has a holder, and hears both roles' outcomes (hq ADR 0190, the handover)
A controller that asked node-build-agent from its first run would queue every build where nothing
pulls, and the build that registers build-agent — the first holder — would be among them. So the
role is chosen at ask time from the catalogue: the current role when any assigned module claims it,
the retired one while only the builder does, the current one when neither. Outcomes are followed on
both seats, the controller may publish to both, and a build's log is read under whichever role did
it; a machine on the retired role is proven on the bus to take that role's asks. The switch order
is written where the role is named, and the retired half is marked for removal with the seat row.
2026-10-03 02:51:03 +02:00
jochen 8eb6c3e94a A tool container on the runtime's image is refused once the runtime is registered (hq ADR 0175, to-be 38 WP2.4)
A module declaring tools, a container, and a build on mesh-tools' runtime image is a container whose
purpose is serving tools — the pattern the node's tool runtime retires. Once node-tools is in the
catalogue, registering one is refused by name, with the record that says why; before, it is accepted
as it always was, so a mesh converts in the design's order and nothing is refused before there is
anything to move to. This is the mechanism that keeps the old pattern from returning by habit.

Judged from a repository manifest's own build.on, and for a built manifest — which carries no build
— from what its build stood on, now recorded beside the commit as part of a module's provenance.
2026-10-02 18:30:14 +02:00
jschoubben b5df244096 The mesh says what filters a converged machine: filters kept per node, shown by node show, named by status, and previewed with their fates (hq ADR 0168)
A host reports every table and chain that refuses traffic with its owner,
and a converged machine's found firewall's state. The controller keeps both
on the node's record (migration 0054), shows them on node show, names every
converged machine something other than the mesh filters in status — text
and JSON, and such a machine is not well — and the converge preview lists
what filters the machine with the fate of each: retired with the front end,
left as the runtime's, left as a ban, or left in force and not the mesh's.
What was invisible for eleven hours (issues 144, 145) is said by name.
2026-10-02 12:00:12 +02:00
jschoubben 73a34cc0a7 A take is a comparison: the preview, its refusals, the strays, and the policy said at build (hq ADR 0163)
The host now reports, for every held thing, the facts a take compares; the controller keeps them, and
take puts them beside what the module declares — the found image and its age against the declared one,
the found networks and who else is on them, ports and mounts, a found file's difference from the
declared content — and refuses a downgrade without --downgrade and a differing file without --replace
<path>. Without --yes the comparison is printed and nothing is taken. node show lists the facts and
the strays the machine reports. build and the daemon's take-in say when a module's policy rolls the
result out at once. The own-secret refusal points at the provider form for a required secret.
2026-10-01 21:25:27 +02:00
jschoubben a69a832248 A merge produces a tiered plan the mesh keeps (hq ADR 0162)
A module's dependencies are one relation in the catalogue — stands-on, packages, built-by, declared —
answered by one call. A merge takes what moved and everything reachable from it, sorts the set into
tiers (a code dependency in the same tier, a build dependency after its base is built, a runtime
dependency after the build machine is built and running; the build machine's own base comes first,
built by the one that runs), writes the plan to the store, asks the first tier and returns. Every
outcome advances the plan; a ticker advances what outcomes cannot; a controller replaced mid-plan
resumes it. status lists open plans and names one that has waited too long.
2026-10-01 17:53:55 +02:00