With no plan left to name a build or a send to keep the plans, a want names what a collection must keep, and the
composition is where the provisioner's plans are composed for the assignments mirror (ADR 0539 clauses 1 and 5);
the assignments no longer name a node's build, so the controller replaced is the newest earlier build of it.
The assigner holds a move of a module of policy record from the judgement beside its digest, so it is judged by ADR
0377 §3's tests against the composition the node's have names, a held one never taking its place, and written again
when the have changes or a person sets the policy (ADR 0539 clauses 2 and 14). The node-engine's own file
operator-keys, from its setting operator-signers, carries the operator's public keys (clause 3).
With no plan left to take a done key in, a write of the builder's keys registers the new fingerprint, composes the
module's nodes and the bus's user list, and writes its grant, so the assigner's rules can name it (ADR 0539 clauses
5 and 7). The new controller composes every node at its start, and the controller it replaced at its own
fingerprint, the operator's way back (clause 10); the merge window's, silent sends' and building plans' buckets are
no longer asserted and are deleted once, each said as the event bucket-deleted (clause 13). The assigner may read
the compositions' digests, and a node-engine hears its backup holder's backed-up.
Each act that changed what a node runs now writes that node's compositions, and its wants follow by the assigner's
rules; a bus upgrade composes the bus's machines and answers the want the operator writes, since the assigner never
moves the bus (ADR 0539 clauses 5, 7 and 15). A node-engine may ask its own backup holder before a data module moves.
Every act that sent a declaration now writes compositions instead, by compare-and-set under the lease, and a
module's compositions are kept for its five newest fingerprints and whatever its want or have names (ADR 0539
clauses 1 to 5 and 14). A module the mesh provides itself, which no want can name, rides in the node's own.
mesh/delivery covered after its stop: a later walk that contains it was delivered: plan-1792856223268385098 (novox/mesh-controller at 34b105ea into main,…
mesh/check failed: forge: go.mod of novox/mesh-controller#453 cannot be read to place the mesh-sdk its tests read: nats: no responders available for r…
Under a loaded run the report came 5.7 s and then more than 10 s after the send, and anchor was named silent. Now the
fake send makes anchor's report as soon as tier 1 is recorded, and the test waits for it; laptop never reports and is
named silent.
mesh/delivery-group group fix/1937-done-key-blobs rejected: composed together: the checker's verdict at the members' heads (dbd9c3771cd8): integration: github.…
chainBuildByID answered a trimmed build without SourceFingerprint since builds moved to the builds bucket (issue 1090), so
currentFingerprints read every fingerprint empty and grantsFrom skipped every module: mesh-controller_grants has never held
a key, and TestTheGrantOfAnIssuedCredentialIsOnTheBus failed on main.
mesh/delivery-group group fix/1937-done-key-blobs rejected: composed together: the checker's verdict at the members' heads (c20fdcb8c623): integration: github.…
A done key the controller never took in holds no manifest, and the store's nightly collector deleted its bare blob:
node-tools', mesh-host's and the forge bridge's keys name blobs that answer 404. Since issue 1933 the take-in refuses such a
key, and nothing built it again. held (in the serving process, HEADs only) lets the builder ask before it reuses a key; a
refused take-in now names every gone archive and says artifacts-gone with the module, key, fingerprint and references.
A sweep read what it keeps before what was ever recorded, so a take-in's
build recorded between the two reads, by a concurrent take-in off the
plans' hold, was eligible and let go of seconds after the take-in read
it; a new module's build is unkept until it is registered. Now the sweep
reads the records first and keeps what a build recorded within the hour
or an open plan names, and names every reference it lets go of; a take-in
holds every artifact in the store before recording, failing on one the
store lacks; and RecordBuild clears artifact_collected as RecordMirrored
does.
mesh/check failed: g14: novox/mesh-catalog#464: checks/health/go.mod names mesh-sdk a9560890ee26, which is neither on mesh-sdk's trunk nor the group's…
The catalogue's manifests moved their content into template files and fall back to predefined keys, so a copy of
module.json alone no longer passes the catalogue's own check; the bus's Dockerfile is gone from the catalogue.
The controller's readable states, its bucket lists and the composed golden file keep lane C's removal of the
checks-running and plans-building buckets and the build agent's check subjects, and add lane B's grants bucket.
The controller asks no build of anybody (ADR 0501 §5, ADR 0525 clause 6, ADR 0503 §3). Every module of a walk is taken from the
builder's done key; a key not done yet waits, named in the plan, and never fails it.
- C2b/C2c: internal/builder and cmd/mesh-controller's asks go (askABuild, onlyTheBuildersOwn, buildOneAsked, takeIn from an
outcome, buildAgentsOwn, the builder's say and its fallback, the daemon hearing an outcome). The server follows the retired
seats' built subjects only to let go of them, because the installer's carried user list names them.
- C2d: replay, queue, cancel, clear, kill, pause, resume, delivery-check, check-here and merge-gate are refused by name.
- C3: the check queues (CHECKS_READY, CHECKS_OTHER) and their workers, the checks-running and plans-building buckets and
their grants, the build queue and its hold (plans_building.go, queue.go, link/holds.go, builds_nats.go, checks_nats.go).
- C4: merge_gate*.go, the pull request's repo-check path, the Checked event and its layers; a pull request asks the
controller nothing but to tell mesh-config what its head declares.
- C5: the builds bucket is written only by key_takein.
- C10 (help and refusals): the terminal's help lists only what is served.
Integration tests of the plan's tiers, sends, stops and retries now run on a stand-in builder with a done key for every
module (walk_keys_scaffold_integration_test.go); the tests of the asks, the queue, the merge gate and the replays are deleted.
mesh/delivery covered after its failure: a later walk that contains it was delivered: plan-1792753090890815254 (novox/mesh-controller at c834e4f8 into ma…
mesh/check pass 149f89e8f9bf on 0173d9c70e59 | unit 1759 run, 0 kept, 4 skipped | integration 3037 run, 0 kept, 16 skipped | over bound: integration (…
A build heard and recorded and not registered kept its refusal only when a
plan was open or the plans were held. A tier's first failure fails its plan,
so later refusals were lost; a Retry then settled those builds built from
their records, sent the modules' old versions and reported the plan done.
A build without a readable manifest never reached its plan at all.
Keep the refusal in the store and the process whatever the plans' state, and
fail the asking plan by the build's id when the module is not known.
Issue 1713.
The gitea module keeps the operator's login beside mesh-tools on every main so
the operator can merge by hand; an agent's account there is still refused.
The forge requires no status to merge any more (ADR 0534 §1); a trunk is
trusted when it takes no push, its merge whitelist names mesh-tools alone and
no administrator merges past its rule, so only mesh-delivery lands a commit
there, on a passing mesh/check and the operator's Approve. The old rule failed
the 11:51 delivery plan once mesh-catalog's status was unticked.
mesh/merge-gate head 185d0294ebd4 merged into trunk 89abce5df955 — pass: builds build-agent, mesh-controller → ace, g14, novox, shanks; no bus step; the ch…
mesh/delivery covered after its stop: a later merge that contains it was delivered: novox/mesh-controller@0b312218f90f (merged as 791786d5 into main, wal…
mesh/check pass 185d0294ebd4 on 89abce5df955 | unit 1756 run, 0 kept, 4 skipped | integration 3034 run, 0 kept, 16 skipped | over bound: integration (…
The checker's integration store answers on a unix socket named in the query of MESH_TEST_POSTGRES
(?host=<socket dir>&sslmode=disable). The identity, inventory and licences fixtures cut the address at
its last slash and appended ?sslmode=disable, dropping host=, so pgx dialled its default socket where no
server is: every store test waited out its 20 s readiness bound, each package ran into go test's
10-minute timeout, and the verdict named only the first failure,
identity.TestACertificateChainsToTheMeshsOwnAuthority.
store.DatabaseForTest now builds that address for every fixture, keeping the query as the template raise
already did; identity's fresh is ForTest rather than a second copy. The readiness bound and its error,
which wraps the driver's cause, are unchanged.
mesh/merge-gate head 4d4d51eb017f merged into trunk 219fdcd7f00c — pass: builds build-agent, mesh-controller → ace, g14, novox, shanks; no bus step; the ch…
R4e, resumed at tier 1 after a stop of five hours, named ace and shanks silent within seconds of tier 1's send: the
walk judged each machine on every send it had made it, tier 0's of 00:23 too, held against tier 1's templates, and
measured the bound from it. A send carries the whole declaration, so the last one is what a machine is judged on.
The resume kept the tier's entry of before the stop, so the plan read waiting for 5h48m. And plans retry refused a
walk failed only by the gate's silence, though its machines had since applied.
mesh/merge-gate head 55ba7f2cb83c merged into trunk 296e11d499cb — pass: builds mesh-controller → novox; no bus step; the change touches no module of the m…