mesh/merge-gate pass: builds build-agent, mesh-controller → ace, g14, novox, shanks; no bus step; every machine composes with the change as it did without …
Every merge opened a walk and the next merge of the branch superseded it: two
catalogue merges 18 s apart left a walk no delivery held, and the operator
started it by hand 58 minutes later. A merge now joins the open batch, kept in
the store (migration 0089), which is cut into one walk when no merge came for
merge-window (90 s) or at merge-window-at-most (10 min): one commit per
repository, the latest of its branch, with every file the batch's merges
changed. One walk at a time; a started walk is never superseded, a waiting one
is folded into the next. The walk names every merge it answers on the wire
(delivery.merges, taken_over_by, batch). A failed walk walks its earlier merges
alone, newest first, until one is delivered. A delivery group's order becomes
tier edges inside the walk. plans shows the batch assembling; S18 and S19
bound its waits; S16 names the merges a waiting walk answers.
mesh/merge-gate pass: builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step; every machine composes with the change as it…
- commandEnvironment takes the terminal as a bool instead of reading an
empty verb as one; every non-terminal line names its verb and is stripped
of MESH_CLI_TERMINAL, and a test with the mark set in the serving
environment fails when that strip is taken out.
- On the control-node the operator's account is the terminal only from a
login session, as the node-engine reads it from the kernel's cgroup; the
tool runner and the account's user units run as the operator too, and are
ordinary calls. The request carries `session` (field-name tests on both
sides).
- A pull request the forge never announced is named with its number in
the condition's headline (hq issue 347), from the stalled line's
`number`, which mesh-delivery sends.
mesh-delivery now says a pull request on a base that requires the merge
check, with none on its head for ten minutes, as a stalled line in state
unannounced, which D14 raises as delivery.<id>.stalled. No delivery exists
for it, so the generic words — stop it, release it — named an act that
does not apply. It now says the pull request has had no merge check, why,
and that a new commit on its branch is announced and checked.
On the control node every agent ran as the operator's account, which has
passwordless sudo, so an agent could become root without a person (hq ADR
0266). A node now names an agent account at the controller's terminal only;
the agent's module declares it never to become root, the node-engine judges
that, and the self-check (DA) raises agent-can-become-root while it does not
hold, so ADR 0259's router can rest on it.
mesh/merge-gate pass: builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step; every machine composes with the change as it…
For 28 minutes on 2026-10-08 every send to the control-node was refused for a new bus build that only a
person's bus upgrade moves, and no condition said so: the refusal lived only in each walk's note, and S3
would have called it lateness after half an hour, in words that named neither the bus nor the verb.
- Row S17, bus.<module>.step-waiting: raised on the first watchdog tick after a walk's send is refused for
the bus, for the operator, naming the machines, what waits, the bus build from and to, since when and
mesh-controller.bus upgrade. It clears once the bus's machine runs the build the mesh holds.
- S3 leaves out a walk held only by the bus's step.
- A change that builds the bus says in its delivery plan and summary (which mesh/merge-gate carries) that
merging it needs a person's bus upgrade, and that nothing else reaches its machine until then.
- TestReplay336 fails on the commit before and passes on this one.
mesh/merge-gate pass: builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step; every machine composes with the change as it…
The third review of #170 (hq issue 339): a setting overrides any key a
provider serves, so any caller of the settings verb could move a database's
port, a registry's port or an issuer to a listener of its own and collect
what consumers present. TerminalKeys now derives from the manifest: places,
accesses, every served key and every setting a served value asks for, and
every setting a file marked `trusted` asks for. `trusted` is the catalogue's
word, taken out before the declaration; `module check` warns of a file that
asks for a setting without saying, and refuses it from 2026-10-30. The hand
list is gone. A directory used as found is now its own condition kind, the
operator's, never urgent, and the gate exempts it where it exempts a relogin.
Each verb ran as a process that dialled the bus, so hundreds of short
connections an hour, all named mesh-controller, hid any client reconnecting
in a loop (hq issue 327). D15 now says a user whose connections keep dropping.
Design 25 promised a dead-letter stream that did not exist: a message a
consumer gave up on stayed only in its source, which drops it after a week,
and its condition cleared when the advisories stopped (hq issue 330, ADR 0264).
mesh/merge-gate pass: builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step; every machine composes with the change as it…
The backlog is held after any failed walk, not only a release, and a check is a pull
request's status; the words said the last release failed its check.
mesh/merge-gate pass: builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step; every machine composes with the change as it…
The release-held words said "release them, or leave them held" without the modules,
the machines or the mesh MCP server, so the operator could neither tell what waited
nor where to act (ADR 0258). The controller's restart needs missed the same suffix.
A test now holds every need that opens with a verb only the mesh MCP server performs
to name it, so a new kind cannot miss it.
Review of #150: a withdrawal could land between the look and the act, a
failed ask read as a build in flight, a request kept the wrong asker, a
build being registered read as not built, build "true" could ask a build
nothing waited on, and a status read changed state. Claim a row under the
machine's hold before making it, keep a request only once asked, settle on
the controller's own tick, raise an assignment not made as a condition
until it is answered, and tie each row to its machine.
mesh/merge-gate pass: builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step; every machine composes with the change as it…
A "Needs you" with no button left the operator guessing where to act, and a click
could silence a condition that says data is gone. The place is named in the
glossary's word, the mesh MCP server (hq ADR 0258).
mesh/merge-gate pass: builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step; every machine composes with the change as it…
Review found that a desk click proves nothing about who chose, that refused words
could turn "Needs you" into "Nothing for you to do", that sound words were refused,
and that a quiet warning whose words came to need the operator was never said
(hq ADR 0258).
mesh/merge-gate pass: builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step; every machine composes with the change as it…
mesh/merge-gate pass: builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step; every machine composes with the change as it…
The operator could not tell from a notification whether to act, and was told to
have an agent do it. Each condition now says "Nothing for you to do." or
"Needs you:" with one thing they can do themselves, and carries the actions the
operator channel performs when chosen (hq ADR 0253).
mesh/merge-gate pass: builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step; every machine composes with the change as it…
The operator could not read the desktop notifications: they carried plan ids,
commits, keys and verb syntax. The words the operator reads now travel with the
condition, so every channel says them (hq ADR 0253).