Say a pull request the forge never announced as one, with what to do (hq issue 347) #178

Merged
mesh-admin merged 2 commits from fix/347-an-unannounced-pull-request-says-what-to-do into main 2026-10-09 11:38:48 +00:00
2 Commits
Author SHA1 Message Date
jochen 14ab2ddd9b Announce this head: the pull request was opened after its push, which the announcer misses (hq issue 347)
mesh/merge-gate pass: builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step; every machine composes with the change as it…
mesh/repo-check pass: its merge-check.sh passed
mesh/delivery delivered
2026-10-09 13:22:22 +02:00
jochen 510c91f144 Say a pull request the forge never announced as one, with what to do (hq issue 347)
mesh-delivery now says a pull request on a base that requires the merge
check, with none on its head for ten minutes, as a stalled line in state
unannounced, which D14 raises as delivery.<id>.stalled. No delivery exists
for it, so the generic words — stop it, release it — named an act that
does not apply. It now says the pull request has had no merge check, why,
and that a new commit on its branch is announced and checked.
2026-10-09 13:15:20 +02:00