The controller's machine moves it from the container to a process by
starting the process first and removing the container once the process
is up (mesh-host's `replaces`). For that moment two controllers share the
store and the bus. Checked what each does:
- the seat's verbs: a queue group per seat, each call answered once. Safe.
- the controller's consumers on CONTROL and EVENTS: push consumers with
no delivery group, so the second bind is refused with "consumer is
already bound" and serve exited. The process would restart for ever,
the host would never see it up, and the container would never go. The
second controller now stands by and binds when the first lets go
(tested on a real bus; fails without the change).
- plans: read, changed and saved whole by the 30s timer, by build
outcomes, by a merge and by `plans stop`. Two timers would each ask a
tier the other had just asked. Working the plans now takes a
session-level advisory lock on the inventory: the timer skips while
another holds it, the other paths wait for it. Build asks happen only
inside plan work and are covered by the same lock.
The controller is to be declared as a Go bundle run by a process instead of
an image (novox/hq issue 213, ADR 0188 §1, §3). The composer could not
express that honestly yet:
- a module declaring tools had every bundle served by the node's runtime,
so the controller's own binary would have been launched a second time as
an MCP child; a bundle one of the module's resources runs is now served
only when it says `loads`
- a module's accounts went after the mesh-computed files, so secrets owned
by the account a process runs as were refused on the first apply; a
module's `user` resources now go first
- `prepares` derived its step only from a container; a process is now
prepared by the same program with `prepare` as a run-once process
- a process may say what it `replaces` (a resource of its module it no
longer declares), prefixed as the host records it, so the host keeps the
old one running until the process is (needs mesh-host's `replaces`)
This lands before the controller's manifest uses any of it: the running
controller composes its own declaration, so the code that fills the new
shape must be live first.