1d0a40592b6c84e6025e5b71b777ec72863ac5d0
Every ask-taken and step-progress listed and read every pipeline to find its test run, so after a cancel hundreds of late events of ended runs cost one to two seconds each and held the runner's one event consumer for minutes. The state test-runs now keeps an ask key ask.<ask> holding the run's key, written with each ask a run is given and deleted with the run; an event of an ended run's ask is judged from that key and the run alone and acknowledged at once, one journal line per hundred. Builds: design 47 H2 H-A-500 (a) and its addenda (1)
mesh-delivery
Novox Mesh — delivery: the parts that build, check and deliver a change by watching and writing keys on the bus (ADR 0429).
Made by the mesh from the gitea module's config value repositories (novox/hq ADR 0428). Main takes no push: a change reaches it by a pull request whose mesh/repo-check (this repository's merge-check.sh) and mesh/merge-gate passed.
Description
Novox Mesh — delivery: the parts that build, check and deliver a change by watching and writing keys on the bus (ADR 0429).
39 MiB
Languages
Go
99.2%
JavaScript
0.8%