39a2c6a944390aa61f81a010545e638a094a40bf
main.20 and main.22 never ended: a mover with no step placed (no registration) held the end even after a placed mover's required step failed and nothing was open. It now holds the end only while the pipeline could still pass. Builds: design 47 H §746, H-A-163, G A-327
mesh-delivery
Novox Mesh — delivery: the parts that build, check and deliver a change by watching and writing keys on the bus (ADR 0429).
Made by the mesh from the gitea module's config value repositories (novox/hq ADR 0428). Main takes no push: a change reaches it by a pull request whose mesh/repo-check (this repository's merge-check.sh) and mesh/merge-gate passed.
Description
Novox Mesh — delivery: the parts that build, check and deliver a change by watching and writing keys on the bus (ADR 0429).
35 MiB
Languages
Go
99.1%
JavaScript
0.9%