440c3c69aee9a03e9097df2a7706588fbd021640
Wants written before the sequence existed carry a revision number as their run (322, 323), so the run compare refused every new want of a lower sequence. The order is now the bus's own: the assigner writes a want with compare-and-set on the key revision its pass read, a stale pass loses to the newer write and says so once, and the next pass judges the key again. The run stays in the want as the pipeline's sequence, information for the why and the tools. Builds: design 47 H2 §813 (1), H-A-504 third addendum
mesh-delivery
Novox Mesh — delivery: the parts that build, check and deliver a change by watching and writing keys on the bus (ADR 0429).
Made by the mesh from the gitea module's config value repositories (novox/hq ADR 0428). Main takes no push: a change reaches it by a pull request whose mesh/repo-check (this repository's merge-check.sh) and mesh/merge-gate passed.
Description
Novox Mesh — delivery: the parts that build, check and deliver a change by watching and writing keys on the bus (ADR 0429).
39 MiB
Languages
Go
99.2%
JavaScript
0.8%