477d351fc0fef889e6a7806ab9de57cb41b80b48
Two writers of a node's want could leave it at an older delivery, and the node-engine could not tell a newer want from an older one. Each want now carries run: the source revision of the pipeline that released it, or, for a want of no pipeline (a put, a placement's build, a removal), the newest source the assigner holds. It is written by compare-and-set (create, or update at the revision read), refusing a want whose run is lower than the one written, said in the journal; a want that differs only by its run stands, so no node composes again for it. The answer's other half is the node-engine's: its manifest states declaration-reads and declaration-writes, the assigner's neither. Builds: design 47 H2 §813 (1); H-A-355 (1), H-A-416
mesh-delivery
Novox Mesh — delivery: the parts that build, check and deliver a change by watching and writing keys on the bus (ADR 0429).
Made by the mesh from the gitea module's config value repositories (novox/hq ADR 0428). Main takes no push: a change reaches it by a pull request whose mesh/repo-check (this repository's merge-check.sh) and mesh/merge-gate passed.
Description
Novox Mesh — delivery: the parts that build, check and deliver a change by watching and writing keys on the bus (ADR 0429).
38 MiB
Languages
Go
99.2%
JavaScript
0.8%