jschoubben 5d3164b5b7 Builder: take a released version the catalog holds at the start; a refused tag waits the pause (H-A-484)
A version-released whose tag the seat git's holder refused was handed back at once,
spent its five deliveries in seconds and was dropped by the bus: its reservation stood
and its publish item asked again every 30 s for ever. At the start the builder now holds
every built, unreleased reservation against the catalog's verb versions and takes a
released one in as its version-released would (tag, release, bound and item ended,
findings cleared); a refused tag is handed back with the publish pause. The tag check
itself is the forge module's, already accepting a nested package path on the catalog's
trunk.

Builds: design 47 H2 H-A-484, H-A-484 addendum
2026-11-22 18:49:52 +01:00

mesh-delivery

Novox Mesh — delivery: the parts that build, check and deliver a change by watching and writing keys on the bus (ADR 0429).

Made by the mesh from the gitea module's config value repositories (novox/hq ADR 0428). Main takes no push: a change reaches it by a pull request whose mesh/repo-check (this repository's merge-check.sh) and mesh/merge-gate passed.

S
Description
Novox Mesh — delivery: the parts that build, check and deliver a change by watching and writing keys on the bus (ADR 0429).
Readme
42 MiB
Languages
Go 99.2%
JavaScript 0.8%