5dba7fe68bf5647c121f4d11607c85174b36991e
A take-in that moves nothing keeps no revision for its source number, so validate's case before, read as the step's revision minus one, named a revision never kept and could not run. The take-in now writes, on the catalog revision it keeps, the field base: the newest kept revision below it, the one it pins for its pipeline, in the same write; absent on the branch's first take-in. The assigner's validate reads the base from the revision it already asks for; where the revision names none the case before is empty and its end says so, never a could-not-run. - mesh-delivery-contracts: the seat mesh-catalog's CatalogRevision gains base (schema, fixture, generated Go and TypeScript by seatgen). - mesh-delivery-indexer: keepBranchEntries names the base it pins; the pin test's rows check it. - mesh-delivery-assigner: before reads the base; the validate test asks a revision with none, and both stand-ins name the base as the take-in does. Builds: design 47 H-A-151, H-A-154 (hq design/47-H1-answers-59 01842bbe), H-A-147, H-A-108 (3), design 47 H §743
mesh-delivery
Novox Mesh — delivery: the parts that build, check and deliver a change by watching and writing keys on the bus (ADR 0429).
Made by the mesh from the gitea module's config value repositories (novox/hq ADR 0428). Main takes no push: a change reaches it by a pull request whose mesh/repo-check (this repository's merge-check.sh) and mesh/merge-gate passed.
Description
Novox Mesh — delivery: the parts that build, check and deliver a change by watching and writing keys on the bus (ADR 0429).
35 MiB
Languages
Go
99.1%
JavaScript
0.9%