jschoubben c27393fb5e P13 testruns-placed-cause: the runner's catalog view tells a revision taken in whole as well as a changed entry, so a newer revision with the same entries places the pipeline that waited for it
WireCatalogProcess takes held beside changed, set before the first ask; the runner advances its waiting pipelines from it as from changed. The test-runs whole test answers the view's ask of revision 2 late.

Builds: design 47 H2 H-A-747 (DQ-56, H-A-717), A-448
2026-11-25 18:30:50 +01:00

mesh-delivery

Novox Mesh — delivery: the parts that build, check and deliver a change by watching and writing keys on the bus (ADR 0429).

Made by the mesh from the gitea module's config value repositories (novox/hq ADR 0428). Main takes no push: a change reaches it by a pull request whose mesh/repo-check (this repository's merge-check.sh) and mesh/merge-gate passed.

S
Description
Novox Mesh — delivery: the parts that build, check and deliver a change by watching and writing keys on the bus (ADR 0429).
Readme
42 MiB
Languages
Go 99.2%
JavaScript 0.8%