jschoubben f6c8fa46e0 Merge feat/47-H2-corrections-e into feat/47-H2-corrections-b
The whole test TestAMoverLeftUnfinishedIsPutInTheNextPipelineAndWanted holds both sides' steps: one fake answers e1's revision 99 (nothing), engine/gitea/free entries from revision 4 and the builds seat's published answer, and b8's holders and grants answers and Base per revision. b8's AC-P6b steps are renumbered from revisions/pipelines 4,5 to 11,12 (main.11, main.12; the build seat's holder moves at revision 12, lib l12), after e1's 4 to 10; they use app's fingerprint src2:a9 as the fake holds it from revision 9.

Builds: design 47 H2 H-A-595, H-A-594, H-A-608, H-A-623, H-A-643
2026-11-25 19:53:26 +01:00

mesh-delivery

Novox Mesh — delivery: the parts that build, check and deliver a change by watching and writing keys on the bus (ADR 0429).

Made by the mesh from the gitea module's config value repositories (novox/hq ADR 0428). Main takes no push: a change reaches it by a pull request, which the checker judges. The forge's branch protection of main requires no status today (read from the forge on 2026-11-25: no required check, no status on the pull request read); this repository holds no merge-check.sh.

S
Description
Novox Mesh — delivery: the parts that build, check and deliver a change by watching and writing keys on the bus (ADR 0429).
Readme
42 MiB
Languages
Go 99.2%
JavaScript 0.8%