Register the replays of issues 292 and 298 (hq ADR 0237) #60

Merged
mesh-admin merged 1 commits from replays/292-298 into main 2026-10-07 23:41:45 +00:00
Contributor

Adds R292 and R298 to replays/register.go. Both are tests in mesh-controller (PR on branch replays/292-298, commit 80f9d26), and each is laid over the commit before its fix.

go run ./cmd/prove --repos <clones> R292 R298:

  • R292 (issue 292): PROVED. It fails on 582f4a0 ("drill" was repaired by hand 2 times in 14 days) and passes on 863ebd4.
  • R298 (issue 298): PROVED. It fails on e550c95 ("says it serves checks, which that seat's protocol does not promise") and passes on f6aea4b.

Merge after the controller PR. On this laptop the local merge-check.sh failed two TypeScript container-runtime tests ("listing instances/networks fails rather than reporting none"). This change does not touch them, and the build seat's verdict is the one that counts.

Adds R292 and R298 to `replays/register.go`. Both are tests in mesh-controller (PR on branch replays/292-298, commit 80f9d26), and each is laid over the commit before its fix. `go run ./cmd/prove --repos <clones> R292 R298`: - R292 (issue 292): PROVED. It fails on 582f4a0 ("drill" was repaired by hand 2 times in 14 days) and passes on 863ebd4. - R298 (issue 298): PROVED. It fails on e550c95 ("says it serves checks, which that seat's protocol does not promise") and passes on f6aea4b. Merge after the controller PR. On this laptop the local `merge-check.sh` failed two TypeScript container-runtime tests ("listing instances/networks fails rather than reporting none"). This change does not touch them, and the build seat's verdict is the one that counts.
mesh-admin added 1 commit 2026-10-07 23:27:59 +00:00
Register the replays of issues 292 and 298, each proved to fail before its fix and pass on it (hq ADR 0237)
mesh/merge-gate pass: the change touches no module of the mesh's graph
mesh/repo-check pass: its merge-check.sh passed, each part in its toolchain: merge-check.sh (typescript), replays/merge-check.sh (go)
mesh/delivery delivered
mesh/delivery-group group replays/292-298 delivered: every member is delivered
d0b0c7b02a
Author
Contributor

Delivery novox/mesh-lab@d0b0c7b02aad — delivered since 2026-10-07T23:42:13Z

Delivery plan — builds nothing: the change touches no module of the mesh's graph

Group replays/292-298, in order: novox/mesh-controller@80f9d26e6d → novox/mesh-lab@d0b0c7b02a

  • composed together: pass — every machine composes with the change as it did without (4 of 4 compose)

Transitions

  • 2026-10-07 23:28 (new) → proposed (announced): novox/mesh-lab#60's head announced
  • 2026-10-07 23:28 proposed → checked (checked): the verdict names this commit
  • 2026-10-07 23:28 checked → ready (accepted): the gate passed or warned, and the repository's own check did not fail
  • 2026-10-07 23:42 ready → published (merged): on the trunk its modules follow: merged there, and its walk opened — or nothing for a walk to move
  • 2026-10-07 23:42 published → delivered (done): nothing for a walk to move

The commit's note under refs/notes/mesh-plan keeps every transition: git log --notes=mesh-plan.

<!-- mesh-delivery:view --> **Delivery** `novox/mesh-lab@d0b0c7b02aad` — **delivered** since 2026-10-07T23:42:13Z **Delivery plan** — builds nothing: the change touches no module of the mesh's graph **Group** `replays/292-298`, in order: novox/mesh-controller@80f9d26e6d4c → novox/mesh-lab@d0b0c7b02aad - composed together: pass — every machine composes with the change as it did without (4 of 4 compose) **Transitions** - 2026-10-07 23:28 (new) → proposed (announced): novox/mesh-lab#60's head announced - 2026-10-07 23:28 proposed → checked (checked): the verdict names this commit - 2026-10-07 23:28 checked → ready (accepted): the gate passed or warned, and the repository's own check did not fail - 2026-10-07 23:42 ready → published (merged): on the trunk its modules follow: merged there, and its walk opened — or nothing for a walk to move - 2026-10-07 23:42 published → delivered (done): nothing for a walk to move The commit's note under `refs/notes/mesh-plan` keeps every transition: `git log --notes=mesh-plan`.
mesh-admin merged commit 35babebbd1 into main 2026-10-07 23:41:45 +00:00
mesh-admin deleted branch replays/292-298 2026-10-07 23:41:45 +00:00
Sign in to join this conversation.
No Reviewers
No labels
1 Participants
Notifications
Due Date
No due date set.
Dependencies

No dependencies set.

Reference: novox/mesh-lab#60