Adds R325 to the replays register for hq issue 325 (assign answered "no module of that name" a minute after the merge that asked for the module's build).
InRepository, mesh-controller, TestReplay325 in cmd/mesh-controller/replay325_test.go (novox/mesh-controller#150).
Fix 8adb7f1 (#150's head after its second review), Before fe00fec (the main it is rebased on). Set Before to "" and Fix to the merge once #150 merges, as for R310.
go run ./cmd/prove R325: PROVED, fails before with "no module of that name: sensors", passes on the fix.
Adds R325 to the replays register for hq issue 325 (assign answered "no module of that name" a minute after the merge that asked for the module's build).
- InRepository, mesh-controller, `TestReplay325` in `cmd/mesh-controller/replay325_test.go` (novox/mesh-controller#150).
- Fix `8adb7f1` (#150's head after its second review), Before `fe00fec` (the main it is rebased on). Set Before to "" and Fix to the merge once #150 merges, as for R310.
- `go run ./cmd/prove R325`: PROVED, fails before with "no module of that name: sensors", passes on the fix.
- `sh merge-check.sh`: exit 0.
Merge with or after novox/mesh-controller#150. Do not merge without the operator's approval.
hq issue 325: assign said no module of that name a minute after the merge
that asked for the module's build. Proved: fails on a759ac6, passes on b93dea8.
composed together: pass — every machine composes with the change as it did without (4 of 4 compose)
Transitions
2026-10-08 14:46 (new) → proposed (announced): novox/mesh-lab#68's head announced
2026-10-08 14:46 proposed → checked (checked): the verdict names this commit
2026-10-08 14:46 checked → ready (accepted): the gate passed or warned, and the repository's own check did not fail
2026-10-08 14:58 ready → published (merged): on the trunk its modules follow: merged there, and its walk opened — or nothing for a walk to move
2026-10-08 14:58 published → delivered (done): nothing for a walk to move
The commit's note under refs/notes/mesh-plan keeps every transition: git log --notes=mesh-plan.
<!-- mesh-delivery:view -->
**Delivery** `novox/mesh-lab@33e63ee5b47a` — **delivered** since 2026-10-08T14:58:34Z
**Delivery plan** — builds nothing: the change touches no module of the mesh's graph
**Group** `fix/assign-says-why-a-module-is-not-there`, in order: novox/mesh-controller@8adb7f1a0519 → novox/mesh-lab@33e63ee5b47a
- composed together: pass — every machine composes with the change as it did without (4 of 4 compose)
**Transitions**
- 2026-10-08 14:46 (new) → proposed (announced): novox/mesh-lab#68's head announced
- 2026-10-08 14:46 proposed → checked (checked): the verdict names this commit
- 2026-10-08 14:46 checked → ready (accepted): the gate passed or warned, and the repository's own check did not fail
- 2026-10-08 14:58 ready → published (merged): on the trunk its modules follow: merged there, and its walk opened — or nothing for a walk to move
- 2026-10-08 14:58 published → delivered (done): nothing for a walk to move
The commit's note under `refs/notes/mesh-plan` keeps every transition: `git log --notes=mesh-plan`.
Blocking a user prevents them from interacting with repositories, such as opening or commenting on pull requests or issues. Learn more about blocking a user.
Adds R325 to the replays register for hq issue 325 (assign answered "no module of that name" a minute after the merge that asked for the module's build).
TestReplay325incmd/mesh-controller/replay325_test.go(novox/mesh-controller#150).8adb7f1(#150's head after its second review), Beforefe00fec(the main it is rebased on). Set Before to "" and Fix to the merge once #150 merges, as for R310.go run ./cmd/prove R325: PROVED, fails before with "no module of that name: sensors", passes on the fix.sh merge-check.sh: exit 0.Merge with or after novox/mesh-controller#150. Do not merge without the operator's approval.
Delivery
novox/mesh-lab@33e63ee5b47a— delivered since 2026-10-08T14:58:34ZDelivery plan — builds nothing: the change touches no module of the mesh's graph
Group
fix/assign-says-why-a-module-is-not-there, in order: novox/mesh-controller@8adb7f1a05 → novox/mesh-lab@33e63ee5b4Transitions
The commit's note under
refs/notes/mesh-plankeeps every transition:git log --notes=mesh-plan.