Design 47 G, before G: the manifest takes G's version form (0.1) #7

Open
mesh-tools wants to merge 1 commits from feat/47-G-version-photos into nox-mesh
Member

Design 47 G's app manifest, merged before G alone (the operator, 2026-11-13: apps first, then G; the gate does not merge into nox-mesh, so it is merged with the forge tool once its own check passes). The manifest writes version as 0.1 (A-335). Replaces #6 (same head).

Reviewed-by: mesh-code-reviewer@shanks at 187f83259e

https://claude.ai/code/session_01NcbgfGKaxw984XyAPfLm4h

Design 47 G's app manifest, merged before G alone (the operator, 2026-11-13: apps first, then G; the gate does not merge into nox-mesh, so it is merged with the forge tool once its own check passes). The manifest writes `version` as `0.1` (A-335). Replaces #6 (same head). Reviewed-by: mesh-code-reviewer@shanks at 187f83259eff6eb992bd45db93ee5ae0c119d56c https://claude.ai/code/session_01NcbgfGKaxw984XyAPfLm4h
mesh-tools added 1 commit 2026-11-13 12:50:13 +00:00
Join G's version form: version 0.1
mesh/merge-gate waiting in the build queue since 08:56
mesh/delivery-group group feat/47-G-join11 checking: composed again for its members' new heads
mesh/delivery ready: it is merged on the Approve
187f83259e
No version is published for it (builder_versions answers none), so §583 gives 0.1.

Builds: design 47 G A-335, §583

Claude-Session: https://claude.ai/code/session_01NcbgfGKaxw984XyAPfLm4h
Author
Member

Delivery novox/photos@187f83259eff — ready since 2026-11-13T12:50:18Z

Transitions

  • 2026-11-13 12:50 (new) → proposed (announced): novox/photos#7's head announced; #6 with the same head closed unmerged
  • 2026-11-13 12:50 proposed → ready (accepted): a verdict names this commit and the trunk's head as its trunk commit, the gate passed or warned, and the repository's own check did not fail; or the check gates no merge (check-gates-merge false)

The commit's note under refs/notes/mesh-plan keeps every transition of this change up to its merge: git log --notes=mesh-plan.

<!-- mesh-delivery:view --> **Delivery** `novox/photos@187f83259eff` — **ready** since 2026-11-13T12:50:18Z **Transitions** - 2026-11-13 12:50 (new) → proposed (announced): novox/photos#7's head announced; #6 with the same head closed unmerged - 2026-11-13 12:50 proposed → ready (accepted): a verdict names this commit and the trunk's head as its trunk commit, the gate passed or warned, and the repository's own check did not fail; or the check gates no merge (check-gates-merge false) The commit's note under `refs/notes/mesh-plan` keeps every transition of this change up to its merge: `git log --notes=mesh-plan`.
Author
Member

mesh-delivery: not merged. This pull request is at 187f83259e (its check has no verdict yet), and it merges into nox-mesh. Only a merge into main is this owner's; a merge into another branch is its author's (novox/hq ADR 0398 §4).

mesh-delivery: **not merged.** This pull request is at 187f83259eff6eb992bd45db93ee5ae0c119d56c (its check has no verdict yet), and it merges into nox-mesh. Only a merge into main is this owner's; a merge into another branch is its author's (novox/hq ADR 0398 §4).
Some checks are pending
mesh/merge-gate waiting in the build queue since 08:56
mesh/delivery-group group feat/47-G-join11 checking: composed again for its members' new heads
mesh/delivery ready: it is merged on the Approve
You are not authorized to merge this pull request.
This pull request can be merged automatically.
View command line instructions

Checkout

From your project repository, check out a new branch and test the changes.
git fetch -u origin feat/47-G-version-photos:feat/47-G-version-photos
git checkout feat/47-G-version-photos
Sign in to join this conversation.
No Reviewers
1 Participants
Notifications
Due Date
No due date set.
Dependencies

No dependencies set.

Reference: novox/photos#7