Merge pull request 'Playbooks 07 and 08: the five rules from the delivery-time audit' (#375) from playbooks/07-08-time-sinks into main
Reviewed-on: #375
This commit was merged in pull request #375.
This commit is contained in:
@@ -434,6 +434,9 @@ planner, the rollout). **Downstream of** Module, Core, Health and repair and Dat
|
||||
- **delivery group** — two or more deliveries sharing a pull request head branch name across the mesh's
|
||||
repositories, delivered as one unit in an order declared (`after:`) or inferred by the planner. One
|
||||
level: a group holds deliveries, never groups. Its state is derived from its members, never set.
|
||||
- **release branch** — a branch other than `main`, shared by name across repositories, that collects a feature's
|
||||
merged work and is brought into `main` as one delivery (design 57's `feat/57-config-and-provisioning`). While it
|
||||
is in flight, a change that touches its files waits for it (playbook 07, *Is the coast clear?*).
|
||||
- **delivery plan** — what a delivery does to the mesh: its **build plan** (the modules it moves and
|
||||
their dependents, in tiers), its **deploy plan** (per node, what it receives and what waits for a
|
||||
person) and its verdict (the composed nodes, the replays). Computed by the controller's planner from a
|
||||
@@ -752,6 +755,7 @@ renaming one sense, the old sense moves to a *Not:* line and becomes mechanical.
|
||||
| release | a person letting a held delivery go on | **release** | Change and delivery |
|
||||
| | taking a consumer off a licence | **unbind** (verb `release`, to rename) | Identity and access |
|
||||
| | a copy of a work an engine can fetch | **media release** | Media |
|
||||
| | a branch brought into `main` as one delivery | **release branch** | Change and delivery |
|
||||
| gate | the judgement on a delivery's first node | **first-node gate** | Change and delivery |
|
||||
| | the pull request status | **merge gate** | Change and delivery |
|
||||
| | a failed step stopping its module's later steps (ADR 0136) | *a failed step holds its module* | Placement |
|
||||
|
||||
@@ -21,6 +21,16 @@ A small fix (one repository, one issue, about an hour of work) follows
|
||||
undelivered for a day: an issue done at 21:09 was still not on the machines at 15:00 the next day.
|
||||
- **Work that waits and nobody notices.** Most lost time was not work at all, but a check, a delivery plan
|
||||
or an agent waiting on something that had stopped, unseen.
|
||||
- **Review that keeps hardening.** One fix went through seven review rounds in five and a half hours, each
|
||||
asking for more hardening than its issue asked (issue 704, 2026-10-14). A round is for what makes the
|
||||
change wrong; everything else is an issue of its own.
|
||||
- **The first check after the whole branch is written.** A feature's catalogue branch, pushed once after
|
||||
hours of local work, met its first check on 2026-10-16 and failed on 29 problems, TypeScript errors among
|
||||
them, that a unit suite run continuously while working finds at once.
|
||||
- **A green pull request nobody marks.** An approved, green pull request that was not marked ready waited
|
||||
12 h 17 min for someone to merge it (mesh-catalog #300, 2026-10-14).
|
||||
- **A module proven only after it reached the machines.** The mail modules were delivered with unit tests
|
||||
only, then failed live three times (issues 859, 865, 868) and took five more hours of fixes.
|
||||
|
||||
## The shape
|
||||
|
||||
@@ -104,13 +114,40 @@ never into the running one, unless it blocks the running one.
|
||||
It says which round it is in ("round 1 of at most 3").
|
||||
3. **The report goes to the same fixing agents** that wrote the code, continued by their ids, so they fix
|
||||
with the context they already hold. Each answers the reviewer: what it changed, per finding, or why not.
|
||||
4. **The reviewer reads the answers and the new commits**, and approves or reports again. From round 2 it
|
||||
asks changes only for a finding that makes the feature wrong; smaller points become issues of their own.
|
||||
After round 3 the lead stops and brings the operator what is left, with a recommendation.
|
||||
4. **The reviewer reads the answers and the new commits**, and approves or reports again (step 5 says what a round
|
||||
may ask). After round 3 the lead stops and brings the operator what is left, with a recommendation.
|
||||
5. **A finding outside the issues' done-when is never a change asked, in any round.** More hardening, a
|
||||
further case, a nicer form: the reviewer opens it with `issue-tracker.open` and names the number in its
|
||||
report, and the round does not wait for it. What a round asks is only what makes the change wrong against
|
||||
its issues and its decisions.
|
||||
|
||||
## Is the coast clear?
|
||||
|
||||
Before the push of phase 3 (and of a small fix, playbook [08](08-small-fixes.md) step 5), the lead checks, for every
|
||||
repository the change touches, whether a **release branch** is in flight there: a branch other than `main` that
|
||||
collects a feature's merged work to bring it into `main` as one delivery.
|
||||
|
||||
1. **Look for one.** A pull request into `main` whose head is a release branch (`gitea.gitea_open_pulls`), a
|
||||
release branch holding merged work that `main` does not have yet (`git log origin/main..origin/<branch>`), or
|
||||
a delivery plan of that release branch still running (`mesh-controller.plans`).
|
||||
2. **Compare the files.** `git diff --name-only origin/main...origin/<release branch>` against the files the
|
||||
change touches.
|
||||
3. **Overlap: hold.** If the release branch touches a file the change touches, nothing is pushed into that repository
|
||||
until the release branch's delivery plan is done. Then the feature branch is brought up to the new `main`, the unit
|
||||
tests run again, and the push follows. The hold is on the wait list (its bound: the release branch's delivery plan),
|
||||
and is said to the operator with what the change waits for.
|
||||
4. **No overlap: go on.** A release branch in another repository, or one that shares no file with the change, does not
|
||||
hold it; its merge joins the merge window as any other (ADR 0276).
|
||||
|
||||
Merging beside a release branch still in flight would make its lead resolve someone else's conflicts in the
|
||||
middle of it, and could send part of the change with its delivery (2026-10-16: the file module's
|
||||
controller part touched four files feature 57's release branch also changed).
|
||||
|
||||
## Phase 3 — Check (no review)
|
||||
|
||||
1. **Push every feature branch and open one pull request per repository, together.** Pull requests in two or
|
||||
1. **Push every feature branch and open one pull request per repository, together, once the coast is clear**
|
||||
(above). The integration tests
|
||||
run only in the merge check (the operator, 2026-10-16), never before. Pull requests in two or
|
||||
more repositories that share the branch name are one delivery group (ADR 0239 §2).
|
||||
Where a session pushes through the forge tool `gitea_commit` (one commit on the forge's current base), the
|
||||
reviewer first confirms that commit's tree equals the reviewed one.
|
||||
@@ -118,8 +155,14 @@ never into the running one, unless it blocks the running one.
|
||||
second review: phase 2 reviewed this tree.
|
||||
3. **A check that fails** goes back to the reviewer with the failure, for **one more cycle** of phase 2 with
|
||||
the same fixing agents; then push once again.
|
||||
4. **Mark each pull request ready** (`mesh/ready` and a comment `ready at <full sha>`) once the operator's word
|
||||
for the feature is given; mesh-delivery merges it when its checks pass (ADR 0364).
|
||||
4. **The step's acceptance is proven before it is marked ready.** A step that adds or changes a module
|
||||
carries an integration test that starts the module whole, its process against the real bus and store, and
|
||||
shows the step's acceptance sentence; the forge's checks run it (ADR 0391 §1, §6). Unit tests alone are not
|
||||
that proof; the mesh has no end-to-end tests yet, and the lab is not used (the operator, 2026-10-16).
|
||||
5. **The reviewer marks each pull request ready as soon as the acceptance is shown** (`mesh/ready` and a
|
||||
comment `ready at <full sha>`, the head it approved); mesh-delivery merges it when its checks pass
|
||||
(ADR 0364). The operator's word is waited for only when the step changes what the operator sees, removes
|
||||
data, or needs a step only the operator's terminal can take; the lead says which before the step starts.
|
||||
|
||||
**One exception: a catalogue change that uses a new manifest word.** The catalogue's merge check reads
|
||||
manifests with the controller the mesh runs, so the controller's pull request is merged and delivered first;
|
||||
@@ -127,7 +170,8 @@ then `mesh-delivery.recheck` the catalogue's and merge it on the new verdict. Pl
|
||||
|
||||
## Phase 4 — Deliver
|
||||
|
||||
The merge starts the delivery plan: build, publish, send. The lead follows it to done
|
||||
The merge starts the delivery plan: build, publish, send. A merge into a branch other than `main` is not a
|
||||
delivery: no machine receives it (issue 889 while it still starts one). The lead follows it to done
|
||||
(`mesh-controller.plans` with `wait` and `until: done`), then resolves the feature's issues with `fixed-by`
|
||||
naming its pull requests, and removes what is left: no `feat/<slug>` branch and no `.work/<slug>` worktree
|
||||
survive.
|
||||
@@ -156,6 +200,8 @@ on, with when it started and its bound.
|
||||
| a fixing agent's issue | 30 minutes | ask it where it stands; split or take over |
|
||||
| the review | 15 minutes a round | ask the reviewer; stop at round 3 |
|
||||
| a merge check | 15 minutes | read the build queue (`mesh-controller.queue`) and the check's log |
|
||||
| the ready mark | 15 minutes after the acceptance is shown | the reviewer marks it, or the lead does |
|
||||
| a release branch in flight that shares files | its delivery plan done | report it every ten minutes; bring the branch up to `main` after |
|
||||
| a merge after ready | 5 minutes after the checks pass | read `mesh-delivery.show` for the delivery |
|
||||
| a delivery plan | its class's budget (`mesh-delivery.times`), at most 30 minutes | read `mesh-controller.plans`, then `mesh-delivery.stalled` |
|
||||
|
||||
@@ -200,6 +246,13 @@ lead prepares a `/clear` as the mesh's instruction "prepare before clear" says:
|
||||
feature's phase, its branches and heads, the context files' paths, the agents' ids, the wait list and the
|
||||
next action; then the prompt the operator pastes. The context files make the feature resumable after a clear.
|
||||
|
||||
## Issues that stop
|
||||
|
||||
An issue stays in `fixing` only while an agent works on it. A step that stops, for a wait past its bound, a
|
||||
hand-over, or the session's end, moves each of its issues not delivered back to `open` with
|
||||
`issue-tracker.move` and a note saying how far it got (its branch, its last commit, what is left). A list of
|
||||
issues in `fixing` that nobody works on reads to the operator as stuck work.
|
||||
|
||||
## How it is checked
|
||||
|
||||
- A feature's issues show their commits on the feature branch (`git log --grep 'issue <n>'`), and no pull
|
||||
@@ -209,6 +262,14 @@ next action; then the prompt the operator pastes. The context files make the fea
|
||||
- After a feature's delivery, `git branch -r | grep feat/<slug>` and `git worktree list` return nothing for it.
|
||||
- More than one open pull request in a repository that share no feature name, or a feature step whose issues
|
||||
stay in `fixing` for more than a working day, is the smell: stop and bring it to the operator.
|
||||
- A review report that asks a change outside the issues' done-when, or a fourth round, is the failure of the
|
||||
review rules; `issue-tracker.list` with `flag: abandoned` lists issues left in `fixing` with nobody on them.
|
||||
- A pull request reviewed and green but not marked ready for more than 15 minutes is a lead that did not
|
||||
mark it.
|
||||
- A pull request opened into a repository whose release branch was in flight and shared a file with it is the failure of
|
||||
*Is the coast clear?*; the lead's report names the check it made before the push.
|
||||
- A step that adds or changes a module marked ready with no integration test that starts the module whole is
|
||||
the failure of phase 3's fourth step.
|
||||
- A bed run from `.work/<slug>/mesh-lab` that fails naming a `.work/<slug>/<repo>/…` path it cannot find is a
|
||||
missing sibling worktree, not a mesh fault.
|
||||
|
||||
|
||||
@@ -31,22 +31,34 @@ one delivery**. Everything before the push is local and fast.
|
||||
Commit, naming the issue. For a playbook or design edit, run the repository's own checks (in hq,
|
||||
`sh merge-check.sh`).
|
||||
4. **One review of the local commit, before anything is pushed** (a reviewer that did not write it, larger
|
||||
model; at most 3 rounds, as playbook 07; from round 2 only what is wrong). The reviewer's findings go back to the same agent that wrote the fix, continued by
|
||||
model; at most 3 rounds, as playbook 07; from round 2 only what is wrong; a finding outside the issue's
|
||||
done-when is opened as an issue of its own, never asked as a change). The reviewer's findings go back to the same agent that wrote the fix, continued by
|
||||
its id, so the fix keeps its context. A playbook or design edit of a few lines may skip the reviewer: the
|
||||
operator's word on the pull request is its review.
|
||||
5. **Push once and open the pull request.** The forge's merge checks run the integration tests. A failed check
|
||||
operator's word on the pull request is its review, and the lead marks it ready on that word.
|
||||
5. **Push once and open the pull request, once the coast is clear** (playbook [07](07-feature-branches.md), *Is
|
||||
the coast clear?*: no release branch in flight in the repository that shares a file with the fix). The forge's merge
|
||||
check runs the integration tests, the only
|
||||
place they run (the operator, 2026-10-16). A failed check
|
||||
goes back to the same agent with the failure, and the reviewer reads only the change it makes.
|
||||
6. **Mark it ready** (`mesh/ready` and `ready at <full sha>`) once the operator's word is given; mesh-delivery
|
||||
merges it when its checks pass.
|
||||
6. **The reviewer marks it ready at once** (for an edit that skipped the reviewer, the lead, on the
|
||||
operator's word) (`mesh/ready` and `ready at <full sha>`, the head it approved);
|
||||
mesh-delivery merges it when its checks pass. A fix to a module that changes how it runs carries an
|
||||
integration test starting the module whole against the real bus and store, run by the forge's checks
|
||||
(ADR 0391 §1, §6); unit tests alone are not that proof, and the lab is not used. The operator's word is waited for only when the fix changes what the operator sees, removes data,
|
||||
or needs the operator's terminal.
|
||||
7. **Follow its delivery plan to done** (`mesh-controller.plans` with `wait` and `until: done`), prove the fix on
|
||||
the mesh (the symptom gone, measured), and resolve the issue with `located-in` and `fixed-by` the same hour.
|
||||
|
||||
A fix that stops before its delivery moves its issue back to `open` with a note saying how far it got
|
||||
(branch, last commit, what is left), as playbook [07](07-feature-branches.md) says.
|
||||
|
||||
## Bounds
|
||||
|
||||
| Waiting on | Bound | Past the bound |
|
||||
|---|---|---|
|
||||
| building the fix | 1 hour | it is a feature: stop and plan it under playbook 07 |
|
||||
| the review | 15 minutes | ask the reviewer where it stands |
|
||||
| the ready mark | 15 minutes after the review approved | the reviewer marks it, or the lead does |
|
||||
| the merge check | 15 minutes | read `mesh-controller.queue` and the check's log |
|
||||
| the merge after ready | 5 minutes after the checks pass | read `mesh-delivery.show` for the delivery |
|
||||
| the delivery plan | its class's budget (`mesh-delivery.times`), at most 30 minutes | read `mesh-controller.plans`, then `mesh-delivery.stalled` |
|
||||
@@ -63,3 +75,8 @@ reading itself and uses one subagent only for the review.
|
||||
- A small fix has one pull request with one or few commits naming its issue, opened after its review: a pull
|
||||
request with many heads is a fix reviewed after its push.
|
||||
- Its issue moves to `resolved` within the hour its delivery plan ends.
|
||||
- A pull request reviewed and green but unmarked
|
||||
for more than 15 minutes, a fix to a module's running marked ready with no integration test of the module whole, or a review report
|
||||
asking a change outside the issue's done-when, is the failure of steps 4 to 6.
|
||||
- An issue in `fixing` with nobody on it shows in `issue-tracker.list` with `flag: abandoned`; a stopped fix
|
||||
moves it back to `open` with its note.
|
||||
|
||||