Design 47 H2: H-A-635, a slow pass of the assigner says which phase it is in (issue 1984)

This commit is contained in:
2026-11-24 01:08:28 +01:00
parent d4eb197b49
commit 9246148808
@@ -561,3 +561,14 @@ where the design and the code disagree; the lead's answers follow, each against
where a package path's Go module requires a module of its own repository at the zero version, resolved only through
that path's module file, and its listing names that module's imports; live, the next pipeline whose movers hold
mesh-delivery-contracts passes its build. Principles 3 and 7.
- **H-A-635 (a slow pass of the assigner says which phase it is in, 01:08)** 24 Nov, issue 1984; answers the stall met
2026-11-23 23:53:48 UTC: the assigner on one machine logged "the pass took" (H-A-259) every 20 s, then nothing for six
minutes at near-zero CPU while every validate and composition step of a 70-mover pipeline waited; a read of its locks
found no cycle, and no tool takes a stuck process's stacks, so where it stood is not known. The pass names the phase it
is in as each starts (the assignments seat, the kept graph, the wants, the pass said, the puts, the node wants, the
backups and reverts), in the passer's own memory; a pass still running after the assigner setting
`pass-stall-seconds` (10 to 600, default 60) says once in the journal "the pass started at <time> is in <phase> for
<duration>", and again at each further bound until it ends; the end line stays as H-A-259 has it (principle 3: a part
that waits says where; principle 11: the bound is a setting; principle 7: a journal line in the passer, no new key or
event, since no other part acts on it). How it is checked: a unit row where a phase blocks past a short bound and the
journal line names that phase, and none is said for a pass that ends within it. Principles 3, 7 and 11.