Merge pull request 'Playbook 07: a design names its milestones' issues, never their delivery state' (#408) from fix/pb07-no-state-in-designs into main

This commit was merged in pull request #408.
This commit is contained in:
2026-10-17 16:23:52 +00:00
3 changed files with 17 additions and 14 deletions
+7 -4
View File
@@ -272,8 +272,10 @@ moments, the same hour, an hq change going through [playbook 08](08-small-fixes.
- **The first milestone starts:** the design's `status: in-progress` ([playbook 04](04-build-handoff.md) step 7),
if it is not already.
- **A milestone's delivery plan is done:** its issues are resolved (phase 4), and the design's milestone entry says
it is delivered, with the date.
- **A milestone's delivery plan is done:** its issues are resolved (phase 4), with `fixed-by` naming its pull
requests. The design's milestone entry is not changed: it names the milestone's issues, and whether they are
delivered, when and by what is read from the issue tracker when it is asked, never copied into the design
(issue 1038; AGENTS.md: cross-cutting views are generated when they are read).
- **The building pauses with work left** (another design takes its turn, a hand-over, the session's end): the
design stays `in-progress`, and each issue left gets a note with `issue-tracker.note` saying what it waits
for and what comes after it ("built after design N is delivered, before design M"). The first issue of
@@ -300,8 +302,9 @@ issues in `fixing` that nobody works on reads to the operator as stuck work.
- A design whose milestone issues are partly resolved says `in-progress`, and one whose issues are all
resolved and delivered says `implemented`: read its Milestones section against `issue-tracker.get` for each
issue. A design that says `designed` with a resolved milestone issue is a state not written back.
- A milestone whose issues are all resolved and delivered has the date in its entry in the design's Milestones
section; an entry without it is a delivery not written back.
- A design's Milestones section names each milestone's issues and nothing of their state: a "delivered", a date
or a pull request in an entry is a copy of the tracker's state (issue 1038), read with
`grep -n 'delivered' <design>` over its Milestones section.
- Every open issue of a design that says `in-progress` and has no agent on it shows, in `issue-tracker.get`, a
note saying what it waits for; one without such a note is a pause not written back.
- The milestone issues in `fixing` (`issue-tracker.list`) belong to one design at most: milestone issues
@@ -547,9 +547,9 @@ when the previous one's delivery is done.
| # | Outcome | Acceptance tests | Repositories | Issues |
|---|---|---|---|---|
| 1 | A merge during a running delivery is never dropped and needs no person's release; the merge window lives on the bus; a rollout that shares nothing with an open one runs beside it | 8, 9, 11 | mesh-controller | 973 (with the rest of 525); delivered 2026-10-17 (mesh-controller #366, #367) |
| 2 | A ready mark is acted on within seconds, and each pull request has at most one waiting check | 5, 6, 7 | mesh-controller, mesh-catalog (mesh-delivery, gitea) | 974, 975, 976; delivered 2026-10-17 in one plan (mesh-controller #368, mesh-catalog #345) |
| II | phase II: build-agent and route-proxy live whole in mesh-controller, in two releases under ADR 0420 (accepted 2026-10-17): release 1 has the controller accept a reviewed move and mesh-delivery announce each merge with its Approve; release 2 is the move | — | mesh-controller, mesh-catalog (mesh-delivery, build-agent, route-proxy) | release 1: 1025, delivered 2026-10-17 (mesh-controller #369, mesh-catalog #348); release 2: 1019 |
| 1 | A merge during a running delivery is never dropped and needs no person's release; the merge window lives on the bus; a rollout that shares nothing with an open one runs beside it | 8, 9, 11 | mesh-controller | 973 (with the rest of 525) |
| 2 | A ready mark is acted on within seconds, and each pull request has at most one waiting check | 5, 6, 7 | mesh-controller, mesh-catalog (mesh-delivery, gitea) | 974, 975, 976 |
| II | phase II: build-agent and route-proxy live whole in mesh-controller, in two releases under ADR 0420 (accepted 2026-10-17): release 1 has the controller accept a reviewed move and mesh-delivery announce each merge with its Approve; release 2 is the move | — | mesh-controller, mesh-catalog (mesh-delivery, build-agent, route-proxy) | release 1: 1025; release 2: 1019 |
| 3 | A feature with a new seat verb across the controller and the catalogue is one group, one batch, one delivery plan and one Approve: no order lines, no ready mark, each module built and sent once | 1, 6 | mesh-controller, mesh-catalog (mesh-delivery, gitea) | 977, 978, 1022; 605 (1021 closed as its duplicate) is resolved by this build (ADR 0419 §7) |
| 4 | A delivery backs up the data it moves first, and a failed backup holds it and is said | 3 | mesh-controller, mesh-catalog (mesh-delivery, the backup seat's holder) | 980 |
| 5 | One read of a module on a node names the commit, build and rollout that put it there | 10, 12 | mesh-controller, mesh-catalog (mesh-config, nats) | 981 |
@@ -339,14 +339,14 @@ retire the word (F4 left it off the *Not:* line for them), design 49 lists the C
## Milestones
Written back on 2026-10-17 (playbook 07, "The design's state is written back"): the packages above were built
as one delivery, not milestone by milestone, so the milestones are what was delivered and what is left.
The packages above were built as one delivery, not milestone by milestone; the milestones group them by what
each makes true. Whether a milestone's issues are delivered is read from the issue tracker (playbook 07).
| # | Outcome | Packages | Issues | State |
|---|---|---|---|---|
| 1 | Config, provisioning, secrets, bindings, collections and runtime asks run the new way; the old forms are still accepted | every package but T6, B3, R1, R2 | 647, 650 to 679 but 659, 681, 684, 685 | merged into main and delivered on 2026-10-16; issues resolved |
| 2 | The media catalogue and the applications carry their file text as templates | T6 | 659 | resolved; delivered on 2026-10-16 |
| 3 | The other providers answer their consumers; the old forms are refused; the record says what runs | B3, R1, R2 | 680, 682, 683 | open: built after design 47's milestones are delivered and before design 58 starts (the operator, 2026-10-17; one design is built at a time, playbook 07) |
| # | Outcome | Packages | Issues |
|---|---|---|---|
| 1 | Config, provisioning, secrets, bindings, collections and runtime asks run the new way; the old forms are still accepted | every package but T6, B3, R1, R2 | 647, 650 to 679 but 659, 681, 684, 685 |
| 2 | The media catalogue and the applications carry their file text as templates | T6 | 659 |
| 3 | The other providers answer their consumers; the old forms are refused; the record says what runs | B3, R1, R2 | 680, 682, 683 |