The operator, 2026-10-17: a milestone is finished whole, brought to main once and released once. Cutting it into steps for size or time adds a review, a merge check, an Approve and a delivery plan of waiting each time, so the fewest cuts is the fastest. Milestones are cut by release order when a design is broken up (playbook 04), so a milestone never needs a second release.
Playbook 07: the two-hour split into steps goes; one milestone is one release; the develop bound is the milestone's issues; the reporting layouts name the milestone.
Playbook 04: a milestone is one release; milestones are cut by release order (a new manifest word before the catalogue, an SDK change before its users, until design 47's milestones 3 and 6 lift those orders).
Design 47: its line that milestones 5 and 6 are split into steps now says each milestone is one release.
Checks: records, index, cycle and words pass locally.
The operator, 2026-10-17: a milestone is finished whole, brought to main once and released once. Cutting it into steps for size or time adds a review, a merge check, an Approve and a delivery plan of waiting each time, so the fewest cuts is the fastest. Milestones are cut by release order when a design is broken up (playbook 04), so a milestone never needs a second release.
- Playbook 07: the two-hour split into steps goes; one milestone is one release; the develop bound is the milestone's issues; the reporting layouts name the milestone.
- Playbook 04: a milestone is one release; milestones are cut by release order (a new manifest word before the catalogue, an SDK change before its users, until design 47's milestones 3 and 6 lift those orders).
- Design 47: its line that milestones 5 and 6 are split into steps now says each milestone is one release.
Checks: records, index, cycle and words pass locally.
Merge check at 1dafc359
Judged: head 1dafc359fe7c merged into trunk 0f63a73def93
mesh/merge-gate: FAIL — head 1dafc359fe does not merge cleanly into trunk 0f63a73def: in conflict 00-META/process/07-feature-branches.md
mesh/repo-check: FAIL — head 1dafc359fe does not merge cleanly into trunk 0f63a73def: in conflict 00-META/process/07-feature-branches.md
Run by the build seat on ace as build-1792237423564159183 (builds --log build-1792237423564159183).
head 1dafc359fe7c does not merge cleanly into trunk 0f63a73def93: in conflict 00-META/process/07-feature-branches.md
**Merge check** at `1dafc359`
Judged: head `1dafc359fe7c` merged into trunk `0f63a73def93`
- `mesh/merge-gate`: **FAIL** — head 1dafc359fe7c does not merge cleanly into trunk 0f63a73def93: in conflict 00-META/process/07-feature-branches.md
- `mesh/repo-check`: **FAIL** — head 1dafc359fe7c does not merge cleanly into trunk 0f63a73def93: in conflict 00-META/process/07-feature-branches.md
Run by the build seat on ace as `build-1792237423564159183` (`builds --log build-1792237423564159183`).
```
head 1dafc359fe7c does not merge cleanly into trunk 0f63a73def93: in conflict 00-META/process/07-feature-branches.md
```
Deliverynovox/hq@addbd74c3924 — delivered since 2026-10-17T11:50:35Z
Delivery plan — builds nothing: the change touches no module of the mesh's graph
Transitions
2026-10-17 11:47 (new) → proposed (announced): novox/hq#401's head announced
2026-10-17 11:48 proposed → checked (checked): a verdict names this commit and the trunk's head as its trunk commit
2026-10-17 11:48 checked → ready (accepted): the gate passed or warned, and the repository's own check did not fail
2026-10-17 11:50 ready → published (merged): on the trunk its modules follow: merged there, and its walk opened — or nothing for a walk to move
2026-10-17 11:50 published → delivered (done): nothing for a walk to move
The commit's note under refs/notes/mesh-plan keeps every transition: git log --notes=mesh-plan.
<!-- mesh-delivery:view -->
**Delivery** `novox/hq@addbd74c3924` — **delivered** since 2026-10-17T11:50:35Z
**Delivery plan** — builds nothing: the change touches no module of the mesh's graph
**Transitions**
- 2026-10-17 11:47 (new) → proposed (announced): novox/hq#401's head announced
- 2026-10-17 11:48 proposed → checked (checked): a verdict names this commit and the trunk's head as its trunk commit
- 2026-10-17 11:48 checked → ready (accepted): the gate passed or warned, and the repository's own check did not fail
- 2026-10-17 11:50 ready → published (merged): on the trunk its modules follow: merged there, and its walk opened — or nothing for a walk to move
- 2026-10-17 11:50 published → delivered (done): nothing for a walk to move
The commit's note under `refs/notes/mesh-plan` keeps every transition: `git log --notes=mesh-plan`.
Merge check at 4872ccdb
Judged: head 4872ccdb6b3b merged into trunk 0f63a73def93
mesh/merge-gate: FAIL — head 4872ccdb6b does not merge cleanly into trunk 0f63a73def: in conflict 00-META/process/04-build-handoff.md, 00-META/process/07-feature-branches.md
mesh/repo-check: FAIL — head 4872ccdb6b does not merge cleanly into trunk 0f63a73def: in conflict 00-META/process/04-build-handoff.md, 00-META/process/07-feature-branches.md
Run by the build seat on shanks as build-1792237516199255860 (builds --log build-1792237516199255860).
head 4872ccdb6b3b does not merge cleanly into trunk 0f63a73def93: in conflict 00-META/process/04-build-handoff.md, 00-META/process/07-feature-branches.md
**Merge check** at `4872ccdb`
Judged: head `4872ccdb6b3b` merged into trunk `0f63a73def93`
- `mesh/merge-gate`: **FAIL** — head 4872ccdb6b3b does not merge cleanly into trunk 0f63a73def93: in conflict 00-META/process/04-build-handoff.md, 00-META/process/07-feature-branches.md
- `mesh/repo-check`: **FAIL** — head 4872ccdb6b3b does not merge cleanly into trunk 0f63a73def93: in conflict 00-META/process/04-build-handoff.md, 00-META/process/07-feature-branches.md
Run by the build seat on shanks as `build-1792237516199255860` (`builds --log build-1792237516199255860`).
```
head 4872ccdb6b3b does not merge cleanly into trunk 0f63a73def93: in conflict 00-META/process/04-build-handoff.md, 00-META/process/07-feature-branches.md
```
Reviewed by review-events@shanks: Rebased onto main 0f63a73: playbooks 04 and 07 and design 47 say the one-release rule consistently, main's additions kept; no step or two-hour rule left; both checks pass. Marked through mesh-delivery.mark-ready (novox/hq issue 913).
ready at addbd74c3924eedf418c8df345a8634b2b2d7213
Reviewed by review-events@shanks: Rebased onto main 0f63a73: playbooks 04 and 07 and design 47 say the one-release rule consistently, main's additions kept; no step or two-hour rule left; both checks pass. Marked through mesh-delivery.mark-ready (novox/hq issue 913).
Blocking a user prevents them from interacting with repositories, such as opening or commenting on pull requests or issues. Learn more about blocking a user.
The operator, 2026-10-17: a milestone is finished whole, brought to main once and released once. Cutting it into steps for size or time adds a review, a merge check, an Approve and a delivery plan of waiting each time, so the fewest cuts is the fastest. Milestones are cut by release order when a design is broken up (playbook 04), so a milestone never needs a second release.
Checks: records, index, cycle and words pass locally.
Merge check at
1dafc359Judged: head
1dafc359fe7cmerged into trunk0f63a73def93mesh/merge-gate: FAIL — head1dafc359fedoes not merge cleanly into trunk0f63a73def: in conflict 00-META/process/07-feature-branches.mdmesh/repo-check: FAIL — head1dafc359fedoes not merge cleanly into trunk0f63a73def: in conflict 00-META/process/07-feature-branches.mdRun by the build seat on ace as
build-1792237423564159183(builds --log build-1792237423564159183).Delivery
novox/hq@addbd74c3924— delivered since 2026-10-17T11:50:35ZDelivery plan — builds nothing: the change touches no module of the mesh's graph
Transitions
The commit's note under
refs/notes/mesh-plankeeps every transition:git log --notes=mesh-plan.Merge check at
4872ccdbJudged: head
4872ccdb6b3bmerged into trunk0f63a73def93mesh/merge-gate: FAIL — head4872ccdb6bdoes not merge cleanly into trunk0f63a73def: in conflict 00-META/process/04-build-handoff.md, 00-META/process/07-feature-branches.mdmesh/repo-check: FAIL — head4872ccdb6bdoes not merge cleanly into trunk0f63a73def: in conflict 00-META/process/04-build-handoff.md, 00-META/process/07-feature-branches.mdRun by the build seat on shanks as
build-1792237516199255860(builds --log build-1792237516199255860).4872ccdb6btoaddbd74c39ready at
addbd74c39Reviewed by review-events@shanks: Rebased onto main
0f63a73: playbooks 04 and 07 and design 47 say the one-release rule consistently, main's additions kept; no step or two-hour rule left; both checks pass. Marked through mesh-delivery.mark-ready (novox/hq issue 913).