Phase 3 of to-be 45 built (mesh-controller #85, mesh-host #37). ADR 0231 records what building it decided: budgets counted in the controller's store, acts begun before they are made; a settle per healer; success only as the condition's clearing; spent budget → operator, urgent; a healer's send never moves a held build (ADR 0221); H4 on D6's new consumer-behind kind, only the controller's events consumer resettable; the report verb as an enqueued reconcile answered by the ordinary report; the mesh-wide brake (12/hour); S15 live; healer-acted.
To-be 45 amended: writers table row, S9/S15 rows, D3/D6, §6 report verb as built, §7 healer table as built, Phase 3 'Built 2026-10-06' with what is not yet (lab-mesh induced failures, the live week). Status stays in-progress.
Checks: records.py, index.py, cycle.py pass. Numbered 0231 because 0230 is taken by feat/retired-consumers.
Phase 3 of to-be 45 built (mesh-controller #85, mesh-host #37). ADR 0231 records what building it decided: budgets counted in the controller's store, acts begun before they are made; a settle per healer; success only as the condition's clearing; spent budget → operator, urgent; a healer's send never moves a held build (ADR 0221); H4 on D6's new `consumer-behind` kind, only the controller's events consumer resettable; the `report` verb as an enqueued reconcile answered by the ordinary report; the mesh-wide brake (12/hour); S15 live; `healer-acted`.
To-be 45 amended: writers table row, S9/S15 rows, D3/D6, §6 report verb as built, §7 healer table as built, Phase 3 'Built 2026-10-06' with what is not yet (lab-mesh induced failures, the live week). Status stays in-progress.
Checks: records.py, index.py, cycle.py pass. Numbered 0231 because 0230 is taken by `feat/retired-consumers`.
Phase 3 of to-be 45 was built: the details its section 7 left open are
decided in the record and the design says them as built — where budgets are
counted, the settle, what a healer may send, H4 on D6's consumer-behind, the
report verb's shape, the mesh-wide brake and S15.
Deliverynovox/hq@4cdee43f69bf — held since 2026-10-06T23:05:28Z
Held for a person: merged without a passing check: only a person decides that it goes on — mesh-delivery.release with why lets it go on.
Delivery plan — builds nothing: the change touches no module of the mesh's graph
Transitions
2026-10-06 23:05 (new) → proposed (announced): novox/hq#136 merged; its head was not heard by this owner, so it is made from the forge's word
2026-10-06 23:05 proposed → held (merged-unchecked): merged without a passing check — a verdict known with it is taken first: only a person decides that it goes on
The commit's note under refs/notes/mesh-plan keeps every transition: git log --notes=mesh-plan.
<!-- mesh-delivery:view -->
**Delivery** `novox/hq@4cdee43f69bf` — **held** since 2026-10-06T23:05:28Z
Held for a person: merged without a passing check: only a person decides that it goes on — `mesh-delivery.release` with why lets it go on.
**Delivery plan** — builds nothing: the change touches no module of the mesh's graph
**Transitions**
- 2026-10-06 23:05 (new) → proposed (announced): novox/hq#136 merged; its head was not heard by this owner, so it is made from the forge's word
- 2026-10-06 23:05 proposed → held (merged-unchecked): merged without a passing check — a verdict known with it is taken first: only a person decides that it goes on
The commit's note under `refs/notes/mesh-plan` keeps every transition: `git log --notes=mesh-plan`.
Blocking a user prevents them from interacting with repositories, such as opening or commenting on pull requests or issues. Learn more about blocking a user.
Phase 3 of to-be 45 built (mesh-controller #85, mesh-host #37). ADR 0231 records what building it decided: budgets counted in the controller's store, acts begun before they are made; a settle per healer; success only as the condition's clearing; spent budget → operator, urgent; a healer's send never moves a held build (ADR 0221); H4 on D6's new
consumer-behindkind, only the controller's events consumer resettable; thereportverb as an enqueued reconcile answered by the ordinary report; the mesh-wide brake (12/hour); S15 live;healer-acted.To-be 45 amended: writers table row, S9/S15 rows, D3/D6, §6 report verb as built, §7 healer table as built, Phase 3 'Built 2026-10-06' with what is not yet (lab-mesh induced failures, the live week). Status stays in-progress.
Checks: records.py, index.py, cycle.py pass. Numbered 0231 because 0230 is taken by
feat/retired-consumers.Delivery
novox/hq@4cdee43f69bf— held since 2026-10-06T23:05:28ZHeld for a person: merged without a passing check: only a person decides that it goes on —
mesh-delivery.releasewith why lets it go on.Delivery plan — builds nothing: the change touches no module of the mesh's graph
Transitions
The commit's note under
refs/notes/mesh-plankeeps every transition:git log --notes=mesh-plan.