Fills issue 331's fixed-by: (novox/mesh-host PR #57, the fix, merged as 824911d; novox/mesh-host PR #58, the replay's test; novox/mesh-lab PR #69, the registration) and replay: R331. R331 is proved: it fails on 824911d^1 and passes on 824911d.
Status stays located until mesh-controller.conditions shows the sensors condition on the laptop cleared after the node-engine with the fix reaches it. A separate PR will set it resolved.
merge-check.sh passes locally.
Fills issue 331's `fixed-by:` (novox/mesh-host PR #57, the fix, merged as 824911d; novox/mesh-host PR #58, the replay's test; novox/mesh-lab PR #69, the registration) and `replay: R331`. R331 is proved: it fails on 824911d^1 and passes on 824911d.
Status stays `located` until `mesh-controller.conditions` shows the sensors condition on the laptop cleared after the node-engine with the fix reaches it. A separate PR will set it `resolved`.
`merge-check.sh` passes locally.
Deliverynovox/hq@a97efa99f89e — delivered since 2026-10-08T15:17:46Z
Delivery plan — builds nothing: the change touches no module of the mesh's graph
Transitions
2026-10-08 15:11 (new) → proposed (announced): novox/hq#219's head announced
2026-10-08 15:12 proposed → checked (checked): the verdict names this commit
2026-10-08 15:12 checked → ready (accepted): the gate passed or warned, and the repository's own check did not fail
2026-10-08 15:17 ready → published (merged): on the trunk its modules follow: merged there, and its walk opened — or nothing for a walk to move
2026-10-08 15:17 published → delivered (done): nothing for a walk to move
The commit's note under refs/notes/mesh-plan keeps every transition: git log --notes=mesh-plan.
<!-- mesh-delivery:view -->
**Delivery** `novox/hq@a97efa99f89e` — **delivered** since 2026-10-08T15:17:46Z
**Delivery plan** — builds nothing: the change touches no module of the mesh's graph
**Transitions**
- 2026-10-08 15:11 (new) → proposed (announced): novox/hq#219's head announced
- 2026-10-08 15:12 proposed → checked (checked): the verdict names this commit
- 2026-10-08 15:12 checked → ready (accepted): the gate passed or warned, and the repository's own check did not fail
- 2026-10-08 15:17 ready → published (merged): on the trunk its modules follow: merged there, and its walk opened — or nothing for a walk to move
- 2026-10-08 15:17 published → delivered (done): nothing for a walk to move
The commit's note under `refs/notes/mesh-plan` keeps every transition: `git log --notes=mesh-plan`.
Blocking a user prevents them from interacting with repositories, such as opening or commenting on pull requests or issues. Learn more about blocking a user.
Fills issue 331's
fixed-by:(novox/mesh-host PR #57, the fix, merged as 824911d; novox/mesh-host PR #58, the replay's test; novox/mesh-lab PR #69, the registration) andreplay: R331. R331 is proved: it fails on 824911d^1 and passes on 824911d.Status stays
locateduntilmesh-controller.conditionsshows the sensors condition on the laptop cleared after the node-engine with the fix reaches it. A separate PR will set itresolved.merge-check.shpasses locally.Delivery
novox/hq@a97efa99f89e— delivered since 2026-10-08T15:17:46ZDelivery plan — builds nothing: the change touches no module of the mesh's graph
Transitions
The commit's note under
refs/notes/mesh-plankeeps every transition:git log --notes=mesh-plan.