Adds a reading-aid section to 03-DESIGN/01-to-be/08-connectivity.md, before What this removes:
a table placing each of the five contexts (private network, resolution, exposure, filtering, certificates), the bus and the uplink on an OSI layer;
the private network drawn as a layer 3 network carried at layer 4 of the underlay;
the hub shape of §1 (hub and anchor, a roaming laptop through the hub only, two home-servers at one site peered directly);
one tool call from a laptop to a home-server, wrapped layer by layer, and how far the hub unwraps it (to layer 7 for the bus, to layer 3 when it relays);
the machine's own network checks (ADR 0241) mapped onto layers, read from the bottom up.
No new decision record, by the operator's choice (2026-10-09). The section changes no intention: it decides nothing, states no rule, and every claim cites the section or record that decided it (ADR 0106, 0117, 0169, 0241). decisions: gains 0241 and 0117 because the section cites them; updated: moves to today.
Public-repository check: role names only, no node names, provider, addresses or ports; the diff was scanned for them.
Checks: sh merge-check.sh (records, index, cycle, words with the catalogue's list) passes on this head, which is on main's head.
Adds a reading-aid section to `03-DESIGN/01-to-be/08-connectivity.md`, before *What this removes*:
- a table placing each of the five contexts (private network, resolution, exposure, filtering, certificates), the bus and the uplink on an OSI layer;
- the private network drawn as a layer 3 network carried at layer 4 of the underlay;
- the hub shape of §1 (hub and anchor, a roaming laptop through the hub only, two home-servers at one site peered directly);
- one tool call from a laptop to a home-server, wrapped layer by layer, and how far the hub unwraps it (to layer 7 for the bus, to layer 3 when it relays);
- the machine's own network checks (ADR 0241) mapped onto layers, read from the bottom up.
**No new decision record, by the operator's choice (2026-10-09).** The section changes no intention: it decides nothing, states no rule, and every claim cites the section or record that decided it (ADR 0106, 0117, 0169, 0241). `decisions:` gains 0241 and 0117 because the section cites them; `updated:` moves to today.
Public-repository check: role names only, no node names, provider, addresses or ports; the diff was scanned for them.
Checks: `sh merge-check.sh` (records, index, cycle, words with the catalogue's list) passes on this head, which is on main's head.
Deliverynovox/hq@3c5edc387955 — delivered since 2026-10-14T21:15:04Z
Delivery plan — builds nothing: the change touches no module of the mesh's graph
Transitions
2026-10-14 21:13 (new) → proposed (announced): novox/hq#275's head announced
2026-10-14 21:14 proposed → checked (checked): a verdict names this commit and the trunk's head as its trunk commit
2026-10-14 21:14 checked → ready (accepted): the gate passed or warned, and the repository's own check did not fail
2026-10-14 21:15 ready → published (merged): on the trunk its modules follow: merged there, and its walk opened — or nothing for a walk to move
2026-10-14 21:15 published → delivered (done): nothing for a walk to move
The commit's note under refs/notes/mesh-plan keeps every transition: git log --notes=mesh-plan.
<!-- mesh-delivery:view -->
**Delivery** `novox/hq@3c5edc387955` — **delivered** since 2026-10-14T21:15:04Z
**Delivery plan** — builds nothing: the change touches no module of the mesh's graph
**Transitions**
- 2026-10-14 21:13 (new) → proposed (announced): novox/hq#275's head announced
- 2026-10-14 21:14 proposed → checked (checked): a verdict names this commit and the trunk's head as its trunk commit
- 2026-10-14 21:14 checked → ready (accepted): the gate passed or warned, and the repository's own check did not fail
- 2026-10-14 21:15 ready → published (merged): on the trunk its modules follow: merged there, and its walk opened — or nothing for a walk to move
- 2026-10-14 21:15 published → delivered (done): nothing for a walk to move
The commit's note under `refs/notes/mesh-plan` keeps every transition: `git log --notes=mesh-plan`.
Rework needed before merge (triage, 2026-10-11): it conflicts with today's main in 08-connectivity.md since the records left hq (#312). Rebase onto main and cite decisions in main's form: "ADR 0241" and "ADR 0117" in the frontmatter, plain "ADR NNNN" in prose instead of ../../02-DECISIONS/… links. The layers section is still wanted. Its green checks ran before #312 and are stale.
Rework needed before merge (triage, 2026-10-11): it conflicts with today's main in 08-connectivity.md since the records left hq (#312). Rebase onto main and cite decisions in main's form: "ADR 0241" and "ADR 0117" in the frontmatter, plain "ADR NNNN" in prose instead of ../../02-DECISIONS/… links. The layers section is still wanted. Its green checks ran before #312 and are stale.
Rebased onto main (frontmatter kept from main, ADR 0241 and ADR 0117 added, links to 02-DECISIONS files turned into ADR citations now that decisions live in the knowledge base). Independent review: APPROVE at this head; merge-check.sh passes.
ready at 3c5edc387955167c3744421df1092ff11133dbd6
Rebased onto main (frontmatter kept from main, ADR 0241 and ADR 0117 added, links to 02-DECISIONS files turned into ADR citations now that decisions live in the knowledge base). Independent review: APPROVE at this head; merge-check.sh passes.
Blocking a user prevents them from interacting with repositories, such as opening or commenting on pull requests or issues. Learn more about blocking a user.
Adds a reading-aid section to
03-DESIGN/01-to-be/08-connectivity.md, before What this removes:No new decision record, by the operator's choice (2026-10-09). The section changes no intention: it decides nothing, states no rule, and every claim cites the section or record that decided it (ADR 0106, 0117, 0169, 0241).
decisions:gains 0241 and 0117 because the section cites them;updated:moves to today.Public-repository check: role names only, no node names, provider, addresses or ports; the diff was scanned for them.
Checks:
sh merge-check.sh(records, index, cycle, words with the catalogue's list) passes on this head, which is on main's head.Delivery
novox/hq@3c5edc387955— delivered since 2026-10-14T21:15:04ZDelivery plan — builds nothing: the change touches no module of the mesh's graph
Transitions
The commit's note under
refs/notes/mesh-plankeeps every transition:git log --notes=mesh-plan.Rework needed before merge (triage, 2026-10-11): it conflicts with today's main in 08-connectivity.md since the records left hq (#312). Rebase onto main and cite decisions in main's form: "ADR 0241" and "ADR 0117" in the frontmatter, plain "ADR NNNN" in prose instead of ../../02-DECISIONS/… links. The layers section is still wanted. Its green checks ran before #312 and are stale.
b740ce9321to3c5edc3879ready at
3c5edc3879Rebased onto main (frontmatter kept from main, ADR 0241 and ADR 0117 added, links to 02-DECISIONS files turned into ADR citations now that decisions live in the knowledge base). Independent review: APPROVE at this head; merge-check.sh passes.