Issue 459. ADR 0299 was accepted by the knowledge base on 2026-10-11 (version 7); the operator chose option A.
This adds ADR 0299 to to-be 47's decisions and a new section, "A stop on a shared walk": what a group stop does, what happens to a merge that contains a stopped merge, what the walk's record says, the person's two ways, and what the stop does not hold back. The section on the merge window's ends, the failed member, the stop row and delivery-stop are amended to match.
Issue 459. ADR 0299 was accepted by the knowledge base on 2026-10-11 (version 7); the operator chose option A.
This adds ADR 0299 to to-be 47's decisions and a new section, "A stop on a shared walk": what a group stop does, what happens to a merge that contains a stopped merge, what the walk's record says, the person's two ways, and what the stop does not hold back. The section on the merge window's ends, the failed member, the `stop` row and `delivery-stop` are amended to match.
`merge-check.sh` passes (records, index, cycle, words).
composed together: pass — every machine composes with the change as it did without (4 of 4 compose)
Transitions
2026-10-11 19:16 (new) → proposed (announced): novox/hq#316's head announced
2026-10-11 19:17 proposed → checked (checked): the verdict names this commit
2026-10-11 19:17 checked → ready (accepted): the gate passed or warned, and the repository's own check did not fail
2026-10-11 19:32 ready → published (merged): on the trunk its modules follow: merged there, and its walk opened — or nothing for a walk to move
2026-10-11 19:32 published → delivered (done): nothing for a walk to move
The commit's note under refs/notes/mesh-plan keeps every transition: git log --notes=mesh-plan.
<!-- mesh-delivery:view -->
**Delivery** `novox/hq@ce67b65c1029` — **delivered** since 2026-10-11T19:32:00Z
**Delivery plan** — builds nothing: the change touches no module of the mesh's graph
**Group** `feat/459-a-stop-re-walks-the-others`, in order: novox/hq@ce67b65c1029 → novox/mesh-controller@0fb7de7ef8fb → novox/mesh-catalog@3d7f9a3e669f
- novox/mesh-controller@0fb7de7ef8fb before novox/mesh-catalog@3d7f9a3e669f: declared
- composed together: pass — every machine composes with the change as it did without (4 of 4 compose)
**Transitions**
- 2026-10-11 19:16 (new) → proposed (announced): novox/hq#316's head announced
- 2026-10-11 19:17 proposed → checked (checked): the verdict names this commit
- 2026-10-11 19:17 checked → ready (accepted): the gate passed or warned, and the repository's own check did not fail
- 2026-10-11 19:32 ready → published (merged): on the trunk its modules follow: merged there, and its walk opened — or nothing for a walk to move
- 2026-10-11 19:32 published → delivered (done): nothing for a walk to move
The commit's note under `refs/notes/mesh-plan` keeps every transition: `git log --notes=mesh-plan`.
Blocking a user prevents them from interacting with repositories, such as opening or commenting on pull requests or issues. Learn more about blocking a user.
Issue 459. ADR 0299 was accepted by the knowledge base on 2026-10-11 (version 7); the operator chose option A.
This adds ADR 0299 to to-be 47's decisions and a new section, "A stop on a shared walk": what a group stop does, what happens to a merge that contains a stopped merge, what the walk's record says, the person's two ways, and what the stop does not hold back. The section on the merge window's ends, the failed member, the
stoprow anddelivery-stopare amended to match.merge-check.shpasses (records, index, cycle, words).Delivery
novox/hq@ce67b65c1029— delivered since 2026-10-11T19:32:00ZDelivery plan — builds nothing: the change touches no module of the mesh's graph
Group
feat/459-a-stop-re-walks-the-others, in order: novox/hq@ce67b65c10 → novox/mesh-controller@0fb7de7ef8 → novox/mesh-catalog@3d7f9a3e66Transitions
The commit's note under
refs/notes/mesh-plankeeps every transition:git log --notes=mesh-plan.e1ae2c14f5toce67b65c10