Design 47: release 1-2 cut by the orders its prepare step found, with its new decisions and issues #425

Merged
mesh-tools merged 1 commits from docs/design-47-release-1-2-cuts into main 2026-10-18 18:36:19 +00:00
Member

Part of issue 1130 (design 47 rewritten as each release is prepared).

Release 1-2's prepare step on 2026-10-18 found three orders its cut hid: an SDK change still ships before its users (ADR 0429 §10), a new repository's first module registered only at the controller's terminal (ADR 0432, proposed), and the bus had no system account (ADR 0431, accepted). The operator chose at 18:52 to cut the release by them. This writes the cuts and their issues into the milestone's entry, adds ADR 0431 to the decisions, and names ADR 0433 (proposed) for release 2's gaps. No status is copied from the tracker.

A design edit of a few lines (playbook 08 step 4): the operator's Approve of its merge is its review. sh merge-check.sh passes.

Reviewed-by: operator's Approve (playbook 08 step 4) at 4a090df25a

Part of issue 1130 (design 47 rewritten as each release is prepared). Release 1-2's prepare step on 2026-10-18 found three orders its cut hid: an SDK change still ships before its users (ADR 0429 §10), a new repository's first module registered only at the controller's terminal (ADR 0432, proposed), and the bus had no system account (ADR 0431, accepted). The operator chose at 18:52 to cut the release by them. This writes the cuts and their issues into the milestone's entry, adds ADR 0431 to the decisions, and names ADR 0433 (proposed) for release 2's gaps. No status is copied from the tracker. A design edit of a few lines (playbook 08 step 4): the operator's Approve of its merge is its review. `sh merge-check.sh` passes. Reviewed-by: operator's Approve (playbook 08 step 4) at 4a090df25a6a16ef7b10a3b24ed8a4b046678b11
mesh-tools added 1 commit 2026-10-18 18:31:45 +00:00
Design 47: release 1-2 cut by the orders its prepare step found, with its new decisions and issues (issue 1130)
mesh/merge-gate head 4a090df25a6a merged into trunk ea7c831196b6 — pass: the change touches no module of the mesh's graph
mesh/repo-check head 4a090df25a6a merged into trunk ea7c831196b6 — pass: its merge-check.sh passed
mesh/delivery delivered
4a090df25a
Author
Member

Delivery novox/hq@4a090df25a6a — delivered since 2026-10-18T18:36:21Z

Delivery plan — builds nothing: the change touches no module of the mesh's graph

Transitions

  • 2026-10-18 18:31 (new) → proposed (announced): novox/hq#425's head announced
  • 2026-10-18 18:32 proposed → checked (checked): a verdict names this commit and the trunk's head as its trunk commit
  • 2026-10-18 18:32 checked → ready (accepted): the gate passed or warned, and the repository's own check did not fail
  • 2026-10-18 18:36 ready → published (merged): on the trunk its modules follow: merged there, and its walk opened — or nothing for a walk to move
  • 2026-10-18 18:36 published → delivered (done): nothing for a walk to move

The commit's note under refs/notes/mesh-plan keeps every transition: git log --notes=mesh-plan.

<!-- mesh-delivery:view --> **Delivery** `novox/hq@4a090df25a6a` — **delivered** since 2026-10-18T18:36:21Z **Delivery plan** — builds nothing: the change touches no module of the mesh's graph **Transitions** - 2026-10-18 18:31 (new) → proposed (announced): novox/hq#425's head announced - 2026-10-18 18:32 proposed → checked (checked): a verdict names this commit and the trunk's head as its trunk commit - 2026-10-18 18:32 checked → ready (accepted): the gate passed or warned, and the repository's own check did not fail - 2026-10-18 18:36 ready → published (merged): on the trunk its modules follow: merged there, and its walk opened — or nothing for a walk to move - 2026-10-18 18:36 published → delivered (done): nothing for a walk to move The commit's note under `refs/notes/mesh-plan` keeps every transition: `git log --notes=mesh-plan`.
mesh-tools merged commit a353ed21c0 into main 2026-10-18 18:36:19 +00:00
mesh-tools deleted branch docs/design-47-release-1-2-cuts 2026-10-18 18:36:19 +00:00
Sign in to join this conversation.
No Reviewers
1 Participants
Notifications
Due Date
No due date set.
Dependencies

No dependencies set.

Reference: novox/hq#425