ADR 0027 — the product is Novox Mesh, shortened to mesh internally. HAL was never chosen: it arrived with the dotfiles repository this grew out of, it is borrowed, and it is borrowed from the canonical untrustworthy machine intelligence, which is an odd flag for infrastructure trusted with credentials. Timing is the substance of the decision, not an aside — the skeleton is not built, so renaming costs a search and replace now and a migration later. Nox is an identity of Novox, and specifically the agent of the MESH rather than of a node. Nodes keep their own identities. Nox addresses them, and a human mostly talks to Nox — which makes it the concrete form of the mission's vision: state an intent, and the mesh works out which node holds the thing. It holds no private channel. The gap this opens is recorded: ADR 0012 binds every agent to a home node, and a mesh-scoped agent has none, so the model needs extending. ADR 0028 — HQ is company-scoped, novox/hq, with the mesh as its first product. Checked rather than assumed: the company organisation already holds live projects that the mesh builds and deploys, so they are tenants rather than peers, and the mesh is the ground they stand on. There is also company work outside the mesh already, which strengthens the case and means the eventual split is closer than "some day" — so each document's scope is fixed now, in a table, making that split mechanical instead of archaeological. The folders are deliberately not restructured yet. The skeleton takes the new vocabulary: mesh-host, mesh-substrate, mesh-control, mesh-surfaces, mesh-catalog. Substrate drops to four services now that identity is a hosted workload rather than a dependency. Research 009 opens the migration, with the reframing that lowers its risk: replace the control plane, do not move the workloads. Their data never moves, so it is re-declared rather than adopted — which keeps adoption out of scope, as the lab design requires. Self-hosting is the last phase, or a failed cutover takes away the means to fix it.
3.1 KiB
Process — overview
How work moves through HQ, and who may do what. Every other document in this folder is a playbook: trigger, who runs it, steps, outputs. Engineers and agents follow the same playbooks; agents must not act outside them.
The audiences
| Audience | Contract |
|---|---|
| Engineers | Read and write everything. HQ is the single source of truth for mission, research, design, decisions and issue diagnosis. |
| Agents | The same rights as engineers, exercised through these playbooks. |
| Anyone else | This repository is public and written for them, but it is not a support channel. Nothing here identifies the mesh it describes. |
The knowledge flow
idea ──► 01-RESEARCH ──► decision (02-DECISIONS/) ──► 03-DESIGN/01-to-be ──► built (code repo)
│ │ │
│ │ └─► 03-DESIGN/00-as-is once shipped
│ └────► abandoned (recorded, kept)
└─(small/obvious, still recorded in 02-DECISIONS)──────────► 03-DESIGN directly
symptom ──► 04-ISSUES ──► diagnosis ──► code-repo fix and/or design amendment
how-we-build.md ──► constitution sync ──► knowledge base ──► injected into design meetings
The two design layers
03-DESIGN holds two layers that are never mixed:
| Layer | What it is | Changes when |
|---|---|---|
00-as-is/ |
The mesh that exists today. Describes shipped behaviour, including behaviour nobody would choose again. | Something ships, or an as-is claim is found to be wrong. |
01-to-be/ |
The mesh being built toward. Every statement traceable to a record in 02-DECISIONS/. |
A decision is taken or amended. |
A to-be document that ships does not move. Its as-is counterpart is written or updated, the
to-be document's frontmatter goes to implemented, and both stand — one describing what runs,
the other recording what was intended. Deleting the intention loses the reasoning, which is
the expensive half.
The playbooks
| # | Playbook | Trigger |
|---|---|---|
| 01 | Research | An idea worth investigating before committing to design |
| 02 | Graduation & design change | Research concludes, or a design must change |
| 03 | Issues | Something is wrong — often with the owner unknown |
| 04 | Build handoff | A design is ready to be built |
| 05 | Constitution sync | how-we-build.md changed a rule the mesh enforces |
Status lives in frontmatter
Research overviews, design docs, issue reports and decision records each carry their status as
YAML frontmatter (schemas in the section READMEs and playbooks). There are no central status
files and no decision ledger. Every decision is a record in
02-DECISIONS — if it is worth recording it is worth a record, and if
it is not worth a record it is not recorded. Cross-cutting views, the decision index included,
are generated on demand by the hal-status skill and never written to disk.