Files
hq/03-DESIGN/01-to-be/00-work-breakdown.md
T
jschoubben 9ad0ec35e0 The conversion is done by hand, and that removes work from this plan
Recorded because it is load-bearing and was not written down: moving
from the current system to this one is a person at a command line, not a
migration program.

What that removes is larger than what it adds. Nothing in this plan
needs an importer, a translation layer, a compatibility shim, or a way
of keeping two systems agreeing while both are live — each of which
somebody would otherwise reasonably build, use once, and maintain for a
year.

It also settles what "safe" means for the system being retired: a fix to
it must be safe on its own, because there is no careful rollout to
sequence it into. A change needing three steps in the right order is a
change that will be half-applied. That reversed a certificate default I
had chosen this morning.
2026-08-31 19:46:21 +02:00

242 lines
13 KiB
Markdown

---
layer: to-be
status: designed
code: []
updated: 2026-08-31
decisions:
- 02-DECISIONS/0001-mesh-brokers-nodes-host-agents-think.md
- 02-DECISIONS/0005-the-node-host.md
- 02-DECISIONS/0009-modules-and-the-graph.md
- 02-DECISIONS/0016-the-lab.md
- 02-DECISIONS/0028-the-substrate-supplies-the-control-plane-and-nothing-else.md
---
# Work breakdown — replacing what provisions the mesh
*Rewritten 2026-08-31. The previous version planned a decomposition of the existing system in
place: extract contexts, convert modules to declared features, shrink its shared library. That is
not what is being done — a replacement is being built beside it, and the old plan's Phase 0 was
the only part that survived contact with it. So the document that was supposed to say what happens
next had been describing work on a system being retired.*
## The goal, in one sentence
**Modules move to the new mesh one at a time, until the old registry can be switched off.**
Everything below is ordered by what that requires. Nothing here is a rewrite of the old system;
its modules are the input.
## Phase 0 — a mesh that runs — **done**
Not *the code exists*. Twenty-two assertions on real machines in the lab, each confirmed to fail
when the behaviour is removed ([ADR 0016](../../02-DECISIONS/0016-the-lab.md),
[ADR 0017](../../02-DECISIONS/0017-a-test-defends-a-decision.md)).
| what is proven | |
|---|---|
| **a mesh comes into being** | a bare machine becomes one; others join with nothing but a token |
| **credentials** | delivered to both ends with the mesh holding neither; rotated so the old one stops working |
| **declarations survive reality** | a stopped machine is waited for; one that fell behind catches up unnamed; unassigning takes away exactly what it should; what the mesh says nothing about is left alone |
| **failure is legible** | a machine that cannot do what it was told is named, with why |
| **the mesh runs itself** | its own artifact store, and a builder that is a module the mesh assigns |
| **names and reachability** | internal names, wildcards under a machine, containers reaching other machines, certificates the mesh issued, filtering that matches exactly what was declared |
| **delivery** | a new commit reaches a machine already running the old one |
| **model access** | answered by a record, with a key the mesh cannot read |
**What Phase 0 does not prove, and it is the important sentence in this document:** every module
exercised above was written to test the mechanism. **No module from the existing system has ever
run on this.** The vocabulary was shaped by the things used to test it — the same fault as a
fixture agreeing with the code it checks
([`04-ISSUES/005`](../../04-ISSUES/005-pipeline-test-harness-unbuildable/00-report.md)), at the
scale of a design.
## Phase 1 — the vocabulary a real module needs
Found by taking real modules and asking what they would require. Each is a gap in what can be
*expressed*, not a defect in what is built.
| # | task | done when |
|---|---|---|
| ~~1.1~~ | ~~An **object-store provision**~~ — **done 2026-08-31**, and it needed no change to the mesh: see below | seven assertions against a real store |
| ~~1.2~~ | ~~**A session as a consumer of a licence**~~ — **done 2026-08-31**, and it also needed no change: see below | two sessions on one machine, different licences, each its own key |
| ~~1.3~~ | ~~A **network** shape, and ordering within a module~~ — **done 2026-08-31** | the shape is created and removed; ordering was already there, and is now asserted |
| 1.4 | **Public certificate issuance** | a name reachable from outside is served with a certificate from a public authority, obtained against a **staging** endpoint unless told otherwise ([`04-ISSUES/004`](../../04-ISSUES/004-certificate-issuance-targets-production/00-report.md)) |
**1.3 and 1.4 block later ones** and are listed now so they are not met as surprises. 1.3 is what
a mail system needs and nothing else so far does.
**Checkpoint:** each is demonstrated in the lab before the module needing it is attempted.
### 1.2, and the same surprise twice
**A binding is per module per machine, and the two sessions are two modules** — the same mechanism
in different context roots, and a context root is what a module delivers. So `(node, module)`
already names them apart, and nothing needed adding.
[`14-model-access.md`](14-model-access.md) had called per-module-per-machine *a step toward it and
not it*, which is true of a **worker** — many run on one machine from one module — and not true of
a session, of which there is one per node and one for the mesh.
### 1.3, and the first one that needed building
**Ordering was already there** — the apply loop sorts nothing, so a module says *this before that*
by writing it first. Untested until now, and the kind of property a later change breaks silently.
Worth separating from readiness: a container started is not a container ready, and nothing waits.
What needs something *usable* retries, which is what both provisioners do and is the better answer
anyway, because a dependency can restart long after everything was applied.
**The network was a real gap, and the first thing in Phase 1 that needed a decision.** Adding a
shape widens what a compromised control plane can express, so
[ADR 0029](../../02-DECISIONS/0029-a-network-is-a-shape-because-an-action-cannot-be-undone.md)
records why this one is worth it: an `action` could create a network and **nothing could ever
remove it**, because an action leaves no footprint the host can undo. The vocabulary is nine.
**Three tasks in a row that were already possible.** Both were written from the design rather than
from the code, which is the review's finding arriving in the plan: *a claim here is counted, not
reasoned.* The remaining Phase 1 items should be checked against the code before being started,
not after.
### 1.1, and what it turned out to be
*Done 2026-08-31. Worth recording because the task was not the one written down.*
**The control plane special-cases nothing.** `provides`, `requires`, `contributes` and `grants`
are name-agnostic — asking for a bucket needed no change to the mesh at all. What was missing was
a provider, and the last step where something on the machine turns a delivered secret into a key
that works. So "add an object-store provision" was never mesh work.
The provision is `s3-bucket`: a consumer's code is written against the S3 API and swapping one
store for another does not break it, so by
[ADR 0027](../../02-DECISIONS/0027-a-provision-names-what-the-consumer-is-coupled-to.md) the name
says the protocol. A database is the other case, and names the engine.
**One assertion here that a database does not need.** One PostgreSQL server holds separate
databases and the product enforces the boundary; one object store holds every bucket behind one
endpoint, so *a consumer cannot reach another consumer's bucket* is a policy somebody wrote — and
a policy granting everything would pass every other test. **What is asserted is what the policy
does not say.**
## Phase 2 — the first real module
| # | task | done when |
|---|---|---|
| 2.1 | Port an **object store** module | it runs on the new mesh, serves a bucket to another module, and its credential rotates |
| 2.2 | Run it beside the existing one | both exist; nothing depends on the new one yet |
| 2.3 | Move one dependent onto it | something real reads and writes through the new mesh's copy |
**Checkpoint, and it is a human one:** it runs for a week before anything else moves. The point of
going first is to find what Phase 1 missed, and a week is roughly how long that takes to show.
## Phase 3 — the modules that prove the shape
Each exercises something the first one does not.
| # | task | proves |
|---|---|---|
| 3.1 | An **identity provider** | a module that is itself a provider — the provides/requires chain, with consumers requiring it |
| 3.2 | A **forge** | a port claim against the machine's own daemon, and a module wanting both a database and an object store |
| 3.3 | A **mail system** | several containers as one module, a private network between them, and names that are not one-per-node |
**3.3 is the hardest thing in this document** and is deliberately last. If the declaration
language turns out to be insufficient, it says so here.
## The conversion is done by hand, and that is a decision
*2026-08-31.* **Moving from the current system to this one is a person at a command line, working
through it.** Not a migration program, not a converter, not a period of dual-writing.
**What that removes from this plan is larger than what it adds.** Nothing below needs an importer,
a translation layer, a compatibility shim, or a mechanism for keeping two systems agreeing while
both are live — and every one of those is a thing somebody would otherwise reasonably build, use
once, and maintain for a year. The modules are the input; a person reads what one does today and
writes what it declares tomorrow.
**It also changes what "safe" means for the system being retired.** A fix to it has to be safe on
its own, because there is no careful rollout to sequence it into: the thing is being switched off
by hand, not managed into retirement. A change needing three steps in the right order is a change
that will be half-applied.
**And it is why the checkpoints below are weeks rather than gates.** Nothing enforces the order —
a person does — so the value of the sequence is entirely in what each step teaches before the next
one starts.
## Phase 4 — switch the old registry off
| # | task | done when |
|---|---|---|
| 4.1 | Move the remainder, by hand, a module at a time | nothing is assigned in the old system that is not assigned in the new one |
| 4.2 | The old one authoritative for nothing | a change to any module goes through the new mesh only |
| 4.3 | Switch it off | it is stopped, and nothing notices |
**4.3 is a day's work and the phases above it are not.** Naming it as a phase is what stops it
being mistaken for the goal.
## Sequencing
- **1 before 2.** Attempting a module without the vocabulary it needs produces a workaround, and a
workaround in a manifest is a design decision taken by whoever was in a hurry.
- **2 before 3, with the week.** Moving three modules before running one is how three modules
acquire the same defect.
- **3.3 last.** It is the only one that may send work back into the declaration language.
- **4 cannot start early, and there is no partial credit.** A registry still authoritative for one
module is still running.
## How this list is kept true
*This section exists because the document it replaces was wrong for weeks and nothing said so.*
**A claim here is counted, not reasoned.** The review of 2026-08-31 found a bundle described as
carrying two images that carries three, a bootstrap described as needing six shapes that uses
four, and ten documents calling themselves `designed` while naming lab-proven code. Each was
produced by describing the system from its design instead of reading it.
**A phase is done when the lab says so**, and the lab keeps a receipt of when it last ran and
against which commits. A phase marked done here whose assertions have not run is a claim about the
past.
**What is not proven gets said.** Phase 0 is done and its limitation is written into it. A list
that records only progress becomes a list nobody believes.
## Rules of engagement
Unchanged from the previous version: they were about how work is done rather than what the work
is.
### Autonomous by default
Read anything, measure anything, query read-only. Create branches, write code and tests, run the
suites, and write or update documents here.
### Always stop and ask
- **destroying or overwriting data** — dropping a table, deleting a provision, rotating a live
credential, removing a module from a node
- **merging anything** — every merge is a human checkpoint, without exception
- **anything touching a machine outside the lab**, including a configuration change that restarts
something people are using
- **a decision the records do not already answer** — record the question rather than picking and
moving on
- **any change to [`00-META`](../../00-META/)** — it is stable by nature
### Definition of done for every task
1. tests written **and failing first**, then passing
2. typecheck clean in every package the change touches
3. the behaviour demonstrated **in the lab, on real machines** — not asserted
4. documents here updated if the task changed or answered anything recorded
5. delivered, and the **effect** verified — not that a pipeline was green
### Non-negotiables
- **Never edit mesh-managed files on disk.** Use the thing that owns the file.
- **Never write to a production database directly.** Migrations for schema, application code for
data.
- **Every schema change ships twice** — consolidated schema *and* an incremental migration.
- **Expand, then contract.** Add the new shape, migrate, verify, and only then remove the old one.
- **A green pipeline proves transport, not effect.**
## What "done" looks like
The old registry is off. Every module runs on the new mesh, declared rather than scripted. A
machine that fails says what it could not do. And the number of modules grows when the work does,
not when the platform needs somewhere to put something.