mesh/check checking 76e4ec4dc680 on 26908a89506f | novox/mesh-catalog#506 in group feat/1781-milestone-records
mesh-issues keeps each design's milestone in the state milestones (history 5), says milestone-set and
milestone-moved, and serves milestones, milestone-set and milestone-move. An issue's milestone is its own link
of kind milestone, so at most one milestone per issue is checked inside the issue's own write; kind commit
links a fixing commit. The triage links no milestone, pull request or commit. import with milestones=N seeds
a design's table once. mesh-knowledge's progress reads issue-tracker.milestones and its table parse is gone.
Squashed from four commits so the branch history does not carry a compiled bundle that was committed by
mistake (6 MB); the path is now in .gitignore.
mesh/check pass 87fe2c45cfed on 26908a89506f | carried from 27a7757b970e, hq 3a5c4c7c4d9c | unit 2091 run, 2327 kept, 6 skipped | integration 2112 run…
A resolved issue whose delivery is held or failed is stuck, one merged and not delivered
is moving; a row the tracker did not answer, an answer that does not read and linked
issues cut by the list's limit are said as warnings instead of passing silently.
mesh/check pass 24b244bc88dc on 27a7757b970e | carried from 6b6d5cba7195 | unit 2046 run, 2327 kept, 6 skipped | integration 2066 run, 2346 kept, 10 s…
car-hunter #2 was approved and its commit status then refused 403. Before the ask the
gate reads merge.writes for each repository it covers; where the merging account cannot
write, nothing is asked, the delivery waits on 'the forge account cannot write <repo>:
gitea_grant_write' and a condition is raised. gitea.repo.writable reads it again and
asks an approved, refused merge of it again.
A lead's five-minute report and 'is design 47 nearing its end' were joined by hand from
the design file, the tracker and the deliveries. One verb now works the state out
(ADR 0424 §1), minimal for every five minutes, detailed for the report's tree.
Milestones are read from the design's table until the tracker's milestone records
(issue 1781) are delivered.
car-hunter #2 was approved and its commit status refused 403: mesh-tools only read the
repositories of a user. It is now a write collaborator on each repository the indexer's
modules state names (watched over the bus: at the start and on each registration), read
back and said as gitea.repo.writable; the operator's other repositories stay read-only.
gitea_grant_write and gitea_unwritable_repos do and show it by hand; gitea_commit_statuses
answers merge.writes.
The knowledge base's progress verb reads a milestone's issues in one call and must say
when each last moved, and the issues linked to a record or a design; neither was
readable without one get per issue.
mesh-catalog #495 gave read on every repository to the tools' account alone. The build modules
fetch over ssh as nox-builder (the forge-account provider's builders account, ADR 0466 §3), so
ace's and g14's fetch of jschoubben/car-hunter and jschoubben/snake still failed; the machines'
agents (nox-agent, ADR 0410 §1) could not read them either.
- gitea: readall.ts grants every account of one list, meshAccounts in tools-account.ts (mesh-tools,
nox-builder, nox-agent; a Go test holds the two Go names to internal/forgeaccount's constants),
on the same start pass, forge events and tools. gitea_unreadable_repos answers per account and
names the accounts the forge does not hold yet; gitea_grant_read takes accounts as well as
repositories. An absent account is asked nothing; the start pass runs again ten minutes apart
until every account was there once.
- mesh-build-go, mesh-build-node, mesh-build-image: pin mesh-sdk ff81bdf8 (fix/fetch-reads-all),
whose forgekey.Said keeps git's words past the bare "error:" line: the mirror's line said only
"git -C: error:". Their own git reasons (ls-files, ls-remote, rev-parse, repack) go through it too.
Every RUN failed before it started: 'setup network: netavark: nftables error ... Could not process rule'. Reproduced on
shanks with buildah 1.45.2, a clean environment and a private XDG_RUNTIME_DIR; --network pasta builds, and reaches the
network from a RUN. The sysrq integration row now fails if the RUN never started.
A held half-merged group did not count as under way, so another group sharing a repository could start; asked
again with delivery_merge_again, each then waited on the other. Passes are now read from every approved,
undeclined Approve not merged whole (approvedMerges leaves out merged and refused members), and
delivery_merge_again is refused while passWaits names a pass, naming it. The forge's mergeable is also false
for a work in progress: said so.
buildah writes STEP lines on stdout and its error on stderr, so the last line of both hid every image build's cause.
mesh-build-image's reason is now stderr's last lines (600 bytes) with the exit status, and the journal gets both tails;
mesh-build-node keeps stderr's end and stdout's start apart; mesh-build-go's cause skips go build's '# package' line.
On 2026-10-26 13:40 group fix/734-lost-ask merged two of its three members: the forge answered mesh-delivery#73's
merge 405 "Please try again later", and in the seconds between, group feat/890-placement merged mesh-delivery#72,
so #73 then conflicted.
- mesh-delivery-gate: before any member is handed, every member is read for its required statuses, its head still
the approved one, and the forge's own mergeable (in conflict, or still being worked out); the forge's "no" is asked
again every 5 s for 2 minutes, then the group is held and said urgent with nothing merged.
- mesh-delivery-gate: an approved merge waits while another approved merge's pass is under way into a repository it
goes into (handed until merged whole, or stopped), whether or not mesh/check gates merges (it waits for a merge,
never for a check: ADR 0551).
- mesh-delivery-gate: tool delivery_merge_again asks a refused or held merge again on the operator's word.
- gitea: the merge asks again after the forge's 405 "Please try again later" (1 s, 2 s, 4 s), and a pull request
carries the forge's mergeable, which gitea_commit_statuses answers.
Change A rebuilds the three build modules, so their runtimes restart once; it
changes nothing else about their builds until change B gives them the share.
Review round 1: a cap per module let three build modules take three shares
of the node. The share is now one node value held by the node-engine's
yielding slice; each step divides it by every build slot of the node, from the
composer's words, or assumes every build seat at its own capacity without them.
The operator's desktop slows while it builds (shanks at 92%, the Go build
runtime at 1650% of 24 processors). The build modules declare cpu-cap
(default shanks=50,g14=50,ace=75), which the composer turns into the runtime's
quota at idle priority; each step's go, node and buildah commands get
GOMAXPROCS and UV_THREADPOOL_SIZE for their part of it, and the status tools
show the limits and what the kernel holds the runtime to.
mesh-build-node's integration tests read the Node toolchain installed only where the node holds node-build-node, and
skipped on ace: its package now declares node-build-node beside its tests; the integration digest names it, a node
lacking it leaves the package unmet for the checker to place, and declines a placed ask. Re-pins mesh-sdk feat/890-placement.