The catalogue's part of novox/hq ADR 0350 (one build per change), for issue 649.
after: novox/mesh-controller
What it does
§5: closed unmerged. When the forge says a pull request closed unmerged, the delivery owner settles its deliveries as before. It then asks the controller's new forget-checks verb to let go of what that pull request's checks built for its merge. The call is made outside the lock. A refusal is said as a refusal, never fatal; the build seat's holders let go of anything a week old on their own. module.json invokes seat:mesh-controller.forget-checks.
§4: per module, beside the walk.WalkModule.made is read from the controller's walk record ("reused from the check of owner/repo#n at head H (merged into trunk T): …" or "built: "). The delivery keeps it as walk.built per module, so show says it beside the walk's build.
Tests:TestAPullRequestClosedUnmergedLetsGoOfItsCheckBuilds and TestAWalksRecordSaysWhetherEachModuleWasReusedOrBuilt fail on main, where ForgetChecks and Made do not exist. The manifest test names the new invoke. go vet and go test -race pass for modules/mesh-delivery.
Order: after novox/mesh-controller#311. Merging this first does no harm. The invoke only grants a subject, and nothing serves that subject until the controller rolls out. Until then, a close is refused, the refusal is said, and the week's sweep lets go of the builds.
Issue 649. novox/hq ADR 0350.
The catalogue's part of novox/hq ADR 0350 (one build per change), for issue 649.
after: novox/mesh-controller
**What it does**
- **§5: closed unmerged.** When the forge says a pull request closed unmerged, the delivery owner settles its deliveries as before. It then asks the controller's new `forget-checks` verb to let go of what that pull request's checks built for its merge. The call is made outside the lock. A refusal is said as a refusal, never fatal; the build seat's holders let go of anything a week old on their own. `module.json` invokes `seat:mesh-controller.forget-checks`.
- **§4: per module, beside the walk.** `WalkModule.made` is read from the controller's walk record ("reused from the check of owner/repo#n at head H (merged into trunk T): …" or "built: <why>"). The delivery keeps it as `walk.built` per module, so `show` says it beside the walk's build.
**Tests:** `TestAPullRequestClosedUnmergedLetsGoOfItsCheckBuilds` and `TestAWalksRecordSaysWhetherEachModuleWasReusedOrBuilt` fail on main, where `ForgetChecks` and `Made` do not exist. The manifest test names the new invoke. `go vet` and `go test -race` pass for modules/mesh-delivery.
**Order:** after novox/mesh-controller#311. Merging this first does no harm. The invoke only grants a subject, and nothing serves that subject until the controller rolls out. Until then, a close is refused, the refusal is said, and the week's sweep lets go of the builds.
Issue 649. novox/hq ADR 0350.
mesh/merge-gate head 66d22dd53eff merged into trunk 7ed119995f69 — pass: builds mesh-delivery → novox; no bus step; every machine composes with the change …
mesh/repo-check head 66d22dd53eff merged into trunk 7ed119995f69 — pass: its merge-check.sh passed, each part in its toolchain: merge-check.sh (go), merge-…
A check's builds for its merge have no taker once the pull request closes
unmerged, and the delivery should say whether a module was reused from the
check or built, and why (novox/hq ADR 0350 §4, §5).
composed together: pass — every machine composes with the change as it did without (4 of 4 compose)
Machines
mesh-controller on novox: passed — healthy 1 times over 1m44s, by the controller's rule: one reading once it is ready, after the node-engine's witness window (novox/hq ADR 0351)
mesh-controller on the rest running it: sent
build-agent on ace: passed — healthy 1 times over 33s, by a leaf module's rule: one reading (novox/hq ADR 0304)
build-agent on the rest running it: sent
mesh-delivery on novox: passed — healthy 1 times over 24s, by mesh-delivery's rule: one reading (novox/hq ADR 0351)
mesh-delivery on the rest running it: sent
Transitions
2026-10-13 21:05 (new) → proposed (announced): novox/mesh-catalog#282's head announced
2026-10-13 21:08 proposed → checked (checked): a verdict names this commit and the trunk's head as its trunk commit
2026-10-13 21:08 checked → ready (accepted): the gate passed or warned, and the repository's own check did not fail
2026-10-13 21:32 ready → published (merged): on the trunk its modules follow: merged there, and its walk opened — or nothing for a walk to move
2026-10-13 21:32 published → delivering (go): its walk started: let go by this owner in its group's order, by a person, or on the controller's own path — not a failed walk that carried a later commit for it, after which it waits for a walk of its own commit
2026-10-13 21:38 delivering → delivered (done): its walk is done, carrying its own commit: every machine of its deploy plan passed, or was left as its policy says
The commit's note under refs/notes/mesh-plan keeps every transition: git log --notes=mesh-plan.
<!-- mesh-delivery:view -->
**Delivery** `novox/mesh-catalog@66d22dd53eff` — **delivered** since 2026-10-13T21:38:45Z
**Delivery plan** — builds mesh-delivery → novox; no bus step
- tier 0: mesh-delivery
- novox: receives mesh-delivery
**Group** `feat/350-one-build-per-change`, in order: novox/mesh-controller@5c606fd1d48b → novox/mesh-catalog@66d22dd53eff
- novox/mesh-controller@5c606fd1d48b before novox/mesh-catalog@66d22dd53eff: declared
- composed together: pass — every machine composes with the change as it did without (4 of 4 compose)
**Machines**
- mesh-controller on novox: passed — healthy 1 times over 1m44s, by the controller's rule: one reading once it is ready, after the node-engine's witness window (novox/hq ADR 0351)
- mesh-controller on the rest running it: sent
- build-agent on ace: passed — healthy 1 times over 33s, by a leaf module's rule: one reading (novox/hq ADR 0304)
- build-agent on the rest running it: sent
- mesh-delivery on novox: passed — healthy 1 times over 24s, by mesh-delivery's rule: one reading (novox/hq ADR 0351)
- mesh-delivery on the rest running it: sent
**Transitions**
- 2026-10-13 21:05 (new) → proposed (announced): novox/mesh-catalog#282's head announced
- 2026-10-13 21:08 proposed → checked (checked): a verdict names this commit and the trunk's head as its trunk commit
- 2026-10-13 21:08 checked → ready (accepted): the gate passed or warned, and the repository's own check did not fail
- 2026-10-13 21:32 ready → published (merged): on the trunk its modules follow: merged there, and its walk opened — or nothing for a walk to move
- 2026-10-13 21:32 published → delivering (go): its walk started: let go by this owner in its group's order, by a person, or on the controller's own path — not a failed walk that carried a later commit for it, after which it waits for a walk of its own commit
- 2026-10-13 21:38 delivering → delivered (done): its walk is done, carrying its own commit: every machine of its deploy plan passed, or was left as its policy says
The commit's note under `refs/notes/mesh-plan` keeps every transition: `git log --notes=mesh-plan`.
Merge check at 66d22dd5
Judged: head 66d22dd53eff merged into trunk 7ed119995f69; read beside it: mesh-controller bff5b7f0e4f8, mesh-controller-main bff5b7f0e4f8, mesh-host 0e92ef3d1b21, mesh-tools 954e1a53eef9
mesh/merge-gate: PASS — every machine composes with the change as it did without (4 of 4 compose) (modules: mesh-delivery)
mesh/repo-check: PASS — its merge-check.sh passed, each part in its toolchain: merge-check.sh (go), merge-check-typescript.sh (typescript)
Delivery plan — builds mesh-delivery → novox; no bus step
tier 0: mesh-delivery
novox: receives mesh-delivery
read by no module's build: modules/mesh-delivery/cmd/mesh-delivery/adr350_test.go, modules/mesh-delivery/cmd/mesh-delivery/fakes_test.go, modules/mesh-delivery/cmd/mesh-delivery/manifest_test.go
Run by the build seat on novox as build-1791925532351512442 (builds --log build-1791925532351512442).
--- the gate: mesh-delivery
mesh-delivery: ok, 1 tool(s), invokes seat:mesh-controller.delivery-plan, seat:mesh-controller.delivery-order, seat:mesh-controller.delivery-check, seat:mesh-controller.deliver, seat:mesh-controller.delivery-stop, seat:mesh-controller.delivery-walks, seat:mesh-controller.forget-checks, gitea.gitea_note_append, gitea.gitea_delivery_view, gitea.gitea_commit_status, gitea.gitea_commit_statuses, gitea.gitea_contains, gitea.gitea_open_pulls, keeps state deliveries, groups
long-running resources without health: 0
files asking for a setting without saying whether it is trusted: 0
1 manifest(s) checked. Judged against the seats this binary carries; a claim on one of the mesh's own seats is judged fully at registration, and a seat declared by a module not given here reads as unknown. Identities judged on a 6-character machine name, against the bounds of the providers given here
judging 1 module(s) changed against 4 machine(s), as the snapshot of 2026-10-13T20:17:05Z says they run
composing every machine as the mesh is
the bus's user list leaves out 5 user(s) the mesh has minted no credential for: controller, node.f35, node.idt, node.ygcyr, node.yvbpsm. Each is a user that cannot connect until one is issued
the bus's user list leaves out 5 user(s) the mesh has minted no credential for: controller, node.f35, node.idt, node.ygcyr, node.yvbpsm. Each is a user that cannot connect until one is issued
composing every machine with the change
the bus's user list leaves out 5 user(s) the mesh has minted no credential for: controller, node.f35, node.idt, node.ygcyr, node.yvbpsm. Each is a user that cannot connect until one is issued
the bus's user list leaves out 5 user(s) the mesh has minted no credential for: controller, node.f35, node.idt, node.ygcyr, node.yvbpsm. Each is a user that cannot connect until one is issued
merge gate: PASS — every machine composes with the change as it did without (4 of 4 compose)
judged by controller development build against the facts of 2026-10-13T20:17:05Z
modules the change moves:
- mesh-delivery (changed)
machines:
- a machine (f35): composes
- holds mesh-dns-resolver (idt): composes
- holds git, holds mesh-artifact-store, holds mesh-broker, holds mesh-catalog, holds mesh-delivery, holds mesh-dns-resolver, holds mesh-store, holds mesh-vault, holds npm-package-registry, the control node, the hub (ygcyr): composes
- a machine (yvbpsm): composes
a merge would rebuild 1 module(s) in 1 tier(s): mesh-delivery
notes:
- modules/mesh-delivery/cmd/mesh-delivery/adr350_test.go, modules/mesh-delivery/cmd/mesh-delivery/fakes_test.go and modules/mesh-delivery/cmd/mesh-delivery/manifest_test.go read by no module's build, and rebuild nothing (issue 280)
--- its merge-check.sh (go toolchain)
ok git.novox.be/novox/mesh-catalog/checks/words 0.003s
words: 12 retired words and 70 daemons' lines, none in the 46786 strings of 718 files
ok git.novox.be/novox/mesh-catalog/checks/agenthome 0.014s
agent-home: no archive and no file written into under the agent's home
ok git.novox.be/novox/mesh-catalog/checks/secrets 0.013s
secrets: no setting can replace a vault secret in a mergeable file (1 known, nested)
ok git.novox.be/novox/mesh-catalog/checks/paths 0.007s
paths: no module names another's state on its machine (3 known, listed to go)
long-running resources without health: 66, as kept
ok git.novox.be/novox/mesh-catalog/checks/deps 0.366s
testing modules/mesh-delivery
ok mesh-delivery/cmd/mesh-delivery 3.324s
--- its merge-check-typescript.sh (typescript toolchain)
**Merge check** at `66d22dd5`
Judged: head `66d22dd53eff` merged into trunk `7ed119995f69`; read beside it: mesh-controller `bff5b7f0e4f8`, mesh-controller-main `bff5b7f0e4f8`, mesh-host `0e92ef3d1b21`, mesh-tools `954e1a53eef9`
- `mesh/merge-gate`: **PASS** — every machine composes with the change as it did without (4 of 4 compose) (modules: mesh-delivery)
- `mesh/repo-check`: **PASS** — its merge-check.sh passed, each part in its toolchain: merge-check.sh (go), merge-check-typescript.sh (typescript)
**Delivery plan** — builds mesh-delivery → novox; no bus step
- tier 0: mesh-delivery
- novox: receives mesh-delivery
- read by no module's build: modules/mesh-delivery/cmd/mesh-delivery/adr350_test.go, modules/mesh-delivery/cmd/mesh-delivery/fakes_test.go, modules/mesh-delivery/cmd/mesh-delivery/manifest_test.go
Run by the build seat on novox as `build-1791925532351512442` (`builds --log build-1791925532351512442`).
```
--- the gate: mesh-delivery
mesh-delivery: ok, 1 tool(s), invokes seat:mesh-controller.delivery-plan, seat:mesh-controller.delivery-order, seat:mesh-controller.delivery-check, seat:mesh-controller.deliver, seat:mesh-controller.delivery-stop, seat:mesh-controller.delivery-walks, seat:mesh-controller.forget-checks, gitea.gitea_note_append, gitea.gitea_delivery_view, gitea.gitea_commit_status, gitea.gitea_commit_statuses, gitea.gitea_contains, gitea.gitea_open_pulls, keeps state deliveries, groups
long-running resources without health: 0
files asking for a setting without saying whether it is trusted: 0
1 manifest(s) checked. Judged against the seats this binary carries; a claim on one of the mesh's own seats is judged fully at registration, and a seat declared by a module not given here reads as unknown. Identities judged on a 6-character machine name, against the bounds of the providers given here
judging 1 module(s) changed against 4 machine(s), as the snapshot of 2026-10-13T20:17:05Z says they run
composing every machine as the mesh is
the bus's user list leaves out 5 user(s) the mesh has minted no credential for: controller, node.f35, node.idt, node.ygcyr, node.yvbpsm. Each is a user that cannot connect until one is issued
the bus's user list leaves out 5 user(s) the mesh has minted no credential for: controller, node.f35, node.idt, node.ygcyr, node.yvbpsm. Each is a user that cannot connect until one is issued
composing every machine with the change
the bus's user list leaves out 5 user(s) the mesh has minted no credential for: controller, node.f35, node.idt, node.ygcyr, node.yvbpsm. Each is a user that cannot connect until one is issued
the bus's user list leaves out 5 user(s) the mesh has minted no credential for: controller, node.f35, node.idt, node.ygcyr, node.yvbpsm. Each is a user that cannot connect until one is issued
merge gate: PASS — every machine composes with the change as it did without (4 of 4 compose)
judged by controller development build against the facts of 2026-10-13T20:17:05Z
modules the change moves:
- mesh-delivery (changed)
machines:
- a machine (f35): composes
- holds mesh-dns-resolver (idt): composes
- holds git, holds mesh-artifact-store, holds mesh-broker, holds mesh-catalog, holds mesh-delivery, holds mesh-dns-resolver, holds mesh-store, holds mesh-vault, holds npm-package-registry, the control node, the hub (ygcyr): composes
- a machine (yvbpsm): composes
a merge would rebuild 1 module(s) in 1 tier(s): mesh-delivery
notes:
- modules/mesh-delivery/cmd/mesh-delivery/adr350_test.go, modules/mesh-delivery/cmd/mesh-delivery/fakes_test.go and modules/mesh-delivery/cmd/mesh-delivery/manifest_test.go read by no module's build, and rebuild nothing (issue 280)
--- its merge-check.sh (go toolchain)
ok git.novox.be/novox/mesh-catalog/checks/words 0.003s
words: 12 retired words and 70 daemons' lines, none in the 46786 strings of 718 files
ok git.novox.be/novox/mesh-catalog/checks/agenthome 0.014s
agent-home: no archive and no file written into under the agent's home
ok git.novox.be/novox/mesh-catalog/checks/secrets 0.013s
secrets: no setting can replace a vault secret in a mergeable file (1 known, nested)
ok git.novox.be/novox/mesh-catalog/checks/paths 0.007s
paths: no module names another's state on its machine (3 known, listed to go)
long-running resources without health: 66, as kept
ok git.novox.be/novox/mesh-catalog/checks/deps 0.366s
testing modules/mesh-delivery
ok mesh-delivery/cmd/mesh-delivery 3.324s
--- its merge-check-typescript.sh (typescript toolchain)
```
Blocking a user prevents them from interacting with repositories, such as opening or commenting on pull requests or issues. Learn more about blocking a user.
The catalogue's part of novox/hq ADR 0350 (one build per change), for issue 649.
after: novox/mesh-controller
What it does
forget-checksverb to let go of what that pull request's checks built for its merge. The call is made outside the lock. A refusal is said as a refusal, never fatal; the build seat's holders let go of anything a week old on their own.module.jsoninvokesseat:mesh-controller.forget-checks.WalkModule.madeis read from the controller's walk record ("reused from the check of owner/repo#n at head H (merged into trunk T): …" or "built: "). The delivery keeps it aswalk.builtper module, soshowsays it beside the walk's build.Tests:
TestAPullRequestClosedUnmergedLetsGoOfItsCheckBuildsandTestAWalksRecordSaysWhetherEachModuleWasReusedOrBuiltfail on main, whereForgetChecksandMadedo not exist. The manifest test names the new invoke.go vetandgo test -racepass for modules/mesh-delivery.Order: after novox/mesh-controller#311. Merging this first does no harm. The invoke only grants a subject, and nothing serves that subject until the controller rolls out. Until then, a close is refused, the refusal is said, and the week's sweep lets go of the builds.
Issue 649. novox/hq ADR 0350.
Delivery
novox/mesh-catalog@66d22dd53eff— delivered since 2026-10-13T21:38:45ZDelivery plan — builds mesh-delivery → novox; no bus step
Group
feat/350-one-build-per-change, in order: novox/mesh-controller@5c606fd1d4 → novox/mesh-catalog@66d22dd53eMachines
Transitions
The commit's note under
refs/notes/mesh-plankeeps every transition:git log --notes=mesh-plan.Merge check at
66d22dd5Judged: head
66d22dd53effmerged into trunk7ed119995f69; read beside it: mesh-controllerbff5b7f0e4f8, mesh-controller-mainbff5b7f0e4f8, mesh-host0e92ef3d1b21, mesh-tools954e1a53eef9mesh/merge-gate: PASS — every machine composes with the change as it did without (4 of 4 compose) (modules: mesh-delivery)mesh/repo-check: PASS — its merge-check.sh passed, each part in its toolchain: merge-check.sh (go), merge-check-typescript.sh (typescript)Delivery plan — builds mesh-delivery → novox; no bus step
Run by the build seat on novox as
build-1791925532351512442(builds --log build-1791925532351512442).