mesh/merge-gate pass: builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step; every machine composes with the change as it…
A seat's verb names the shell commands it is the mesh's way to do, and a module says it for its own
tools in its manifest; the tools verb and module list --json carry both, for the mesh MCP server's
search, the agent's instructions and the guard on its shell.
mesh/merge-gate pass: builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step; every machine composes with the change as it…
failed was required, so the controller refused the systemd module running
today and the module serving it was refused by the controller running
today: neither could land first. It is now optional (Verb.Optional, #117).
Two things kept either change from reaching a mesh whose seat rows already
exist: re-seeding added a verb but never an argument to one, and the
console refuses an argument the row does not name, so the journal window
would stay unreachable; and the optional mark is never stored, so a verb
seeded into a row came back required. A row's verb now gains the arguments
the binary names, and the working set takes the optional mark from the
compiled seat, which also keeps mesh-delivery's checks optional once seeded.
mesh/merge-gate pass: builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step; every machine composes with the change as it…
What the mesh's checks said of a pull request had no verb: the verdict was read from this
controller's journal. mesh-delivery answers it as checks. A verb added to a mesh seat whose holder
lives in another repository deadlocked: this controller would refuse the holder that does not serve
it, the one before it the holder that does, and every catalogue check between the two would fail on
mesh-delivery. So a verb can be marked optional — served or not, the holder holds — until every
holder serves it.
mesh/merge-gate pass: builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step; every machine composes with the change as it…
mesh/merge-gate pass: builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step; every machine composes with the change as it…
A plan's gated send for mail carried postgres's and mongodb's new builds
(policy record) to the control node and the anchor on 2026-10-07: a send
composes the machine's whole declaration from the builds the mesh holds,
and the gate only ever looked at modules that roll out. Every send but a
person's push now composes a recorded module from the manifest of the build
the machine was last sent and records that it still carries it; the bus
step moves the bus alone. And each move a gated send carries says how many
of the module's containers it recreates, and whether with a new image or
only their declaration.
mesh/merge-gate pass: builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step; every machine composes with the change as it…
An incident is read for the minutes it happened in, and the seat's journal
verb could only give a unit's last lines: reading the controller's journal
around the control node's mail being recreated had no tool, and a person
reached for a shell. The verb now takes since, until, priority and a
fixed-string match, which its holder validates and redacts.
failed was the systemd module's own tool; on the seat, whatever holds the
role answers it and every machine is asked the same way. Its claimant in
mesh-catalog serves it on the branch of the same name.
mesh/merge-gate pass: builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step; every machine composes with the change as it…
A VPN client rewrote the laptop's resolver file and nothing said so. The
engine now states its machine's networking; the controller keeps it with
the machine's health (migration 0077) and raises the rewrite as its own
finding naming the writer, the machine's own faults as machine.<m>.network,
and what several machines cannot reach once, there. The gate waits on a
rewrite it did not make rather than putting back a good build.
mesh/merge-gate pass: builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step; every machine composes with the change as it…
With twelve consumers of the database provision, one provider down would be
twelve conditions for one fault and twelve gates failed for something none of
them did. A consumer's check names the provision it exercises; while the
provider composed for it — its recorded binding, or the machine its credential
comes from — is unhealthy on the record, what that check finds raises nothing
of its own: the provider's condition lists it as waiting and is urgent, and
the consumer's gate waits, past its bound too, rather than putting a build
back. Liveness findings and checks naming no provision stay the consumer's own,
and once the provider is healthy a consumer still failing is raised at once.
mesh/merge-gate pass: builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step; every machine composes with the change as it…
mesh/delivery held for a person: merged, and the controller opened no walk for it within 10m0s — nothing it holds follows that branch, or the merge was…
A module could say nothing about what ready means for what it runs, so a web
application with its port open and its requests hanging passed everything for
eleven hours (issue 145). A long-running resource now carries `health` — the
image's own check adopted by name, http, tcp, exec, unit or a module's own tool,
with its timing — refused near its author when it names a port or an address,
an endpoint the module does not declare, a tool it does not serve, a tool check
alone, or a timing outside the record's bounds. It is composed with the endpoint
as the port this machine published it on, and sent only to a node-engine whose
statement says it reads it: an older one would refuse the whole declaration.
The engine is granted its own machine's instance of each health tool. `module
check` warns of every long-running resource without `health`, counts them for
the catalogue, and refuses them from 2026-11-18. A check's findings stay out of
a condition's summary. The node-engine's validator is vendored at its Phase B
commit, so what is composed is judged by the words the engine takes.
mesh/merge-gate pass: builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step; every machine composes with the change as it…
Two ADR 0240 drills recorded with hand-act record --cause drill raised
mesh.hand-acts.drill.healer-wanted. hand-act drill (seat verb drill) records
them as a person's decision; hand-act record now refuses the cause, so the
two recorded before it clear on the next tick and a repair cannot pass for a
drill by the word it gives.
mesh/merge-gate pass: builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step; every machine composes with the change as it…
The witness moves a running build aside into a directory the controller's user
cannot enter, then deletes it; a verb exec'd from os.Executable() in that window
failed with permission denied. /proc/self/exe stays valid while the process lives.
A verb that still cannot start, or arrives while the controller stops, is refused
with link.ErrHandingOver and marked retry: handing-over.
mesh/merge-gate pass: builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step; every machine composes with the change as it…
The gate judged a module by what the mesh saw from outside, so a container that
crash-looped after it applied passed it. Each machine's node-engine now states
the health of every long-running resource it runs; the controller keeps the
newest statement per machine, raises module.<module>.<machine>.unhealthy on the
second statement in a row, clears it on the first that does not say it, and the
gate passes a module only when every long-running resource of it is stated
healthy since the send. An engine that states nothing is judged as before.
mesh/merge-gate pass: builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step; every machine composes with the change as it…
mesh/delivery held for a person: merged, and the controller opened no walk for it within 10m0s — nothing it holds follows that branch, or the merge was…
mesh/merge-gate pass: builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step; every machine composes with the change as it…
An ask redelivered after the build agent stopped mid-check (the rollout it was checking updated it)
found its own throwaway store under its name, and the check said it could not run (mesh-controller#105,
build-1791331512096605198).
mesh/merge-gate pass: builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step; every machine composes with the change as it…
A check asked by the controller before its own build of the issue 285 fix was registered was judged by
the controller the mesh ran then, which passed 0 of 4 composing. The judge is the running controller by
design, so the rule is read where the verdict is taken too: from the machines the verdict lists.
mesh/merge-gate error: builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step; the check could not run: a throwaway postgr…
mesh/repo-check error: the check could not run: a throwaway postgres:17-alpine could not be raised: docker run --label mesh.build=build-1791331512096605198…
The snapshot promises no address, and every module's repository, reads and sources carried the URL the
mesh clones from. A check matches repositories by owner and name, so nothing it reads is lost (novox/hq
issue 288).
mesh/merge-gate pass: builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step; every machine composes with the change as it…
mesh/merge-gate pass: builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step; every machine composes with the change as it…
The gate composed 0 of 4 machines with the change and without, and passed every change: the store it
raised held each module's bus credential but no account for it (issue 203's refusal), no outward links
(so no filter could be composed), and refused settings the mesh holds. Now the account is minted with
its credential, the facts carry each machine's outward links (a stand-in for an older snapshot), the
mesh's layers are kept as held, and a withheld path keeps a path's shape. A machine the mesh composes
that the gate cannot raise makes the verdict an error, never a pass; the verdict alone is on stdout.
A merge-check.sh that passed on an agent's machine failed on the build seat: a newer gofmt, siblings at
a feature branch, another user. `mesh-controller check-here` runs builder.Check with the ask the
controller would make, from facts that now name the toolchains and the refs cloned beside; a failed
script is said by what failed. (novox/hq issues 282, 283)
mesh/merge-gate pass: builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step; every machine composes with the change as it…
mesh/repo-check fail: its merge-check.sh failed: FAIL
A walk mesh-delivery never lets go waited for ever with nothing open: S16
says it at 30 minutes, urgent at 4 hours, naming plans go. Phase B: probe
D14 reads the delivery owner's stalled and raises delivery.<id>.stalled,
and H2 takes the table's transition through its close.
While the mesh-delivery seat has a holder on record, a merge that moves no
core module opens its walk and asks nothing until mesh-delivery or a person
says go; nothing of it is registered before its turn, so no other send
carries it. The controller keeps the planner, the gate, sending and the
walk, and gains the verbs the owner asks with: delivery-plan, -order,
-check (a group composed as one future state), deliver, delivery-stop,
delivery-walks; every walk kept is said as plan-moved.
One commit, one plan: a commit off the trunk — a pull request's head, a branch built by
hand, a rebuild or replay of one — is for checking. The build seat reads from its clone
which branches hold the commit, and the controller records and never registers a build
whose commit is not on the branch the module follows (the repository's default for a
new one), so nothing off the trunk can be sent.
A pull request's check now carries its change plan, computed by the planner: what a
merge would build in which order, what each machine would receive, and what is not an
ordinary send — the bus step, a module waiting for a person, a provider's consumers.
touchedBy is now the only mapping of changed files onto modules — touched, added, and
read by no build — and reachOfMerge the planner's whole answer with the dependency walk.
The merge handler, the plan what-if, the merge gate's width and composition, and a pull
request's check all ask it, so planning and gating cannot disagree. The gate composes
the definitions of the modules a merge would rebuild or add, not every one in the tree,
and the check says the dependents a merge would build after them.
The builder reads a module's own directory (the repository for one built from its root)
and a repository its recipe packages, nothing else. A file in no module's directory was
read as shared code and rebuilt everything built from the repository: 103 modules for a
merge-check.sh added at the catalogue's root. It now touches nothing, in the merge
handler, the release planner and the pull request's check alike, and the gate says so.
de-spiegel's and link2pay's manifests already fail the module check on main; without
comparing against the base branch every pull request touching them would fail the gate
for a fault none of them made. The gate's own rule: what was already so is said.
Every pull request the forge announces is mapped onto the mesh's module graph by the
merge handler's rule (issue 278): touching a module — or adding one — runs the gate
(mesh/merge-gate), its judge chosen by the graph (the controller judges itself, the
node-engine by its validator); a repository of the mesh that touches none runs only its
own merge-check.sh (mesh/repo-check), a warning when it has none. Nothing is left pending:
a repository outside the mesh touching nothing is told so as a pass.
The gate moves out of the per-repository scripts into the build seat, so a script is the
repository's own tests and declares its toolchain (go or typescript). The controller's
manifest names every verb of its seat again (ADR 0132), held by a test.
mesh/merge-gate error: the check could not run: a throwaway postgres:17-alpine could not be raised: docker run --label mesh.build=build-1791318263948250337…
mesh/merge-gate error: the check could not run: a throwaway postgres:17-alpine could not be raised: docker run --label mesh.build=build-1791317509716888018…
An image is not byte-reproducible, so ADR 0236's 'same artifacts is no move'
never held for one: a catalogue merge that did not touch the bus rebuilt it,
and every send to the control node waited for a planned bus upgrade.
The builder now records a source fingerprint per build (module tree, context
trees, bases and toolchains by digest). A rebuild with the fingerprint of the
build it repeats is registered with that build's artifacts, handed to modules
standing on it, holds no push, demands no bus step, and a plan sends and
gates nothing for it. Identical artifacts remain a second way to be no move.