Phase 5 (4/4): replay issues 263 and 273 (hq ADR 0237) #98

Merged
mesh-admin merged 1 commits from feat/replays into main 2026-10-06 19:19:49 +00:00
Contributor

hq to-be 45 §9 (M9), ADR 0237 decision 5.

cmd/mesh-controller/replays_test.go: TestReplay263AnIdentityTooLongNeverRefusesItsProvidersMachine and TestReplay273AConsumerBesideItsStoreStaysBoundToIt, written only with what the controller had before each fix so the prover (mesh-lab replays/cmd/prove) lays the file over the older commit.

Proved: 263 fails on 6d620f7^ with the incident's own refusal (mesh_laptop_networkmanager, 26 characters where an S3 access key keeps 20) and passes on 6d620f7; 273 fails on 8bfaf15^ (bound to the store on the other machine) and passes on 8bfaf15.

After merge: mesh-lab's register reads these from feat/replays — flip its HomeRef to main.

hq to-be 45 §9 (M9), ADR 0237 decision 5. `cmd/mesh-controller/replays_test.go`: `TestReplay263AnIdentityTooLongNeverRefusesItsProvidersMachine` and `TestReplay273AConsumerBesideItsStoreStaysBoundToIt`, written only with what the controller had before each fix so the prover (mesh-lab `replays/cmd/prove`) lays the file over the older commit. Proved: 263 fails on 6d620f7^ with the incident's own refusal (`mesh_laptop_networkmanager`, 26 characters where an S3 access key keeps 20) and passes on 6d620f7; 273 fails on 8bfaf15^ (bound to the store on the other machine) and passes on 8bfaf15. After merge: mesh-lab's register reads these from `feat/replays` — flip its `HomeRef` to `main`.
mesh-admin added 1 commit 2026-10-06 19:18:09 +00:00
mesh-admin merged commit b9e0cd34c3 into main 2026-10-06 19:19:49 +00:00
mesh-admin deleted branch feat/replays 2026-10-06 19:19:49 +00:00
Author
Contributor

Delivery novox/mesh-controller@b9e0cd34c3fb — held since 2026-10-06T23:05:28Z

Held for a person: merged without a passing check: only a person decides that it goes on — mesh-delivery.release with why lets it go on.

Delivery plan — builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step

  • tier 0: mesh-controller
  • tier 1: build-agent
  • tier 2: route-proxy
  • ace: receives build-agent, route-proxy
  • g14: receives build-agent
  • novox: receives mesh-controller, build-agent, route-proxy
  • shanks: receives build-agent
  • build-agent keeps data (ADR 0233): what it holds is backed up before it moves
  • route-proxy provides route: its consumers are sent again after it
  • route-proxy keeps data (ADR 0233): what it holds is backed up before it moves

Transitions

  • 2026-10-06 23:05 (new) → proposed (announced): novox/mesh-controller#98 merged; its head was not heard by this owner, so it is made from the forge's word
  • 2026-10-06 23:05 proposed → held (merged-unchecked): merged without a passing check — a verdict known with it is taken first: only a person decides that it goes on

The commit's note under refs/notes/mesh-plan keeps every transition: git log --notes=mesh-plan.

<!-- mesh-delivery:view --> **Delivery** `novox/mesh-controller@b9e0cd34c3fb` — **held** since 2026-10-06T23:05:28Z Held for a person: merged without a passing check: only a person decides that it goes on — `mesh-delivery.release` with why lets it go on. **Delivery plan** — builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step - tier 0: mesh-controller - tier 1: build-agent - tier 2: route-proxy - ace: receives build-agent, route-proxy - g14: receives build-agent - novox: receives mesh-controller, build-agent, route-proxy - shanks: receives build-agent - build-agent keeps data (ADR 0233): what it holds is backed up before it moves - route-proxy provides route: its consumers are sent again after it - route-proxy keeps data (ADR 0233): what it holds is backed up before it moves **Transitions** - 2026-10-06 23:05 (new) → proposed (announced): novox/mesh-controller#98 merged; its head was not heard by this owner, so it is made from the forge's word - 2026-10-06 23:05 proposed → held (merged-unchecked): merged without a passing check — a verdict known with it is taken first: only a person decides that it goes on The commit's note under `refs/notes/mesh-plan` keeps every transition: `git log --notes=mesh-plan`.
This repo is archived. You cannot comment on pull requests.
No Reviewers
1 Participants
Due Date
No due date set.
Dependencies

No dependencies set.

Reference: novox/mesh-controller#98