plans stop|close, plans retry and upgrade release-backlog kept a walk's start or end mark without saying it,
so the router would hold what the walk touched until its bound; each now runs on the bus as plans go does.
A hand stop keeps who stopped it, so its outcome is stopped, not failed (review 15, ADR 0308, issue 532).
The router holds what an open walk touches and tells its result once; it can do so
only if plan-moved names the walk's start and end, the modules and machines it moves,
what a moved tool runner or node-engine carries there, and how long to hold.
A walk whose delivery was held for a person said only that it waits for
mesh-delivery's word and that plans go starts it by hand, pointing the
reader at a hand start instead of the person's decision. Ask mesh-delivery
what holds each waiting walk and say the held delivery, its reason and
mesh-delivery.release, or the delivery not at its turn.
mesh/merge-gate pass: builds build-agent, mesh-controller → ace, g14, novox, shanks; no bus step; every machine composes with the change as it did without …
A walk left the machine holding the bus out of a gated send whenever a
build waited there for that same gate, so a module's new health tool was
refused by the bus on its first machine and the gate could not pass. The
grants step sends that machine its declaration with every build kept,
before the first machine's send; plans and the change plan say it.
mesh/merge-gate pass: builds build-agent, mesh-controller → ace, g14, novox, shanks; no bus step; every machine composes with the change as it did without …
An outcome arriving after its plan failed is kept only in the build records,
so a retry read from the plan alone asked one failed build and the records
then failed the plan again on the next. Settle the tier from the records first.
mesh/merge-gate pass: builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step; every machine composes with the change as it…
mesh/merge-gate pass: builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step; every machine composes with the change as it…
The operator's budget (a leaf module running everywhere within five minutes
of its merge, a core module within ten) cannot be held to without knowing
where a walk's time goes. A walk now keeps when its batch's window closed,
when it was cut and its class (migration 0093), each gate reading, and what
each machine of the rest was sent; 'delivery walks' and plan-moved say its
phases from the merge to every machine of the rest reporting the build
applied, and ended walks keep them as walk-phase durations per class. Probe
D16 reads mesh-delivery's 'times' and raises delivery.<class>.over-budget.
A phase that cannot be measured is said unknown, never zero. Measurement
only: no walk is held, sent or judged differently.
mesh/merge-gate pass: builds build-agent, mesh-controller → ace, g14, novox, shanks; no bus step; every machine composes with the change as it did without …
mesh/merge-gate pass: builds build-agent, mesh-controller → ace, g14, novox, shanks; no bus step; every machine composes with the change as it did without …
mesh/merge-gate pass: builds build-agent, mesh-controller → ace, g14, novox, shanks; no bus step; every machine composes with the change as it did without …
mesh/merge-gate pass: builds build-agent, mesh-controller → ace, g14, novox, shanks; no bus step; every machine composes with the change as it did without …
mesh/merge-gate pass: builds build-agent, mesh-controller → ace, g14, novox, shanks; no bus step; every machine composes with the change as it did without …
Every merge opened a walk and the next merge of the branch superseded it: two
catalogue merges 18 s apart left a walk no delivery held, and the operator
started it by hand 58 minutes later. A merge now joins the open batch, kept in
the store (migration 0089), which is cut into one walk when no merge came for
merge-window (90 s) or at merge-window-at-most (10 min): one commit per
repository, the latest of its branch, with every file the batch's merges
changed. One walk at a time; a started walk is never superseded, a waiting one
is folded into the next. The walk names every merge it answers on the wire
(delivery.merges, taken_over_by, batch). A failed walk walks its earlier merges
alone, newest first, until one is delivered. A delivery group's order becomes
tier edges inside the walk. plans shows the batch assembling; S18 and S19
bound its waits; S16 names the merges a waiting walk answers.
mesh/merge-gate pass: builds build-agent, mesh-controller → ace, g14, novox, shanks; no bus step; every machine composes with the change as it did without …
mesh/merge-gate pass: builds build-agent, mesh-controller → ace, g14, novox, shanks; no bus step; every machine composes with the change as it did without …
A what-if named the build seat's holder as packaging the controller's
source, "rebuilt without their own source moving", while it was in the
plan because an open plan had not built it yet. The what-if and the merge
log now say, per module, which changed files of its build source moved it,
or that it is read whole and why: no build source recorded, a newer build
failed, or a plan has not built it yet.
A failed build, or a plan closed before reaching a module, left the
closure its last good build said, and a fix-forward to a newly imported
package would have moved nothing. A missed merge moving only a module
that packages the repository was never caught up, and an older merge
read as history for it through a look that was not its own. The gate,
a pull request's check, the what-if and a delivery's order now read the
same view the merge handler does.
Every merge to the controller's repository planned the controller, the
build seat's holder and the route proxy in three gated tiers, whatever it
changed (issue 338). The planner now maps a merge's files onto the build
source each module's newest trunk build said: a README moves nothing, the
controller's command the controller alone, the proxy's program the proxy
alone. A module with none said, or one an open plan has yet to build, is
read whole as before. Sharing a repository draws no packages edge any more,
and one recorded before neither widens nor orders a plan.
mesh/merge-gate pass: builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step; every machine composes with the change as it…
On 2026-10-09 a release's gate on the control node read the machine's
report against a newer send another plan had just made there, failed
three builds the machine had reported healthy, and put them back on
every machine to a controller older than the store's schema; that
controller then passed the newer plan's gate from its own health.
- A gate keeps what its send carried (digest, sequence) and reads the
report against it; a report on the last send is on it too.
- A gate judges only the build the machine was last sent: another build
there supersedes the judging — no verdict, nothing put back.
- A controller is told its build (MESH_CONTROLLER_VERSION, ${version}
in a process's env) and records how far it reads the store's schema;
a put-back to a build that reaches less, or never said, is refused
and the current build kept, said as urgent.
- A release's open gate holds other sends of its modules there, and a
plan's own first send waits on it.
mesh/merge-gate pass: builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step; every machine composes with the change as it…
- A reopened fault keeps its gaps: it was there at a send unless the send
fell in one, so a send that breaks a machine recovered before it still
fails its gate (A2).
- An undecided part holds only the conditions that name it (A4).
- D2 holds a silent resolver for the next run again, refused or not: a
burst of refusals is also a restart (A3).
- A late merge is planned at the newest planned merge of its branch in any
state, not only an open one (A1); merge times to the nanosecond (A5).
A merge acted on late by the catch-up made its plan after the plan of the
merge that followed it, superseded it by creation time, and folded its
unbuilt modules into a plan at the older commit: on 2026-10-09 the
forge's security fix (a082615b) was superseded by 8ff8197a. A plan now
keeps its merge time (migration 0086), supersession follows it, and a
merge older than an open plan of its branch is planned at that plan's
commit, which contains it.
mesh/merge-gate pass: builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step; every machine composes with the change as it…
For 28 minutes on 2026-10-08 every send to the control-node was refused for a new bus build that only a
person's bus upgrade moves, and no condition said so: the refusal lived only in each walk's note, and S3
would have called it lateness after half an hour, in words that named neither the bus nor the verb.
- Row S17, bus.<module>.step-waiting: raised on the first watchdog tick after a walk's send is refused for
the bus, for the operator, naming the machines, what waits, the bus build from and to, since when and
mesh-controller.bus upgrade. It clears once the bus's machine runs the build the mesh holds.
- S3 leaves out a walk held only by the bus's step.
- A change that builds the bus says in its delivery plan and summary (which mesh/merge-gate carries) that
merging it needs a person's bus upgrade, and that nothing else reaches its machine until then.
- TestReplay336 fails on the commit before and passes on this one.
A packages edge orders nothing, so a module and what packages its source
share a tier by rule; hasCycle counted the edge and the merge handler said
"the last tier depends on itself" of plans with no cycle. Skip the kind as
tiersOf does. The planner tests' cycle rows and property now pass.
mesh/merge-gate pass: builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step; every machine composes with the change as it…
A build that passed on its first machine was judged again from that
machine's next reports while its send to the rest waited; another walk's
unreported send there then failed the passed build at the wait's bound
and put it back.
Review of #150: a withdrawal could land between the look and the act, a
failed ask read as a build in flight, a request kept the wrong asker, a
build being registered read as not built, build "true" could ask a build
nothing waited on, and a status read changed state. Claim a row under the
machine's hold before making it, keep a request only once asked, settle on
the controller's own tick, raise an assignment not made as a condition
until it is answered, and tie each row to its machine.
A merge asks for a new module's build, and assign answered "no module of that
name" until the build registered it, which read as a module nobody registered
(hq issue 325). Keep every build request, tell a build in flight, a module
known and not built, and an unknown name apart, and make an assignment made
while the build runs when the build registers the module.
mesh/merge-gate pass: builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step; every machine composes with the change as it…
mesh/merge-gate pass: builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step; every machine composes with the change as it…
mesh/delivery covered: a later merge that contains it was delivered: novox/mesh-controller@bf11a8baacda (merged as 96c34c52 into main, walk plan-17914006…
A refused step was logged on every 30-second tick with the same words; it is said, and kept,
when it is new. The refusal named the retired "release plan".
mesh/merge-gate pass: builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step; every machine composes with the change as it…
A seat's verb names the shell commands it is the mesh's way to do, and a module says it for its own
tools in its manifest; the tools verb and module list --json carry both, for the mesh MCP server's
search, the agent's instructions and the guard on its shell.
plans said a build queued for minutes had been building for a few seconds: the line counted from
the last save, and every advance saved the plan whether or not it moved, bumping its revision and
saying plan-moved on the bus. The line, status and LATE now count from when the plan entered its
tier with the stalled condition's bound, and an advance that changes nothing writes nothing.
mesh/merge-gate pass: builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step; every machine composes with the change as it…
A plan's gated send for mail carried postgres's and mongodb's new builds
(policy record) to the control node and the anchor on 2026-10-07: a send
composes the machine's whole declaration from the builds the mesh holds,
and the gate only ever looked at modules that roll out. Every send but a
person's push now composes a recorded module from the manifest of the build
the machine was last sent and records that it still carries it; the bus
step moves the bus alone. And each move a gated send carries says how many
of the module's containers it recreates, and whether with a new image or
only their declaration.
While the mesh-delivery seat has a holder on record, a merge that moves no
core module opens its walk and asks nothing until mesh-delivery or a person
says go; nothing of it is registered before its turn, so no other send
carries it. The controller keeps the planner, the gate, sending and the
walk, and gains the verbs the owner asks with: delivery-plan, -order,
-check (a group composed as one future state), deliver, delivery-stop,
delivery-walks; every walk kept is said as plan-moved.
touchedBy is now the only mapping of changed files onto modules — touched, added, and
read by no build — and reachOfMerge the planner's whole answer with the dependency walk.
The merge handler, the plan what-if, the merge gate's width and composition, and a pull
request's check all ask it, so planning and gating cannot disagree. The gate composes
the definitions of the modules a merge would rebuild or add, not every one in the tree,
and the check says the dependents a merge would build after them.
mesh/merge-gate error: the check could not run: a throwaway postgres:17-alpine could not be raised: docker run --label mesh.build=build-1791318263948250337…
mesh/merge-gate error: the check could not run: a throwaway postgres:17-alpine could not be raised: docker run --label mesh.build=build-1791317509716888018…
An image is not byte-reproducible, so ADR 0236's 'same artifacts is no move'
never held for one: a catalogue merge that did not touch the bus rebuilt it,
and every send to the control node waited for a planned bus upgrade.
The builder now records a source fingerprint per build (module tree, context
trees, bases and toolchains by digest). A rebuild with the fingerprint of the
build it repeats is registered with that build's artifacts, handed to modules
standing on it, holds no push, demands no bus step, and a plan sends and
gates nothing for it. Identical artifacts remain a second way to be no move.
The merge of mesh-catalog 7f99fb4a rebuilt 103 modules with the build agent in tier 0, and ADR
0236 recorded it as "a change to the build agent rebuilds most of the catalogue". The agent had
not changed: modules/showcase/index.ts had. showcase is the catalogue's reference module, held
by no machine, and its manifest was not in the merge, so whatTheMergeTouched read the file as
shared code and rebuilt everything built from the repository (88 came out byte-identical). The
agent stood first only because everything is built by it.
Whether a directory is a module is a fact of the repository at the merge commit, so the forge's
announcer now says it: module_dirs, the changed files' directories holding a module.json there,
with module_dirs_said. A changed file inside one is that module's business; only a file in no
such directory is shared. An announcer that does not say keeps the old rule. `plans` what-if
takes the same list as module-dirs.
And a regression for the open question: nothing depends on the build agent except by being
built by it, and built-by never widens a plan, so a change to the agent - manifest or program -
rebuilds the agent alone; what moved beside it is ordered after it.
A send carries the machine's whole declaration, so at the switch to roll the next send of
anything would have carried the old default's backlog, unjudged, to every machine. A gated
send now carries and judges everything waiting on its machine; every other send is refused
or leaves the machine; a release plan walks what waits one machine at a time, the control
node last, and one that fails holds the next until a person releases it.
A build that reported applied was sent everywhere; one that then did nothing, served
no tools or broke its machine's word reached every machine. Now the first machine is
judged by the component's health (the core's definitions, as doctor probes H-*, or a
module's own) three times over two minutes within ten; a failing gate puts the previous
build back there once, marks the build, and says it as a condition and an event.
Upgrades roll out by default; the bus is a planned step; a module deleted at its
source is not built (the public-acme plan failure).
Two controllers could both act (issue 204), a reconcile's report could
overtake the apply after it and the digest decided (issue 267), and a grant
could make a second writer of a machine's report.
- The lease (internal/lease, ADR 0229): mesh-controller_lease key `holder`,
15 s age, renewed every 5 s by compare-and-set; the epoch is the revision
it was taken at. The gate is the clock (stops 3 s before expiry); a refused
renewal is a loss and the process exits; a holder that stops gives it back.
serve takes it before asserting the bus. Epochs kept in the store
(migration 0068 controller_epoch) as a floor: a bucket raised from nothing
is compacted past it. Unleased (no epoch, S12 urgent) only when nobody
holds it and the bus will not let it be written. A shell command acts
under the holder's epoch, or its own lease when none.
- Declarations carry `epoch` inside the signed envelope, only to a machine
whose latest account carried a report_sequence (mesh-host #35); would-send
is composed with the epoch last sent. Allot and the send both pass the gate.
- Reports: contract in internal/link/order.go (epoch, sequence,
report_sequence, older_than, refused_older). Accounts kept by epoch, then
sequence, then report sequence; older refused, counted; unordered reports
keep the digest rule. Plans by compare-and-set on a revision, with epoch.
Conditions and calls carry the epoch and are not written off the lease.
- S12 and S13 (naming the writer by epoch) watched, D5 run; reset of the
bucket said. Writers table compiled in and enforced in PermissionsFor; the
controller no longer publishes mesh.control.>. A contract per consumed
kind, and the empty-on-error lint over the repository.
- mesh-host pinned to its main with the epoch in the validator (D1 validates
the envelope as sent).
Needs mesh-host's genesis lock with the lease grant (mesh-host PR) for
TestTheInstallersFirstUserListIsWhatTheControllerWouldCompose.
A controller restart lost every call's outcome, `status` composed the mesh
while its caller waited (18.6s live on 2026-10-06, past the 10s window), a
repair by hand left no trace, and the core's bounds had nothing measured to
be set from.
- calls: kept in the controller's bucket mesh-controller_calls (last 1000 or
14 days, answers bounded to 64 KiB), read by id across a restart; a
controller starting marks a stopped one's running calls abandoned; each
call names its caller from the inbox its answer goes to.
- status: the serving controller composes it at start, after news from a
machine, a build or an acting verb, and every minute; the verb answers the
last composition at once with when and how long it took. Composing resolves
each machine once instead of twice.
- hand-act log in mesh-controller_hand-acts: push (required through the seat),
plans stop/close, broker consumer-reset and the new hand-act record take
--why/--cause/--condition; `hand-acts` lists them and repeated causes;
status counts the week's.
- durations (migration 0066): apply (send to first report), heartbeat gap,
plan tier and build, recorded as heard; `durations` summarises them.
- the controller's seat row takes this binary's definition of its own verbs,
so the console no longer judges calls against an older build's schema.
- the controller is granted its two buckets' subjects.
A registered replay asked now outranked newer asks of its module, and a plan
took any later outcome as its answer. A replay is now refused while the module
is asked anywhere, a plan module asked under an id is answered by that id
alone, and a rebuild of a commit asks what the module follows. An ask handed
back after a restart no longer reads as dead; a cancel that meets a start is
withdrawn; pause holds for an ask fetched as it lands; kill removes containers
before and after the build ends and says whether its outcome went out; a
holder may say only its own machine is paused.
Nothing showed what waited for a build machine, and an ask could not be
dropped without leaving the plan that made it waiting for ever. New verbs:
queue, cancel, clear, rebuild, replay, kill, pause, resume, and plans retry.
Every ask a person drops is recorded failed through the same take-in as a
failed build; a plan keeps the id it asked each module under and matches
its outcome by it. replay is a dry run unless registered, and registering
an older commit than one registered since needs --older (hq issue 207).
A plan waiting on a seat paused on every holder says so and is not late;
a failed plan can be retried, and a rebuild joins the plan holding the
module instead of running beside it.
With one machine first a module is sent twice, and the tier gate asked every
machine for a report after the second send: the first machine's report, made
between the two, read as stale and the plan waited for ever (hq issue 256).
Also round a plan's wait to the second, not the minute, so it is not 0s.
A first machine that does not report within the bound now stops the
module's rollout, naming it. The first machine is the first by name heard
from lately; reports are judged by what the store says was last sent. A
plan that ends says what it built and never sent, and a failed send's
error is kept in the plan's note.
A merge planned without looking at open plans, so two plans worked the
same modules and a stuck plan stayed open for ever. The newer plan folds
in what older plans of the same repository and branch had not built or
sent, and closes them as superseded. A person can close a stuck plan by
id with `plans close <id>`.
A plan sent every machine running a module at once, ignoring the module's
upgrade policy. Unless the policy says together, the first machine by name
is sent, recorded in the plan, and the rest follow only once its report
after the send says it applied; a failed first machine stops the plan.