internal/chain holds typed Build, Rollout and Assignment and a Backend with no delete or purge, in memory and on the bus. The builds and rollouts buckets are asserted with history 64, no age and values up to just under a mebibyte; the assignments bucket gets the same, keeping its marker age because a stream cannot be made to disallow message ages. Migration 0104 makes the one-row chain_moved switch. The controller keeps no consolidated schema, so 0104 is the whole schema change. Nothing reads the buckets yet.
mesh/delivery stopped: Operator's word (2026-10-18 00:09): split the group. After mesh-catalog #353 merged on the group's Approve (23:48:51), #375's merg…
mesh/repo-check head a39d6ce78d19 merged into trunk 7c9c187ca6e2 — fail: its merge-check.sh failed: --- FAIL: TestADeliveryThatMovesABackedUpModuleWaitsFor…
mesh/merge-gate head 300d3c1bf466 merged into trunk 6a62a7e552ea — pass: builds build-agent, mesh-controller → ace, g14, novox, shanks; no bus step; every …
Under a module's own record (its manifest's, or its irreplaceable data's), every
move waited for a person's push, even one that only changed a tools bundle: the
database server stayed behind on ace on 2026-10-15 although its walk said it
recreated none of its containers. ADR 0377 lets such a move roll out.
A move is judged per machine against the build that machine was last sent: it
goes when no container, mounted file, data path, data declaration, provider or
(for a module with data) long-running process changes. A person's record, the
bus and any move that cannot be judged still wait. The walk keeps per machine
which way each recorded module went and why, says it in its note and log, and
status names a machine behind with `push <node>` only for a move that waits.
The tool runner's bus account carried the heard grants, consumer and bind word of every module it runs, and every agent session on that machine reaches the bus as that account, so any session could pull a granted module's consumer on MAIL. Per ADR 0376 §1 the controller now composes a restricted stream's consumer, grants and bind word only for a module that declares runs-as; registration refuses a consumes of a restricted stream without runs-as (§2), and a grant that composes nothing is said in doctor (D-heard) and in the controller's log on every raise and send.
A family like mesh-mail's mail-credential-* names only the module and the secret's key at the desk, so the operator cannot tell which account is asked. An own secret (or a family) may now declare a one-line prompt in its manifest, with {member} filled by a family member's suffix; the module check refuses one that is not one line, over 120 characters, or holds another placeholder. desk_secret.go reads it from the controller's own catalogue and sends it to the desk as what, never from the call or the module's runtime; omitted when none is declared, so an old desk or module behaves as today.
mesh/delivery covered after its failure: a later walk that contains it was delivered: plan-1792019685173332639 (novox/mesh-controller at 0b7e740b into ma…
A session on the mesh MCP server polls for every verdict, answer and delivery because the tool
runner's account hears no event. ADR 0367 lets the tool runner's module name, one by one, the
families a session may wait on: the manifest's `waits`, refused for any other module and for a
wildcard. The controller grants the runtime's account a plain subscription on those subjects
alone, makes no durable consumer for them, and issues the same list in the tool runner's
membership, so the grant and what `mesh_wait` offers come from one composition and no call or
setting widens it. A family on a seat whose events end in a kind or an asker must name it, and is
refused at composition without it, so it is never granted a subject nothing publishes on.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
mesh-mail's events must live on a stream of their own and reach only the modules the operator granted
an account (ADR 0359 §2, §4). The controller now creates a module's declared stream, publishes its events
on mesh.stream.<module>.event.<event>, and composes a consumer's durable consumer, filters and bus grants
on a restricted stream only where its consumes asks and the provider's trusted value names it; a consumer
that loses its grant has its consumer removed on the next assertion. Nothing changes while no manifest
declares a stream.
mesh/merge-gate head 38c87a7e4714 merged into trunk c2ec0a601acb — pass: builds build-agent, mesh-controller → ace, g14, novox, shanks; no bus step; every …
mesh/merge-gate head 34050dc6a3c5 merged into trunk a5500f732f77 — pass: builds build-agent, mesh-controller → ace, g14, novox, shanks; no bus step; every …
mesh/merge-gate head 060f2a9ca5fd merged into trunk 04730b54a8f2 — pass: builds build-agent, mesh-controller → ace, g14, novox, shanks; no bus step; every …
The gate and the repository's check mount the workspace read-write, so a
build from that tree could hold what the tests wrote under a key that
describes the merge. A check now clones the merge outside the workspace
before anything of the change runs, and builds from that. A check keeps,
and a walk takes, only a build an earlier check of the same pull request
at the same head made: another pull request's build, or an earlier
head's, is never registered. The walk reads the verdicts once
(novox/hq issue 703, review of #328).
mesh/repo-check head c2ea9b4c5187 merged into trunk 1601cb17432e — fail: its merge-check.sh failed: --- FAIL: TestAReleaseSendsTheRestAtOnceAfterTheFirstPa…
mesh/merge-gate head c2ea9b4c5187 merged into trunk 1601cb17432e — pass: builds build-agent, mesh-controller → ace, g14, novox, shanks; no bus step; every …
A release now sends every other machine in one step once its first machine
passed, each judged by its own gate; a failing one is put back without
stopping the others, a silent one is left. A send is kept before it is made,
and a machine already sent what a gate is for is not sent again: the gate
counts from that send and takes over another walk's readings of the same
build there.
Review of #283: a drain whose replacement was withdrawn held the agent for
ever with its health green; the gate trusted the engine's until; a machine
of the rest waiting at the bound read as silent and its apply time held the
wait; an unknown mesh-builder word exited 0; plan said nothing of a busy an
older engine is not sent; and a node with a report and no send broke the
reading of every last report (the store test's NULL).
mesh/merge-gate head 675466a8c35f merged into trunk bff5b7f0e4f8 — pass: builds build-agent, mesh-controller → ace, g14, novox, shanks; no bus step; every …
Two tier tests relied on the two-minute settle to keep a module unjudged; the
witness window and the gate's spacing now hold it. A healthy reading taken
before the controller's floor counted no pass, so a dip after it did not take
the two-minute pass away (novox/hq ADR 0352 decision 3).
mesh/delivery-group group feat/350-one-build-per-change checking: composed check out of date: novox/mesh-controller@cd49b50c4075 was judged against trunk bff5b…
A merge built every moved module a second time although its check had judged
the same tree (issue 649). The check now builds into the scratch namespace
under a reuse key (source fingerprint plus the builder's own digest), and the
walk of the trunk commit copies a build of the same key by digest instead of
building, saying per module why when it cannot (novox/hq ADR 0350).
mesh/merge-gate head c3946e5d72c2 merged into trunk bff5b7f0e4f8 — pass: builds build-agent, mesh-controller → ace, g14, novox, shanks; no bus step; every …
mesh/repo-check head c3946e5d72c2 merged into trunk bff5b7f0e4f8 — fail: its merge-check.sh failed: --- FAIL: TestACoreBehindWhileTheNodeToolsSettleFailsNo…
The operator wants these gates as fast as they can be: counting readings only after
two minutes added about 80 s to every node-engine rollout for no safety. Count
from the send, pass on the third healthy reading, and pass a module healthy at
every reading at two minutes on what it has (novox/hq ADR 0352).
mesh/merge-gate head 524295926f76 merged into trunk bff5b7f0e4f8 — pass: builds build-agent, mesh-controller → ace, g14, novox, shanks; no bus step; every …
mesh/repo-check head 524295926f76 merged into trunk bff5b7f0e4f8 — fail: its merge-check.sh failed: --- FAIL: TestACoreBehindWhileTheNodeToolsSettleFailsNo…
The controller runs on one machine, so three readings over two minutes guarded no
other machine and held every walk behind it. Judge each module by its own rule:
one reading for the controller and the tool runner once the node-engine's witness
window has ended, one for mesh-delivery, three for the node-engine and the
resolver with the first two minutes after the send (novox/hq ADR 0351). The
gate's verdict names the rule it applied.
mesh/merge-gate head e324f5d82162 merged into trunk 6f1a05366c1d — pass: builds build-agent, mesh-controller → ace, g14, novox, shanks; no bus step; every …
The warrant set the layer and left the push as a second act nobody took: the
operator approved a betterbird change on Telegram and nothing reached g14.
Now the warrant opens a settings walk: the machines the layer reaches, one at
a time, the module judged on each at its gate, its end told once through
plan-moved. The ask and the proposer's answer say so instead of naming push.
mesh/merge-gate head c9dd07f919a2 merged into trunk 404b4409e70e — pass: builds build-agent, mesh-controller → ace, g14, novox, shanks; no bus step; every …
A Servarr app's API key, an indexer's key and a downloader's password are values the provider's
software holds; the pair path made a random value for every consumer of them, sealed it to both ends
and reported success, and the provider refused it. An offer may now say `"credential": {"issued-by":
"outside"}`: SecretFor never makes a value for it, the plan reads such a pair as given or not given
and sends the consumer no credential file until a person gives it, without refusing its machine;
remakeShared and SharedSecretFor never make a provider's own secret issued outside either.
`secret accept <provider's node> <provider module> <provision>` seals one value to every consumer that
binds the provision from that provider, the provider and the operator, under one generation; the
per-pair form is refused for such a provision, and rotate names the accept. A consumer may wait for a
provision's credential: the controller excuses the wait only when the store bears it out, and its
needs-operator condition names the one accept line.
Adds the replay of issue 164 (TestReplay164), written with only what the controller had before.
A local service could only be declared public, which says the internet. local-network is a source and a reach: the private network and the private networks the machine reported on a link facing outside, judged here, shown by plan and node, and said in the rule set when there are none.
mesh/merge-gate head e658a14296f9 merged into trunk 1826b68a22b5 — pass: builds build-agent, mesh-controller → ace, g14, novox, shanks; no bus step; every …
A registered manifest carries no build, so mesh-tools' build.on naming the
SDK's package and every bundle's toolchain were edges only before a module was
first built: mesh-sdk 0.1.14 planned "sent nowhere". The relation now reads a
package base from the recorded name@version against the package the mesh holds,
and the toolchain from the bundles the resolved manifest keeps. Only records the
mesh already keeps are read, so it holds for every module built before it and a
rollback reads the same records. Replay R614.
mesh/merge-gate head 05576db018a4 merged into trunk a688dcff394b — pass: builds build-agent, mesh-controller → ace, g14, novox, shanks; no bus step; every …
A delivery plan made while another walk built a module reads it whole and names it; the walk, cut later,
finds none of the changed files in the build source that build recorded and moves nothing. Its record named
no module, so mesh-delivery read 'matched what runs' as 'never built', stopped the delivery and asked the
operator about a change already on every machine. The walk now says each such module in delivery.unchanged,
with why; its modules keep meaning what it builds.
mesh/merge-gate head 18221c4079d1 merged into trunk 7b2a9eae8020 — pass: builds build-agent, mesh-controller → ace, g14, novox, shanks; no bus step; every …
ParseManifest also reads stored builds again: a build's manifest at a
commit, the gate, a release, a module put back. betterbird's builds from
before its accounts file named its keys would have become uncomposable
there, so a send to g14 or shanks could fail and a rollback be refused.
The refusal now runs in module check, module add, a build taken in, the
builder and the merge gate's registration, and a file is no longer
reported by both §2 and §3.
mesh/delivery-group group feat/335-a-busy-container-is-replaced-when-idle rejected: its order contradicts itself: novox/mesh-catalog@190608193764, novox/mesh-c…
A merge into mesh-controller replaced every build agent and threw away the
checks in flight (issue 594). The manifest's container busy is checked and
sent only to an engine that reads it; a report's busy waits are kept, the
gate starts at the report that says the container replaced, and the wait is
a phase of the delivery time. mesh-builder busy drains the agent and answers
while a build is in hand (novox/hq ADR 0335).
A renewal timed out at the renew interval, so the lease test's 1 s renewals
could lose the lease on a slow build machine (novox/hq issue 591, review of #279).
Running ~90 migrations into a fresh database per store test, and bcrypt at
the default cost under the race detector, were most of the controller's
check (novox/hq issue 591).
The walk records its send to the rest only after every machine was sent,
which takes 20-28 s, so the machine sent first fell outside the 2 s slack,
its report was missed and the phase ended at the next walk's send to it.
Keep each machine's own send time with what it was sent, match its apply
duration by that send and digest, and show each machine's report in the
walk's phases (ADR 0282 decision 6).
mesh/merge-gate pass: builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step; every machine composes with the change as it…
The architecture and kernel a machine reported were kept and read by nothing, and the facts the
node-engine now says (memory, filesystems, processor, distribution, virtual or physical, uptime,
timezone) would have joined them. node shows every one in one block with the age of the account,
and a fact the machine could not determine as unknown with its why, never as a zero.
The send minted a random value for a plain own secret marked issued-by outside and placed it, so a
module could not tell "not given" from "given and wrong" (ADR 0228). It now places only a value a
person gave: not given is no file, an empty value where a module's file names it, and nothing to
restart on, as ADR 0283 decided for a family's member. A value the mesh made for one earlier is not
read as given.
mesh/merge-gate pass: builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step; every machine composes with the change as it…
PlanByID pasted its id into the query, and the id comes from a caller of
the plans verb: an id holding a quote changed the query (x' or '1'='1
answered another plan). The id is now $1, and RecentPlans's limit too, so
no plan query is built from a value.