cmd/mesh-controller/replays_test.go: TestReplay263AnIdentityTooLongNeverRefusesItsProvidersMachine and TestReplay273AConsumerBesideItsStoreStaysBoundToIt, written only with what the controller had before each fix so the prover (mesh-lab replays/cmd/prove) lays the file over the older commit.
Proved: 263 fails on 6d620f7^ with the incident's own refusal (mesh_laptop_networkmanager, 26 characters where an S3 access key keeps 20) and passes on 6d620f7; 273 fails on 8bfaf15^ (bound to the store on the other machine) and passes on 8bfaf15.
After merge: mesh-lab's register reads these from feat/replays — flip its HomeRef to main.
hq to-be 45 §9 (M9), ADR 0237 decision 5.
`cmd/mesh-controller/replays_test.go`: `TestReplay263AnIdentityTooLongNeverRefusesItsProvidersMachine` and `TestReplay273AConsumerBesideItsStoreStaysBoundToIt`, written only with what the controller had before each fix so the prover (mesh-lab `replays/cmd/prove`) lays the file over the older commit.
Proved: 263 fails on 6d620f7^ with the incident's own refusal (`mesh_laptop_networkmanager`, 26 characters where an S3 access key keeps 20) and passes on 6d620f7; 273 fails on 8bfaf15^ (bound to the store on the other machine) and passes on 8bfaf15.
After merge: mesh-lab's register reads these from `feat/replays` — flip its `HomeRef` to `main`.
build-agent keeps data (ADR 0233): what it holds is backed up before it moves
route-proxy provides route: its consumers are sent again after it
route-proxy keeps data (ADR 0233): what it holds is backed up before it moves
Transitions
2026-10-06 23:05 (new) → proposed (announced): novox/mesh-controller#98 merged; its head was not heard by this owner, so it is made from the forge's word
2026-10-06 23:05 proposed → held (merged-unchecked): merged without a passing check — a verdict known with it is taken first: only a person decides that it goes on
The commit's note under refs/notes/mesh-plan keeps every transition: git log --notes=mesh-plan.
<!-- mesh-delivery:view -->
**Delivery** `novox/mesh-controller@b9e0cd34c3fb` — **held** since 2026-10-06T23:05:28Z
Held for a person: merged without a passing check: only a person decides that it goes on — `mesh-delivery.release` with why lets it go on.
**Delivery plan** — builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step
- tier 0: mesh-controller
- tier 1: build-agent
- tier 2: route-proxy
- ace: receives build-agent, route-proxy
- g14: receives build-agent
- novox: receives mesh-controller, build-agent, route-proxy
- shanks: receives build-agent
- build-agent keeps data (ADR 0233): what it holds is backed up before it moves
- route-proxy provides route: its consumers are sent again after it
- route-proxy keeps data (ADR 0233): what it holds is backed up before it moves
**Transitions**
- 2026-10-06 23:05 (new) → proposed (announced): novox/mesh-controller#98 merged; its head was not heard by this owner, so it is made from the forge's word
- 2026-10-06 23:05 proposed → held (merged-unchecked): merged without a passing check — a verdict known with it is taken first: only a person decides that it goes on
The commit's note under `refs/notes/mesh-plan` keeps every transition: `git log --notes=mesh-plan`.
Blocking a user prevents them from interacting with repositories, such as opening or commenting on pull requests or issues. Learn more about blocking a user.
hq to-be 45 §9 (M9), ADR 0237 decision 5.
cmd/mesh-controller/replays_test.go:TestReplay263AnIdentityTooLongNeverRefusesItsProvidersMachineandTestReplay273AConsumerBesideItsStoreStaysBoundToIt, written only with what the controller had before each fix so the prover (mesh-labreplays/cmd/prove) lays the file over the older commit.Proved: 263 fails on 6d620f7^ with the incident's own refusal (
mesh_laptop_networkmanager, 26 characters where an S3 access key keeps 20) and passes on 6d620f7; 273 fails on 8bfaf15^ (bound to the store on the other machine) and passes on8bfaf15.After merge: mesh-lab's register reads these from
feat/replays— flip itsHomeReftomain.Delivery
novox/mesh-controller@b9e0cd34c3fb— held since 2026-10-06T23:05:28ZHeld for a person: merged without a passing check: only a person decides that it goes on —
mesh-delivery.releasewith why lets it go on.Delivery plan — builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step
Transitions
The commit's note under
refs/notes/mesh-plankeeps every transition:git log --notes=mesh-plan.