Issue 1937 (critical). The builder asks the controller's held for each done trunk key's bundle and archive blobs at its start and when a module value arrives, and consumes artifacts-gone; a key with a gone blob is claimed building as a new revision, said in a log line and in the key's step. No timer. Once delivered, the builder rebuilds the about 100 dead keys, queued by the build seats' capacity.
Group fix/1937-done-key-blobs: mesh-sdk, mesh-controller, mesh-delivery. Nothing the operator sees changes.
Reviewed-by: review-1937@shanks at 28ee22ef27
Pushed-by: lead-47@shanks
Issue 1937 (critical). The builder asks the controller's `held` for each done trunk key's bundle and archive blobs at its start and when a module value arrives, and consumes `artifacts-gone`; a key with a gone blob is claimed building as a new revision, said in a log line and in the key's step. No timer. Once delivered, the builder rebuilds the about 100 dead keys, queued by the build seats' capacity.
Group `fix/1937-done-key-blobs`: mesh-sdk, mesh-controller, mesh-delivery. Nothing the operator sees changes.
Reviewed-by: review-1937@shanks at 28ee22ef27e2f67355be3dc890ce7abed65b7cbd
Pushed-by: lead-47@shanks
The store's nightly collector deleted the bare blobs of node-tools', mesh-host's and the forge bridge's done keys, which
the controller had never taken in, and the builder kept them done: their next delivery would refuse. The builder now asks
the controller's held before it leaves a done trunk key done (once per key per process, at its start and on each module
value), claims a key whose blob is gone building as a new revision and says so in its log and the key's step, and hears
artifacts-gone, said when a take-in found a gone blob. No timer: a start, a value or an event.
mesh/delivery covered after its stop: a later walk that contains it was delivered: plan-1792840300970624489 (novox/mesh-delivery at 42d880f0 into main, d…
Deliverynovox/mesh-delivery@28ee22ef27e2 — stopped since 2026-10-24T10:53:06Z
Covered: covered after its stop: a later walk that contains it was delivered: plan-1792840300970624489 (novox/mesh-delivery at 42d880f0 into main, done, contains its merge d8b19cb3)
Delivery plan — builds mesh-delivery-builder → shanks; no bus step
tier 0: mesh-delivery-builder
shanks: receives mesh-delivery-builder
grants step: if this changes what the bus's user list says (a new tool, subject or user), novox is sent that list alone, every build there kept, before mesh-delivery-builder is judged on its first machine
composed together: pass — the checker's verdict at the members' heads (5bd558b99155)
Transitions
2026-10-24 02:39 (new) → proposed (announced): novox/mesh-delivery#33's head announced
2026-10-24 10:35 proposed → held (merged-unchecked): merged without a passing check — a verdict known with it is taken first: only a person decides that it goes on
2026-10-24 10:35 held → delivering (release): the operator merged the reviewed group fix/1937-done-key-blobs by hand at 12:35 (temporary build-publish-deliver mode since 00:24; their merge is their word to release); the group's composed check passed at 07:26 but never reached the forge (issue 1726)
2026-10-24 10:53 delivering → stopped (stop): its walk plan-1792838111606250980 was stopped by a person (mesh-controller): the operator's word 12:53: close it. Its tier 0 waits for ever on mesh-sdk ('builders disagree': a stale ace.typescript key in mesh-build-node_toolchains, issue 1940), and the 1940 fix can become a plan only after this one ends (ADR 0276 §4). Retried after the 1940 fix is delivered.
The commit's note under refs/notes/mesh-plan keeps every transition: git log --notes=mesh-plan.
<!-- mesh-delivery:view -->
**Delivery** `novox/mesh-delivery@28ee22ef27e2` — **stopped** since 2026-10-24T10:53:06Z
**Covered**: covered after its stop: a later walk that contains it was delivered: plan-1792840300970624489 (novox/mesh-delivery at 42d880f0 into main, done, contains its merge d8b19cb3)
**Delivery plan** — builds mesh-delivery-builder → shanks; no bus step
- tier 0: mesh-delivery-builder
- shanks: receives mesh-delivery-builder
- grants step: if this changes what the bus's user list says (a new tool, subject or user), novox is sent that list alone, every build there kept, before mesh-delivery-builder is judged on its first machine
**Group** `fix/1937-done-key-blobs`: novox/mesh-controller@c06f75d083a9, novox/mesh-delivery@28ee22ef27e2, novox/mesh-sdk@34f210e5eba1
- composed together: pass — the checker's verdict at the members' heads (5bd558b99155)
**Transitions**
- 2026-10-24 02:39 (new) → proposed (announced): novox/mesh-delivery#33's head announced
- 2026-10-24 10:35 proposed → held (merged-unchecked): merged without a passing check — a verdict known with it is taken first: only a person decides that it goes on
- 2026-10-24 10:35 held → delivering (release): the operator merged the reviewed group fix/1937-done-key-blobs by hand at 12:35 (temporary build-publish-deliver mode since 00:24; their merge is their word to release); the group's composed check passed at 07:26 but never reached the forge (issue 1726)
- 2026-10-24 10:53 delivering → stopped (stop): its walk plan-1792838111606250980 was stopped by a person (mesh-controller): the operator's word 12:53: close it. Its tier 0 waits for ever on mesh-sdk ('builders disagree': a stale ace.typescript key in mesh-build-node_toolchains, issue 1940), and the 1940 fix can become a plan only after this one ends (ADR 0276 §4). Retried after the 1940 fix is delivered.
The commit's note under `refs/notes/mesh-plan` keeps every transition: `git log --notes=mesh-plan`.
Blocking a user prevents them from interacting with repositories, such as opening or commenting on pull requests or issues. Learn more about blocking a user.
Issue 1937 (critical). The builder asks the controller's
heldfor each done trunk key's bundle and archive blobs at its start and when a module value arrives, and consumesartifacts-gone; a key with a gone blob is claimed building as a new revision, said in a log line and in the key's step. No timer. Once delivered, the builder rebuilds the about 100 dead keys, queued by the build seats' capacity.Group
fix/1937-done-key-blobs: mesh-sdk, mesh-controller, mesh-delivery. Nothing the operator sees changes.Reviewed-by: review-1937@shanks at
28ee22ef27Pushed-by: lead-47@shanks
Delivery
novox/mesh-delivery@28ee22ef27e2— stopped since 2026-10-24T10:53:06ZCovered: covered after its stop: a later walk that contains it was delivered: plan-1792840300970624489 (novox/mesh-delivery at
42d880f0into main, done, contains its merged8b19cb3)Delivery plan — builds mesh-delivery-builder → shanks; no bus step
Group
fix/1937-done-key-blobs: novox/mesh-controller@c06f75d083, novox/mesh-delivery@28ee22ef27, novox/mesh-sdk@34f210e5ebTransitions
The commit's note under
refs/notes/mesh-plankeeps every transition:git log --notes=mesh-plan.