Register the replay of issue 309 (hq ADR 0237) #64

Merged
mesh-admin merged 1 commits from replays/309-an-order-rule-yields-to-a-stronger-one into main 2026-10-08 09:27:28 +00:00
Contributor

R309: the delivery group of the controller, the node-engine and the lab, refused because built by and engine before controller ordered one pair both ways. A test in the controller (cmd/mesh-controller/replay309_test.go, TestReplay309), fix c5a2edf on novox/mesh-controller's 309 branch.

go run ./cmd/prove R309: PROVED — before its fix fails (the group refused as a cycle), on its fix passes. replays/merge-check.sh passes.

Merge after novox/mesh-controller's PR for 309.

R309: the delivery group of the controller, the node-engine and the lab, refused because *built by* and *engine before controller* ordered one pair both ways. A test in the controller (`cmd/mesh-controller/replay309_test.go`, `TestReplay309`), fix c5a2edf on novox/mesh-controller's 309 branch. `go run ./cmd/prove R309`: PROVED — before its fix fails (the group refused as a cycle), on its fix passes. `replays/merge-check.sh` passes. Merge after novox/mesh-controller's PR for 309.
Author
Contributor

Delivery novox/mesh-lab@434bac93ceec — delivered since 2026-10-08T09:27:37Z

Delivery plan — builds nothing: the change touches no module of the mesh's graph

Transitions

  • 2026-10-08 09:12 (new) → proposed (announced): novox/mesh-lab#64's head announced
  • 2026-10-08 09:13 proposed → checked (checked): the verdict names this commit
  • 2026-10-08 09:13 checked → ready (accepted): the gate passed or warned, and the repository's own check did not fail
  • 2026-10-08 09:27 ready → published (merged): on the trunk its modules follow: merged there, and its walk opened — or nothing for a walk to move
  • 2026-10-08 09:27 published → delivered (done): nothing for a walk to move

The commit's note under refs/notes/mesh-plan keeps every transition: git log --notes=mesh-plan.

<!-- mesh-delivery:view --> **Delivery** `novox/mesh-lab@434bac93ceec` — **delivered** since 2026-10-08T09:27:37Z **Delivery plan** — builds nothing: the change touches no module of the mesh's graph **Transitions** - 2026-10-08 09:12 (new) → proposed (announced): novox/mesh-lab#64's head announced - 2026-10-08 09:13 proposed → checked (checked): the verdict names this commit - 2026-10-08 09:13 checked → ready (accepted): the gate passed or warned, and the repository's own check did not fail - 2026-10-08 09:27 ready → published (merged): on the trunk its modules follow: merged there, and its walk opened — or nothing for a walk to move - 2026-10-08 09:27 published → delivered (done): nothing for a walk to move The commit's note under `refs/notes/mesh-plan` keeps every transition: `git log --notes=mesh-plan`.
jschoubben added 1 commit 2026-10-08 09:12:25 +00:00
Register the replay of issue 309 (hq ADR 0237)
mesh/repo-check pass: its merge-check.sh passed, each part in its toolchain: merge-check.sh (typescript), replays/merge-check.sh (go)
mesh/delivery delivered
mesh/merge-gate pass: the change touches no module of the mesh's graph
434bac93ce
Proved with cmd/prove: TestReplay309 fails on the controller before c5a2edf
(the group refused as a cycle) and passes on it.
jschoubben force-pushed replays/309-an-order-rule-yields-to-a-stronger-one from 535a363ddf to 434bac93ce 2026-10-08 09:12:25 +00:00 Compare
mesh-admin merged commit 99923bed12 into main 2026-10-08 09:27:28 +00:00
mesh-admin deleted branch replays/309-an-order-rule-yields-to-a-stronger-one 2026-10-08 09:27:28 +00:00
Sign in to join this conversation.
No Reviewers
No labels
2 Participants
Notifications
Due Date
No due date set.
Dependencies

No dependencies set.

Reference: novox/mesh-lab#64