R309: the delivery group of the controller, the node-engine and the lab, refused because built by and engine before controller ordered one pair both ways. A test in the controller (cmd/mesh-controller/replay309_test.go, TestReplay309), fix c5a2edf on novox/mesh-controller's 309 branch.
go run ./cmd/prove R309: PROVED — before its fix fails (the group refused as a cycle), on its fix passes. replays/merge-check.sh passes.
Merge after novox/mesh-controller's PR for 309.
R309: the delivery group of the controller, the node-engine and the lab, refused because *built by* and *engine before controller* ordered one pair both ways. A test in the controller (`cmd/mesh-controller/replay309_test.go`, `TestReplay309`), fix c5a2edf on novox/mesh-controller's 309 branch.
`go run ./cmd/prove R309`: PROVED — before its fix fails (the group refused as a cycle), on its fix passes. `replays/merge-check.sh` passes.
Merge after novox/mesh-controller's PR for 309.
Deliverynovox/mesh-lab@434bac93ceec — delivered since 2026-10-08T09:27:37Z
Delivery plan — builds nothing: the change touches no module of the mesh's graph
Transitions
2026-10-08 09:12 (new) → proposed (announced): novox/mesh-lab#64's head announced
2026-10-08 09:13 proposed → checked (checked): the verdict names this commit
2026-10-08 09:13 checked → ready (accepted): the gate passed or warned, and the repository's own check did not fail
2026-10-08 09:27 ready → published (merged): on the trunk its modules follow: merged there, and its walk opened — or nothing for a walk to move
2026-10-08 09:27 published → delivered (done): nothing for a walk to move
The commit's note under refs/notes/mesh-plan keeps every transition: git log --notes=mesh-plan.
<!-- mesh-delivery:view -->
**Delivery** `novox/mesh-lab@434bac93ceec` — **delivered** since 2026-10-08T09:27:37Z
**Delivery plan** — builds nothing: the change touches no module of the mesh's graph
**Transitions**
- 2026-10-08 09:12 (new) → proposed (announced): novox/mesh-lab#64's head announced
- 2026-10-08 09:13 proposed → checked (checked): the verdict names this commit
- 2026-10-08 09:13 checked → ready (accepted): the gate passed or warned, and the repository's own check did not fail
- 2026-10-08 09:27 ready → published (merged): on the trunk its modules follow: merged there, and its walk opened — or nothing for a walk to move
- 2026-10-08 09:27 published → delivered (done): nothing for a walk to move
The commit's note under `refs/notes/mesh-plan` keeps every transition: `git log --notes=mesh-plan`.
Blocking a user prevents them from interacting with repositories, such as opening or commenting on pull requests or issues. Learn more about blocking a user.
R309: the delivery group of the controller, the node-engine and the lab, refused because built by and engine before controller ordered one pair both ways. A test in the controller (
cmd/mesh-controller/replay309_test.go,TestReplay309), fix c5a2edf on novox/mesh-controller's 309 branch.go run ./cmd/prove R309: PROVED — before its fix fails (the group refused as a cycle), on its fix passes.replays/merge-check.shpasses.Merge after novox/mesh-controller's PR for 309.
Delivery
novox/mesh-lab@434bac93ceec— delivered since 2026-10-08T09:27:37ZDelivery plan — builds nothing: the change touches no module of the mesh's graph
Transitions
The commit's note under
refs/notes/mesh-plankeeps every transition:git log --notes=mesh-plan.535a363ddfto434bac93ce